Interim Deficiency Rept Re Installation of B&W Supplied, nonseismically-qualified Transmitter Mounting Brackets for Transmitters Forming Part of Rcpb.Final Field Change Authorization Expected by 821231.Next Rept by 830506
ML20028B229
Person / Time
Site: Midland
Issue date: 11/15/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 19095, 82-08-#3, 82-8-#3, 82-8-3, NUDOCS 8211300189
Download: ML20028B229 (2)


Text

. _.

Consumers Power James W Cook CompBHY Vice President - Projects, Enginer,ing and Construction Generet Offices: 1946 West Pernell Road, Jockeon, MI 49201 * (517) 78& O453 November 15, 1982 82-08 #3 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region Ill 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR C0 GENERATION PLANT DOCKET NOS 50-329 AND 50-330 UPGRADE OF B&W NON-SEISMIC TRANSMITTERS MOUNTING BRACKETS FILE:

0.4.9.64 SERIAL:

19095

References:

J W Cook letters to J G Keppler, Same

Subject:

(1) Serial 17538, dated July 2,1982 (2) Serial 17591, dated August 31, 1982 This letter, as were references 1 and 2, is an interim 10 CFR 50.55(e) report concerning the installation of B&W-supplied, non-seismically qualified transmitter mounting brackets for transmitters forming part of the reactor coolant pressure boundary. The assumption of multiple failures of these brackets and their corresponding transmitters during a seismic event could result in an unanalyzed plant condition. As explained in reference 2, the resolution of this concern is to be accomplished by replacing the non-seismically qualified mounting brackets with seisnically qualified mounting brackets and demonstrating that the structural integrity of the existing transmitters mounted on the replacement brackets is not compromised during a seismic event.

CPCo has received a draft field change authorization (FCA) from B&W describing the seismic qualification of the existing transmitters with the replacement brackets. The draft FCA has been approved with comments by Bechtel, and B&W is expected to submit the final FCA by December 31, 1982.

Our present schedule requires the qualified replacement brackets to be shipped to the site and installed with transmitters prior to initial fuel load.

~"

8211300189 821115 ' ~

PDR ADOCK 05000329 S

PDR OC1182-0019A-MP01 NOV 2 41982

2 O

Another report, either interin or final, will be sent on or before May 6,

1983, atua 4). M WRB/WRS/lr CC: Document Control Desk, NRC Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel J11 arbour, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNRC FJKelley, Esq, Attorney General SHFreeman, Esq Asst Attorney General WilMarshall CJMerritt, Esq TNK&J OC1182-0019A-MP01