Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028B308 + (00:18:53, 21 December 2024)
- ML20028B307 + (00:18:54, 21 December 2024)
- ML20028B305 + (00:18:57, 21 December 2024)
- ML20028B301 + (00:19:02, 21 December 2024)
- ML20028B303 + (00:19:02, 21 December 2024)
- ML20028B300 + (00:19:03, 21 December 2024)
- ML20028B298 + (00:19:04, 21 December 2024)
- ML20028B299 + (00:19:04, 21 December 2024)
- B10597, Forwards Primary Features of Physical Security Plan.Features Withheld (Ref 10CFR2.790) + (00:19:05, 21 December 2024)
- ML20028B296 + (00:19:05, 21 December 2024)
- 1CAN118207, Responds to NRC Requesting Responses Re Inservice Testing Program.List of Submittals Applicable to Proposed Testing Program Submitted + (00:19:07, 21 December 2024)
- ML20028B293 + (00:19:09, 21 December 2024)
- 05000373/LER-1982-130-03, /03L-0:on 821019,leak Discovered in Socket Weld of Mechanical Seal Injection Line Valve for Condensate/ Condensate Booster Pump 1A.Caused by Cracked Weld Due to Vibrational Stress.Injection Line Replaced + (00:19:11, 21 December 2024)
- 05000373/LER-1982-130, Forwards LER 82-130/03L-0 + (00:19:13, 21 December 2024)
- GO2-82-937, Interim Deficiency Rept 215 Re Skewed T-joint Welds. Initially Reported on 821022.Welds Lack Required Leg Length. Insp Sampling Plan Initiated for Large Bore Pipe Supports. Next Rept Expected by 830222 + (00:19:14, 21 December 2024)
- ML20028B287 + (00:19:15, 21 December 2024)
- ML20028B285 + (00:19:16, 21 December 2024)
- ML20028B286 + (00:19:16, 21 December 2024)
- ML20028B283 + (00:19:21, 21 December 2024)
- ML20028B280 + (00:19:26, 21 December 2024)
- ML20028B279 + (00:19:27, 21 December 2024)
- ML20028B278 + (00:19:28, 21 December 2024)
- ML20028B276 + (00:19:29, 21 December 2024)
- ML20028B273 + (00:19:30, 21 December 2024)
- IR 05000454/1982019 + (00:19:31, 21 December 2024)
- 05000311/LER-1982-125-03, /03L-0:on 821013,test Sequence for Steam Line Isolation Function on Train B Failed to Operate During Solid State Protection Sys Functional Test.Caused by Failed Circuit Board.Board Replaced & Functional Test Completed + (00:19:33, 21 December 2024)
- IR 05000097/1982001 + (00:19:35, 21 December 2024)
- ML20028B268 + (00:19:37, 21 December 2024)
- ML20028B269 + (00:19:37, 21 December 2024)
- ML20028B266 + (00:19:38, 21 December 2024)
- ML20028B264 + (00:19:39, 21 December 2024)
- ML20028B263 + (00:19:40, 21 December 2024)
- ML20028B262 + (00:19:41, 21 December 2024)
- IR 05000387/1982034 + (00:19:42, 21 December 2024)
- ML20028B259 + (00:19:43, 21 December 2024)
- ML20028B258 + (00:19:44, 21 December 2024)
- ML20028B257 + (00:19:45, 21 December 2024)
- ML20028B256 + (00:19:46, 21 December 2024)
- ML20028B255 + (00:19:46, 21 December 2024)
- ML20028B253 + (00:19:47, 21 December 2024)
- ML20028B251 + (00:19:48, 21 December 2024)
- ML20028B250 + (00:19:49, 21 December 2024)
- 05000311/LER-1982-125, Forwards LER 82-125/03L-0.Detailed Event Analysis Encl + (00:19:50, 21 December 2024)
- ML20028B247 + (00:19:51, 21 December 2024)
- ML20028B244 + (00:19:53, 21 December 2024)
- FVY-82-120, Forwards List of Previous Submittals Re NUREG-0737,Item II.B.3, Post-Accident Sampling Sys. Final Design Verification Calculations for post-accident Sampling Sys Being Performed.Mods to Be Installed During Mar 1983 + (00:19:54, 21 December 2024)
- ML20028B239 + (00:19:56, 21 December 2024)
- 05000244/LER-1982-024-03, /03L-0:on 821021,RPI for Control Rod K-7 Declared Inoperable.Rpi Repaired Indicator Replaced,Connection in Main Control Board Replaced & RPI Returned to Svc + (00:20:00, 21 December 2024)
- IR 05000354/1982011 + (00:20:02, 21 December 2024)
- ML20028B234 + (00:20:04, 21 December 2024)
- ML20028B229 + (00:20:09, 21 December 2024)