Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000029/LER-1983-012, Supplemental LER 83-012/01T-1:on 830405,bonnet Stud Found to Have Failed on PR-MOV-191.Caused by Slight Leakage from Valve.Valve Replaced w/1 1/2-inch Pacific Model 5-31552-12-X Gate Valve + (05:39:18, 21 December 2024)
- 05000245/LER-1983-018-03, /03L-0:on 830517,gas Turbine Started & Achieved Ready to Load Status within 50.74 S.Tech Specs Require 48 S. Caused by Natural end-of-life of Components.One Ignitor Replaced.Second to Be Replaced Later + (05:39:23, 21 December 2024)
- ML20024A878 + (05:39:24, 21 December 2024)
- 05000029/LER-1983-018-03, /03L-0:on 830518,body-to-bonnet Leak Found on Pacific Valve,Inc Valve 5A-V-603,causing 5 H Valve & Steam Generator Blowdown Monitor 3 Isolation.Caused by Failure of body-to-bonnet Joint Gasket + (05:39:26, 21 December 2024)
- ML20024A876 + (05:39:27, 21 December 2024)
- ML20024A875 + (05:39:27, 21 December 2024)
- JAFP-83-0638, Responds to IE Bulletin 83-05, ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co. No ASME Code Pumps or Spare Parts Mfg by Hayward Tyler Pump Co Used in Facility + (05:39:28, 21 December 2024)
- ML20024A873 + (05:39:30, 21 December 2024)
- ML20024A871 + (05:39:31, 21 December 2024)
- IR 05000271/1982023 + (05:39:32, 21 December 2024)
- PNO-I-83-069, on 830624,high Reactor Water Level Scram Resulted from Loss of Offsite Power.Caused by Extensive Damage to Primary & Secondary Windings of Startup Transformer C Phase.Evaluation Underway + (05:39:40, 21 December 2024)
- ML20024A866 + (05:39:41, 21 December 2024)
- ML20024A865 + (05:39:42, 21 December 2024)
- ML20024A864 + (05:39:43, 21 December 2024)
- 05000320/LER-1983-014-03, Air Intake Tunnel Halon Sys Actuated,Causing Actuation of Deluge Sys & Trip of Auxiliary & Fuel Handling Bldgs Supply & Exhaust Fans.Caused by Short in Actuation Leads.Sys Repaired + (05:39:47, 21 December 2024)
- ML20024A861 + (05:39:56, 21 December 2024)
- ML20024A860 + (05:39:56, 21 December 2024)
- IR 05000220/1983012 + (05:40:03, 21 December 2024)
- IR 05000309/1983008 + (05:40:06, 21 December 2024)
- ML20024A855 + (05:40:10, 21 December 2024)
- ML20024A854 + (05:40:10, 21 December 2024)
- ML20024A853 + (05:40:12, 21 December 2024)
- ML20024A850 + (05:40:16, 21 December 2024)
- ML20024A848 + (05:40:17, 21 December 2024)
- 05000029/LER-1983-020-03, /03L-0:on 830524,during Performance of Safety Injection,Setpoint of Time Delay Relay 4 Found Out of Tech Spec Limits.Caused by Setpoint Drift.Setpoint Readjusted + (05:40:19, 21 December 2024)
- IR 05000410/1983005 + (05:40:22, 21 December 2024)
- TAC:49703 + (05:40:24, 21 December 2024)
- ML20024A844 + (05:40:24, 21 December 2024)
- ML20024A842 + (05:40:26, 21 December 2024)
- ML20024A843 + (05:40:26, 21 December 2024)
- ML20024A841 + (05:40:27, 21 December 2024)
- ML20024A837 + (05:40:34, 21 December 2024)
- 05000245/LER-1983-020-01, /01T-0:on 830607,while Performing Cleanup Sys Rounds,Crack Indication Identified on Weldolet Weld.Caused by Vibration & Fatigue During Blowdown Through Relief Valve. Weldolets to Be Visually Inspected + (05:40:35, 21 December 2024)
- AECM-83-0370, Forwards,For NRC Review & Approval,Proposed Changes to Tech Specs,Enhancing Clarity & Providing Consistency W/Plant Design & application.Marked-up Tech Spec Justification for Determination Encl + (05:40:37, 21 December 2024)
- IR 05000219/1983014 + (05:40:41, 21 December 2024)
- 05000029/LER-1983-019-03, /03L-0:on 830523,lightning Strike Caused Z-126 115 Kv Transmission Line at Harriman Hydro Station Switchyard to Open & Lock Out,Resulting in Loss of Continuity of Circuit + (05:40:43, 21 December 2024)
- PLA-1719, Responds to NRC Re Violations Noted in IE Insp Repts 50-387/83-11 & 50-388/83-04.Corrective Actions:Review of Panels 2C661 B2 & B3 & 2C612 Will Be Performed to Ensure That Lifted Leads & Fuses Are Properly Controlled + (05:40:45, 21 December 2024)
- ML20024A830 + (05:40:47, 21 December 2024)
- IR 05000387/1983011 + (05:40:48, 21 December 2024)
- ML20024A825 + (05:40:53, 21 December 2024)
- ML20024A824 + (05:40:54, 21 December 2024)
- IR 05000272/1983018 + (05:40:56, 21 December 2024)
- PNO-I-83-071, on 830627,licensee Began Shutting Down to Inspect for Unidentified RCS Leakage.Licensee Identified Two Packing Leaks on 830628.Outage Estimated to Last 3-4 Days + (05:40:58, 21 December 2024)
- A02912, Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. No Assemblies Mfg by Bunker-Ramo Co in Svc or Planned to Be Placed in Svc at Plant + (05:40:59, 21 December 2024)
- ML20024A820 + (05:41:00, 21 December 2024)
- ML20024A818 + (05:41:02, 21 December 2024)
- ML20024A817 + (05:41:03, 21 December 2024)
- IR 05000410/1983009 + (05:41:04, 21 December 2024)
- ML20024A815 + (05:41:05, 21 December 2024)
- ML20024A814 + (05:41:06, 21 December 2024)
- ML20024A812 + (05:41:07, 21 December 2024)