IE Mgt Meeting Rept 50-410/83-09 on 830523.Major Areas Discussed:Util Overview of Contractor Performance at Const Site
ML20024A816
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/13/1983
From: Keimig R, Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20024A813 List:
References
50-410-83-09, 50-410-83-9, NUDOCS 8307010005
Download: ML20024A816 (2)


Text

n-

'

.

.

-

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. 50-410/83-09 Docket No. 50-410

'

License No.

CPPR-ll2 Priority

--

Category A

Licensee:

Niagara Mohawk Power Corporation 300 Erie Bou,levard, West Syracuse, New York 13202 Facility Name:

Nine Mile Point Unit 2 Meeting at:

USNRC Region I, King of Prussia, Pennsylvania Meeting conducted:

May 23, 1983 NRC Personnel:

d 6 7 fd H. tl K19ter, Chiet, Reactor Projects dats signed Section 2C

.

date signed dat sig ed b /3 D Approved by:

." R. Keiinid, Chief, Projects Branch date sitJned No. 2, DPRP Meeting Summary:

Management Conference on May 23, 1983 (Report No. 50-410/83-09)

Summary: Special management conference convened by NRC Region I management to dis-cuss NRC concerns relating to Niagara Mohawk's overview of contractor performance at the Nine Mile Point Unit 2 construction site. The meeting was two hours in duration.

8307010005'830614 PDR ADOCK 05000 G

Region I Form 12-1 (Rev. February 1982)

!

,

.

_

s

.

.,

k DETAILS 1.

Attendees

'

Niagara Mohawk Power Corporation D..P. Dise, Vice President, Quality Assurance

,

S. F. Manno, Vice President, Nuclear Construction D.' Palmer, Manager, Quality Assurance

-

,

G.-L. Rhode, Senior Vice President, System Project Management

'

U.S. Nuclear Regulatory Commission S.'D. Ebneter, Chief, Eng'ineering Pro * grams Branch (Part-time)

R. R. Keimig, Chief, Projects Branch No. 2 r

H.-B. Kister, Chief, Reactor Projects Sect, ion 2C R. W. Starosteck1, Director, Division of Project and Resident Programs

,

2.

Discussion j,,

Region I opened by stating that the purpose of the meeting was to obtain a

,

more firm understanding of Niagara Mohawk's (NMPC) approach and progress re-

'

garding resolution of previously noted problems with contractor performance in the Quality Assurance / Quality Control area; especially.in view of recent ITT Grinnell QA/QC problems currently under review by NRC.- j.

~

NMPC responded by describing the status of their ongoing acti6ns noting that communications were improving and NMPC surveillance of contractors was in- -

creasing.

,

<

ITT Grinnell QA/QC staffing was discussed. NMPCstatedthatduetothIedif-ficulties in recruiting, the QA Manager position was not yet filled. Region I urged that NMPC take a more active role in assuring that this key position be filled promptly.

' ^

,

The meeting c6ncluded with the understanding that.NMPC would be prepared to meet again in six weeks to discuss the~ status of their ongoing actions for improving contractor perfonnance.