IR 05000369/1983018

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-369/83-18 & 50-370/83-25 on 830418-22.No Noncompliance Noted.Major Areas Inspected:Site Orientation,Review of Security Organization & Security Program Audit.Details Withheld (Ref 10CFR73.21)
ML20023D517
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/17/1983
From: Mcquire D, Tillman A, Uryc B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20023D508 List:
References
50-369-83-18, 50-370-83-25, NUDOCS 8305200565
Download: ML20023D517 (1)


Text

eJFEGUA89eosmess INFORMAT e "870 a

p

g jo NUCLEAR REGULATORY COMMISSION

'

g u

n REGION ll U

$

101 MARIETTA ST N.W SUITE 3100

8 ATLANTA. GEORGIA 30303

,%.

./

-

MM i 71983

...

Report Nos. 50-369/83-18 and 50-370/83-25 Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Facility Name: McGuire 1 and 2 Inspection at: McGuire site, Lake Norman, NC Inspection condJcted: April 18 - 22, 1983 Date of Last Physical Security Inspection Visit: February 23 - 25, 1983 Type of Inspectio 0 announced Ph sicalsSecurity Inspectors:

/ ' // m

[/V/4//

/ k A.'

lim ~ yys'ical~S6cubity Inspector Bate'Si ned Yh L/UA/]

$ }9 k$

B. Uryc J.

Phytical SecuFity Inspector

@atV Signed Approver by:

M m

D. R. McGuiFe, Chief, Physical Security Section Late' Signed Safeguards Branch, Division of Emergency Preparedness and Materials Safety Programs Inspection Summary Area Inspected:

Included Site Orientation; Review of Security Organization-Management; Security Organization-Personnel; Security Organization-Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers-Protected Area; Physical Barriers-Vital Areas; Lighting; Assessment Aids; Access Controls-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-Protected Area; Communications; General Requirements for Personnel; Additional Requirements for Power Reactor Personnel; and Safeguards Contingency Plan Implementation Review.

The inspection involved 58 inspector hours on site by two NRC inspectors. The inspection was begun during an offshift period; eight inspection hours were accomplished during offshift periods.

'

Results:

The licensee was found to be in compliance with NRC requirements within the 21 areas examined during the inspection.

8305200565 830517

,

DR ADOCK 05000369 ENCLOSURE CONTAINS

'

g PDR SAFEGUARDS INFOMATION.

uppy33,ggr71937373

" " " * " ".