ML20028B273
| ML20028B273 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/19/1982 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19295G619 | List: |
| References | |
| 3F-1182-24, TAC-48844, NUDOCS 8211300231 | |
| Download: ML20028B273 (2) | |
Text
, _ _ _ _ _ _ _ _ _ _
- e' %g _
f r: ;b o
tz
~
y,,:Q f/1 F
(-
- j $
qR. : g+ g-y
- n
%3ftP M
-.o.....e..Pwr November 19, 1982
- 3F-Il82-24 File: 3-0-3-e Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Technical Specification Change Request Nc. 98
Dear Mr. Denton:
On May 28,1982, Florida Power Corporation (FPC) submitted Technical Specification Change Request No. 98 (TSCRN98) requesting, in part, approval for unit operation up to 1400 MWt with three (3) reactor coolant pumps. The attached report, " Crystal River Unit 3 RPS Instrument Accuracies," documents the information provided to your staff in a meeting on October 1, 1982, in suppcrt of TSCRN98 This report provides information used in determining errors for instrument strings in the Crystal River Unit 3 (CR3) Reactor Protection System (RPS). The instrument errors discussed in the report were used to error adjust the setpoints in the RPS. The three-pump (and four-pump) curves for the Power / Imbalance / Flow safety limits and trip setpoints included in TSCRN98 were determined with information in this report.
Attachment A is a non-proprietary version of the above-referenced report. Attach-ment B is a proprietary version of the report as determined by Babcock & Wilcox in accordance with 10LFR2.790. The affidavit supporting this determination is included in Attachment B.
A W
1 8211300231 821119
~ '
PDR ADOCK 05000302 P
PDR General Office 3201 Trurtetourin street soutn. P O Box 14042, St Petersburg. Florca 33733 e 813-866-5151
v Mr. Harold R. Denton
- 3F-1182-24 Page 2 This completes the information requested to complete the review of TSC Your review and approval of this request is appreciated.
Very truly yours, Q
O Dr. Patsy Y. Baynard
- Assistant to Vice President Nuclear Operations RMB:mm cc:
Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303
.