Docket Nos. 50-528/529/530 50.55(e) Report RE VED Arizona Public Service Company
, 2 kh/ pp ro sox mee. PHOEN:X. ANZoNA 85036 November 17, 1982 N 4/
ANPP-22377-GHD/BSK REG l@y, U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 liaria Lane - Suite 210 Walnut Creek, California Attention:
Mr. D. M. Sternberg, Chief Reactor Projects Branch 1
Subject:
Interim Report - DER 82-57 A 50.55(e) Reportable Deficiency Relating to Auxiliary Feedwater Valves Are Carbon Steel Instead Of Stainiera, Due To Error In Purchase Order JM-601A File: 82-019-026 D.4.33.2
Reference:
Telephone Conversation between J. Eckhardt and G. Duckworth on October 15, 1982
Dear Sir:
The NRC was notified of a potential reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interin Report is attached. It is now expected that this information will be finalized by December 28, 1982, at which time a complete report will be submitted.
Very truly yours, C
Y.
CLLL \\
NLL E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director l
EEVBJr/GHD:db Enclosure cc: See Attached Page 2 lM]
... _ _ _. i 8211300246 821117 PDR ADOCK 05000528 1
S PDR
e U. S. Nucicar Regulatory Commission November 15, 1982 Attention:
Mr. D. M. Sternberg, Chief ANPP-22277-GIID/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Ilawkinson L. E. Vorderbrueggen G. A. Fiorelli J. R. Bynum Lynne Bernabel, Esq.
Ilarmon & Weiss 1725 "I" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 37503 l
l l
y
s INTERIM REPORT - DER 82-57 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1, 2 & 3 I.
POTENTIAL PROBLEM As discovered by the Torrey Pines Technology Independent QA Evaluation, drawings 13-P-ZZG-012 and 13P-ZZG-013 require 3" through 8" globe valves identified by mark #350 be constructed of SA351 GR CF 8M or SA182 GR F316 (stainless steel material).
Contrary to the above drawings, valves AFB-HB-30, AFB-HV-31, AFA-HV-32 and AFC-HV-33 were supplied with a body made of SA105 and SA106 carbon steel material as per motor actuated valve data sheet 13-J-081-060, Revision 1.
These valves are installed at the auxiliary feedwater discharge lines to throttle demineralized water flow to the steam generators during an Auxiliary Feedwater Actuation Signal (AFAS) occurrence.
The cause of this problem is attributed to an oversight whereby the valve data sheet prepared and issued by project engineering for construction contained the incorrect material requirement.
II.
APPROACH TO AND STATUS OF PROPOSED RESOLUTION Bechtel's Material and Quality Services Department (M&QS) will evaluate the servicability of carbon steel valves in this situation, or the need for replacement. The other valve data sheets will be reviewed to ensure that all valves are correctly specified.
III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBMITTAL OF THE FINAL REPORT Evaluation of this condition and submittal of the Final Report is forecast to be completed by December 28, 1982.