NOV 12 BB2
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. Mendez
of this office on September 16-17 and 21-22, 1982, of activities at Byron
Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-130 and No. CPPR-131 and to the discussion of our findings with
R. Klingler at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection .onsisted of a selective
examination of procedures and representative recordo, observations, and in-
'
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
,
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
'
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
,
'
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
'
>
l
!
.
.
..
. . . . . . . . . .
~
-..
F2113OO222 821112
',
[h/
PDR ADOCK 05000454
0
__ ,
.
. - .
~
r
'
.
Commonwealth Edison Company
2
be accompanied by an affidavit executed by the owner of the information
which identifir the document or part sought to be withheld, and which
contains a
f,'
statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"orintnni sig.ed 'cy C.E. l'orcitus"
C. E. Norelius, Director
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-454/82-19(DETP)
and 50-455/82-14(DETP)
i
cc w/encis:
'
Louis 0. De1 George, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DNB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Karen Borgstadt, Office of
Assistant Attorney General