Forwards Rev 2 to Engineering Program Plan & Rev 3 to Project QA Plan Re Independent Design & Const Verification Program
ML20023D503
Person / Time
Site: Midland
Issue date: 05/18/1983
From: Levin H
TERA CORP.
To: Jackie Cook, Eisenhut D, James Keppler
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation
Shared Package
ML20023D504 List:
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8305200553
Download: ML20023D503 (4)


Text

.

o L J 6~ _ __

-)

BERKELEY DALLAS BETHESDA BATON ROUGE DEL MAR NEW YORK SAN ANTONO DENVER LOS ANGELES May 18,1983 Mr. James W. Cook Vice President Consumers Power Company 1945 West Pornoll Road Jackson, Michigan 49201 Mr. J. G. Keppler Administrator, Region 111 Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn,IL 60137 Mr. D. G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulatory U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. 50-329 OM, OL and 50-330 OM, OL Midland Nuclear Plant - Units I and 2 Independent Design and Construction Verification (IDCV) Program Revision of Engineering Program Plan (EPP) and Project Quality Assurance Plan (PGAP)

In accordance with Mr. Eisenhut's letter to Mr. Cook dated March 22,1983, we have modified the EPP to reflect the addition of the Standby Electric Power (SEP) system and the Control Room Heating, Ventilating and Air Condi-tioning (.VAC) system to the scope of the Midland IDCV program. Accordingly, we are pleased to transmit general Revision 2 of the EPP for your review. The revised EPP incorporates comments received from the NRC staff, Consumers pTg 6c Power Company personnel and interested members of the public during o meeting held on April 13,1983 of the NRC's Bethesda, Maryland offices.

M Revision 3 of the PGAP is also transmitted under this cover. This revision l

),sk updates certain personnel matters, incorporates the protocol for the IDCV program communications documented in Mr. Keppler's letter to Mr. Cook dated l March 28,1983 and incorporates various administrative improvements to the p

i plan.

I 8305200553 830518 i PDR ADOCK 05000329 A PDR TERA CORPORATION l 7101 WISCONSIN AVENUE BETHESDA. M ARYLAND 20814 301 654 8960 1

1 1

I Mr. James W. Cook l Mr. J. G. Keppler I Mr. D. G. Eisenhut 2 May I8,1983 l

l 1

In accordance with instructions received from Dori Hood, NRC Midland Project Manager, copies of the EPP and PGAP are transmitted under this cover to the Midland IDCV service list. The addressees and each service list recipient are requested to return the attached Acknowledgement Form signifying receipt of controlled copies of the EPP and PGAP.

Sincerely, n ,(

k .huA Howard Levin Project Manager Midland independent Design and Construction Verification Program cc. L. Gibson, CPC F. Buckman, CPC D. Hood, NRC Enclosures TERA CORPORATION

9 Service List for Midland Independent Design and Construction Verification Program cc: Harold R. Denton, Director Ms. Barbara Stamiris Office of Nuclear Reactor Regulaticin 5795 N. River U.S. Nuclear Regulatory Commission Freeland, Michigan 48623 Washington, D. C. 20555  :

Mr. Wendell Marshall James G. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midland, Michigan 48440 Region III 799 Roosevelt Road Mr. Steve Gadler Glen Ellyn, Illinois 60137 2120 Carter Avenue St. Paul, Minnesota 55108 U.S. Nuclear Regulatory Commission Resident Inspectors Office Billie Pirner Garde Route 7 Director, Citizens Clinic

~

Midland, Michigan 48640 for Accountable Government i

Government Accountability Project Mr. J. W. Cook Institute for Policy Studies Vice President 1901 Que Street, N.W.

Constsners Power Company Washington, D. C. 20009 1945 West Parnall Road Jackson, Michigan 49201 Charles Bechhoefer, Esq.

Atomic Safety & Licensing Board Michael I. Miller, Esq. U.S. Nuclear Regulatory Commission Isham, Lincoln & Beale Washington, D. C. 20555 Three First National Plaza, 51st floor Dr. Frederick P. Cowan

. Chicago, Illinois 60602 Apt. B-125 6125 N. Verde Trail .

James E. Brunner, Esq. Boca Raton, Florida 33433 Constsners Power Company 212 West Michigan Avenue Jerry Harbour, Esq.

Jackson, Michigan 49201 Atomic Safety and Licensing Board l U.S. Nuclear Regulatory Commission l Ms. Mary Sinclair Washington, D. C. 20555 5711 Summerset Drive Midland, Michigan 48640 Mr. Ron Callen Michigan Public Service Commission

Cherry & Flynn 6545 Mercantile Way Suite 3700 P.O. Box 30221 Three First National Plaza Lansing, Michgian 48909 I Chicago, Illinois 60602 Mr. Paul Rau Midland Daily News 124 Mcdonald Street Midland, Michigan 48640

=cUMenT ACKNOWLEDGEMENT FORM MIDLAtO IDCV PROGRAM TO: OLIVIA NEVINS PROJECT ADMINISTRATOR MIDLAND INDEPENDENT DESIGN AND CONSTRUCTION VERIFICATION PROGRAM TERA CORPORATION SUITE 900 7101 WISCONSIN AVENUE BETHESDA, MARYLAND 20814 FROM: b u re.Il Ei.senh &

DOCUMENT CONTROL IDENTIFYING REVISION COPY OUANTITY NUMBER NUMBER TITLE NUMBER I PI-3201-009 2 Engineering Program O/7 Plan i PGAP-3201-004 3 Project Quality Assurance Plan o/f DATE RECEIVED: BY:

TERA CORPORATION