ML20024A848

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-309/83-08 on 830503-05.No Noncompliance Noted
ML20024A848
Person / Time
Site: Maine Yankee
Issue date: 06/17/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Randazza J
Maine Yankee
Shared Package
ML20024A849 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8307010038
Download: ML20024A848 (2)


See also: IR 05000309/1983008

Text

__

l, i

. , -

j w 1 7 1983

Docket No. 50-309

Maine Yankee Atomic Power Company

ATTN:

Mr. J. B. Randazza

Vice President

Nuclear Operations

83 Edison Drive

Augusta, Maine 04336

,

Gentlemen:

Subject: Inspection No. 50-309/83-08

This refers to the special safety inspection conducted by Mr. W. Lazarus of

this office on May 3-5, 1983 at Maine Yankee Nuclear Power Station, Wiscasset,

Maine and the Yankee Atomic Electric Company office, Framingham, Massachussetts

of activities authorized by NRC License No. DPR-36 and to the discussions of

our findings held by Mr. W. Lazarus with Mr. E. Wood of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1). The telephone notification of your intent to

request withholding, or any request for an extension of the 10-day period

which you believe necessary, should be made to the Supervisor, Files, Mail and

Records, USNRC Region I, at (215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

1

Sincerely, original signed By:

T

.

.

Richard W. Starostecki, Direc or

C

Division of Project and Resident

/

Programs

Enclosure: NRC Region I Inspection Report No. 50-309/83-08

8307010038 830617

.

g[

0FFICIAL RECORD COPY

DR ADOCK 05000 0

y/;

j

.

.*

..

Juti 171983

Maine Yankee Atomic Power Company

2

cc w/ encl:

E. W. Thurlow, President

J. H. Garrity, Senior Director, Nuclear Engineering and Licensing

E. C. Wood, Plant Manager

R. H..Groce, Senior Engineer, Licensing (YAEC)

J. A. Ritsher, Attorney (Ropes and Gray)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maine

bec w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Of ficer (w/o encis)

DPRP Section Chief

K. Heitner, LPM

h

"

D$ Pix'

r[JI:DGreeamene/4

'~# #'

RI:DPRP

RI:DPRP

9ttazerus/;Pf

xeii y

<G

Sgyp

coga3

o P1C1At aECoaD CoeY

.

b-

-

-,,a

e