Forwards IE Insp Rept 50-245/82-20 on 820927-1001.No Noncompliance Noted
ML20028B308
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/03/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20028B309 List:
References
NUDOCS 8211300274
Download: ML20028B308 (2)


See also: IR 05000245/1982020

Text

.

.

4

h0V 031982

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection Report No. 50-245/82-20

This refers to the routine safety inspection conducted by Mr. R. A. McBrearty

of this office on September 27 - October 1, 1982 at Millstone Nuclear Power

Station Unit 1, Waterford, Connecticut of activities authorized by NRC License

No. DPR-21 and to the discussions of our findings held by Mr. McBrearty with

Mr. E. Mroczka of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representa-

tive records, interviews with personnel, and observations by the inspector.

Within the scope of thi< inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

,

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1). The telephone notification of your intent to

request withholding, or any request for an extension of the 10 day period

which you believe necessary, should be made to the Supervisor, Files, Mail and

Records, USNRC Region I, at (215) 337-5223.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

  1. x M

"

urisinal signed Bya

Thomas T. Martin, Director

Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report Number 50-245/82-20

0FFICIAL RECORD COPY

4

8211300274 821103

J

,

PDR ADOCK 05000245

'

G

PDR

. - .

.-

.

-

_

_

.

__

_

_

.

e

4

03 1982

Northeast Nuclear Energy Co.

2

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

'

.

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

NRC Resident Inspector

State of Connecticut

'

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

T. Elsasser, DN'.P

,

1

4

RI:DPRP

RI:DPRP

RI:DPRP

ty/pja

Dgl*.

Ebneter IfgV

2 82

w/s*

IIf

<<.y %.rt

,

OFFICIAL RECORD COPY

- _.

- -_

-

--

..

. - - .

-

_ _ _

.

- .

. - .

--

_

_ _ -

-