ML20028B264

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/82-19 & 50-455/82-14 on 820916-17 & 21-22 & Notice of Violation
ML20028B264
Person / Time
Site: Byron  
Issue date: 11/12/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20028B265 List:
References
NUDOCS 8211300222
Download: ML20028B264 (2)


See also: IR 05000454/1982019

Text

_

(-

_

_ _

.

'

.

NOV 12 BB2

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. Mendez

of this office on September 16-17 and 21-22, 1982, of activities at Byron

Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-130 and No. CPPR-131 and to the discussion of our findings with

R. Klingler at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection .onsisted of a selective

examination of procedures and representative recordo, observations, and in-

'

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

,

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

'

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

,

'

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

'

>

l

!

.

.

..

. . . . . . . . . .

~

-..

F2113OO222 821112

',

[h/

PDR ADOCK 05000454

0

PDR

__ ,

.

. - .

~

r

'

.

Commonwealth Edison Company

2

be accompanied by an affidavit executed by the owner of the information

which identifir the document or part sought to be withheld, and which

contains a

f,'

statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"orintnni sig.ed 'cy C.E. l'orcitus"

C. E. Norelius, Director

Division of Engineering and

Technical Programs

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

No. 50-454/82-19(DETP)

and 50-455/82-14(DETP)

i

cc w/encis:

'

Louis 0. De1 George, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DNB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Karen Borgstadt, Office of

Assistant Attorney General

Myron M. Cherry

RIII

RIII

RI

RIJJf

RIII

g?rt

h

i~g4

Mendez/sv

Williams

t le

Hayes

hore ius

10/20/82

/;

/

gfg8

pg/gv

,, /m/9s

l