Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20098F7641984-09-27027 September 1984 Discusses Purchasing & Wheeling of Energy to Kirkwood,Mo. Problems Such as Energy Cost,Wheeling Cost & Present Rate Filing of Union Electric for Partial Requirement Customers Need Resolution ML20083C9731983-12-21021 December 1983 Forwards to Region III in Reply to NRC Re Integrated Design Insp Rept,Per 831206 Commitment ML20071M2801983-05-26026 May 1983 Advises That Table of Contents & Table of cross-refs to NUREG-0654 Planning Stds/Evaluation Criteria Adequate to Locate Portions Relevant to Contentions.Referenced Portions of Plans Listed ML20023D6301983-05-20020 May 1983 Confirms Delivery of Gasconade & Montgomery County Radiological Emergency Response Plans on 830519.Svc List Encl.W/O Encl Ltrs ML20023D1101983-05-17017 May 1983 Confirms Util Delivery of State of Mo Accident Plan for Plant & Osage County Radiological Emergency Response Plan. Svc List Encl ML20073T3331983-05-0909 May 1983 Confirms Svc of Callaway County/Fulton County Radiological Emergency Response Plan on 830506.Plans for Osage Gasconade & Montgomery Counties & State Plan Forthcoming.Svc List Encl ML20090J4711982-12-30030 December 1982 Comments on Encl Draft Cultural Resources Mgt Plan for Residential Lands at Union Electric Co,Callaway Nuclear Power Plant,Callaway,Mo & Phase I Cultural Resources Survey & Assessment on Residential Lands.. ML20028B3011982-11-22022 November 1982 Forwards Revised Interrogatory 47,per 821119 Telcon.Related Correspondence ML20066F7831982-11-17017 November 1982 Confirms Util Commitment to Provide Equipment Identified in Util to Montgomery County,Md Sheriff for Traffic Control Locations.Svc List Encl ML20027E3481982-11-0808 November 1982 Forwards Motion to Compel Jg Reed Responses to Applicant 821020 Revised Interrogatories.Certificate of Svc Encl ML20065T3911982-10-27027 October 1982 Forwards Objections to Util Interrogatories.No Documents Referenced Which Are Not in Util Files.Related Correspondence ML20069J7591982-10-20020 October 1982 Forwards Revised Interrogatories & Requests of Jg Reed for Production of Documents.Responses Due 821113 & Objections Due 821027,per Stipulated Schedule.Requests Replace Util 820715 Interrogatories & Requests.Certificate of Svc Encl ML20063M6411982-09-13013 September 1982 Forwards List of Interrogatories Util Withdrew Due to Info Provided in Jg Reed Deposition.Svc List Encl.Related Correspondence ML20062L5151982-08-17017 August 1982 Forwards Revised Radiological Emergency Response Plan.W/O Encl ML20052C6061982-04-30030 April 1982 Confirms Jg Reed Receipt of First Draft SOPs for Gasconade, Osage,Montgomery & Callaway Counties & City of Fulton.Svc List Encl ML20010H5531981-09-17017 September 1981 Advises of Typographical Error in Response to Applicants Interrogatories,Set 1,on Contention 2.Certificate of Svc Encl.Related Correspondence ML20005A4171981-06-23023 June 1981 Forwards Applicant Response in Opposition to Joint Intervenors' First Set of Interrogatories.Related Correspondence ML20008G2251981-05-0606 May 1981 Forwards Draft Applicant Response to 810324 Document Production Request.Related Correspondence ML19350A9111981-03-12012 March 1981 Reiterates That Both Mo Historic Preservation Program & Advisory Council on Historic Preservation Should Be Allowed to Review Final Scope of Work for Cultural Survey Prior to Union Electric Final Agreements ML19259B4611979-12-19019 December 1979 Requests Assistance in Responding to Constituent D Haenke ML19224D3951979-05-22022 May 1979 Ack Receipt of Recent Ltr Re Careless Plant Const.State Govt Has Little Authority,Due to pre-emptions by Nrc,As Mandated by Congress.Forwards Ltr to Mo Senators Eagleton & Danforth,Representative Volkner & NRC ML19259B4601979-01-11011 January 1979 Ack Receipt of 781219 Referral of Ltr from D Haenke Re Const of Nuclear Power Plants Currently Being Built in Mo.Asserts That Disposal of Other than High Level Waste from Plants Has Been Routinely Handled for Years ML19259B4621978-12-12012 December 1978 Expresses Concern Re Const of Nuclear Power Plants in Mo. Asks Questions Re Costs,Radioactive Wastes,Accidents 1984-09-27
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20098F7641984-09-27027 September 1984 Discusses Purchasing & Wheeling of Energy to Kirkwood,Mo. Problems Such as Energy Cost,Wheeling Cost & Present Rate Filing of Union Electric for Partial Requirement Customers Need Resolution ML20083C9731983-12-21021 December 1983 Forwards to Region III in Reply to NRC Re Integrated Design Insp Rept,Per 831206 Commitment ML20071M2801983-05-26026 May 1983 Advises That Table of Contents & Table of cross-refs to NUREG-0654 Planning Stds/Evaluation Criteria Adequate to Locate Portions Relevant to Contentions.Referenced Portions of Plans Listed ML20023D6301983-05-20020 May 1983 Confirms Delivery of Gasconade & Montgomery County Radiological Emergency Response Plans on 830519.Svc List Encl.W/O Encl Ltrs ML20023D1101983-05-17017 May 1983 Confirms Util Delivery of State of Mo Accident Plan for Plant & Osage County Radiological Emergency Response Plan. Svc List Encl ML20073T3331983-05-0909 May 1983 Confirms Svc of Callaway County/Fulton County Radiological Emergency Response Plan on 830506.Plans for Osage Gasconade & Montgomery Counties & State Plan Forthcoming.Svc List Encl ML20028B3011982-11-22022 November 1982 Forwards Revised Interrogatory 47,per 821119 Telcon.Related Correspondence ML20066F7831982-11-17017 November 1982 Confirms Util Commitment to Provide Equipment Identified in Util to Montgomery County,Md Sheriff for Traffic Control Locations.Svc List Encl ML20027E3481982-11-0808 November 1982 Forwards Motion to Compel Jg Reed Responses to Applicant 821020 Revised Interrogatories.Certificate of Svc Encl ML20065T3911982-10-27027 October 1982 Forwards Objections to Util Interrogatories.No Documents Referenced Which Are Not in Util Files.Related Correspondence ML20069J7591982-10-20020 October 1982 Forwards Revised Interrogatories & Requests of Jg Reed for Production of Documents.Responses Due 821113 & Objections Due 821027,per Stipulated Schedule.Requests Replace Util 820715 Interrogatories & Requests.Certificate of Svc Encl ML20063M6411982-09-13013 September 1982 Forwards List of Interrogatories Util Withdrew Due to Info Provided in Jg Reed Deposition.Svc List Encl.Related Correspondence ML20062L5151982-08-17017 August 1982 Forwards Revised Radiological Emergency Response Plan.W/O Encl ML20052C6061982-04-30030 April 1982 Confirms Jg Reed Receipt of First Draft SOPs for Gasconade, Osage,Montgomery & Callaway Counties & City of Fulton.Svc List Encl ML20010H5531981-09-17017 September 1981 Advises of Typographical Error in Response to Applicants Interrogatories,Set 1,on Contention 2.Certificate of Svc Encl.Related Correspondence ML20005A4171981-06-23023 June 1981 Forwards Applicant Response in Opposition to Joint Intervenors' First Set of Interrogatories.Related Correspondence ML20008G2251981-05-0606 May 1981 Forwards Draft Applicant Response to 810324 Document Production Request.Related Correspondence ML19350A9111981-03-12012 March 1981 Reiterates That Both Mo Historic Preservation Program & Advisory Council on Historic Preservation Should Be Allowed to Review Final Scope of Work for Cultural Survey Prior to Union Electric Final Agreements ML19259B4611979-12-19019 December 1979 Requests Assistance in Responding to Constituent D Haenke ML19224D3951979-05-22022 May 1979 Ack Receipt of Recent Ltr Re Careless Plant Const.State Govt Has Little Authority,Due to pre-emptions by Nrc,As Mandated by Congress.Forwards Ltr to Mo Senators Eagleton & Danforth,Representative Volkner & NRC ML19259B4601979-01-11011 January 1979 Ack Receipt of 781219 Referral of Ltr from D Haenke Re Const of Nuclear Power Plants Currently Being Built in Mo.Asserts That Disposal of Other than High Level Waste from Plants Has Been Routinely Handled for Years ML19259B4621978-12-12012 December 1978 Expresses Concern Re Const of Nuclear Power Plants in Mo. Asks Questions Re Costs,Radioactive Wastes,Accidents 1984-09-27
[Table view] |