Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-81-079, Provides Resolution of Potential Open Items Re Cladding Collapse & Supplemental ECCS Calculations for Ser.Applicant Will Verify That Cladding Collapse Will Not Result During Design Lifetime of C-E Fuel + (16:46:15, 20 December 2024)
- 05000206/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Also Submitted + (16:46:17, 20 December 2024)
- ML20032C314 + (16:46:19, 20 December 2024)
- ML20032C313 + (16:46:20, 20 December 2024)
- ML20032C312 + (16:46:21, 20 December 2024)
- ML20032C311 + (16:46:22, 20 December 2024)
- ML20032C310 + (16:46:23, 20 December 2024)
- ML20032C309 + (16:46:25, 20 December 2024)
- 1CAN108109, Notifies That Util No Longer Plans to Proceed W/Small Break LOCA Program Per But Will Participate W/Other BWR Owners in Program to Upgrade Computer Models Used in Small Break LOCA + (16:46:27, 20 December 2024)
- ML20032C305 + (16:46:29, 20 December 2024)
- ML20032C304 + (16:46:30, 20 December 2024)
- ML20032C303 + (16:46:31, 20 December 2024)
- 05000312/LER-1981-043, Ro:On 810916,during Surveillance through-path Found on Floor Penetration.Repair Should Entail Use of Silicon Foam or Grout & Will Be Made in Group Repair W/Other Similar Occurrence Noted in LER 81-43 + (16:46:33, 20 December 2024)
- 2CAN108112, Discusses Interim Action to Reduce Consequences of Inadvertent Boron Dilution Event Re Review of Amend 24 to NPF-6,in Response to 810619 Request + (16:46:35, 20 December 2024)
- ML20032C299 + (16:46:37, 20 December 2024)
- ML20032C298 + (16:46:38, 20 December 2024)
- FVY-81-153, Advises of Delay in Submittal of Proposed Augmented Inservice Insp Program.Rept Will Be Submitted by Mar 1982 + (16:46:39, 20 December 2024)
- ML20032C296 + (16:46:41, 20 December 2024)
- ML20032C295 + (16:46:42, 20 December 2024)
- ML20032C294 + (16:46:43, 20 December 2024)
- ML20032C293 + (16:46:44, 20 December 2024)
- ML20032C292 + (16:46:45, 20 December 2024)
- 05000315/LER-1981-048-03, /03L-0:on 810929,during Surveillance Testing,Rhr Motor Operated Containment Isolation Valve ICM-111 Failed to Open from Control Room.Caused by Bypass Limit Switch Contacts Opening Prior to Valve Being Completely Unseated + (16:46:47, 20 December 2024)
- 05000267/LER-1981-061-03, /03L-0:on 811002,total Dissolved Solids in Nonradiological Liquid Plant Effluent Exceeded Tech Spec Limits on Five Separate Occasions.Caused by Sudden Increase in Ratio of Total Dissolved Solids to Conductivity + (16:46:49, 20 December 2024)
- ML20032C289 + (16:46:50, 20 December 2024)
- 05000315/LER-1981-048, Forwards LER 81-048/03L-0 + (16:46:52, 20 December 2024)
- ML20032C286 + (16:46:54, 20 December 2024)
- PNO-III-81-094, on 811103,unit Tripped from Full Power.Caused by Feedwater/Steam Flow Mismatch Due to Lube Oil Loss to One of Two Main Feedwater Pumps During Strainer Shifting.Repair Will Require Plant at Half Loop Status + (16:46:55, 20 December 2024)
- ML20032C284 + (16:46:57, 20 December 2024)
- ML20032C283 + (16:46:58, 20 December 2024)
- 05000267/LER-1981-061, Forwards LER 81-061/03L-0.Detailed Event Analysis Encl + (16:46:59, 20 December 2024)
- ML20032C280 + (16:47:01, 20 December 2024)
- ML20032C279 + (16:47:02, 20 December 2024)
- PNO-V-81-061, on 811102,15,000 Gallons of Borated Water Transferred from Refueling Water Storage Tanks to Condenser Hotwell.Caused by Failure of Valve to Close in three-inch Recirculation Line from Pump to Hotwell.Investigating Valve + (16:47:04, 20 December 2024)
- ML20032C277 + (16:47:05, 20 December 2024)
- ML20032C276 + (16:47:07, 20 December 2024)
- ML20032C275 + (16:47:08, 20 December 2024)
- ML20032C272 + (16:47:11, 20 December 2024)
- ML20032C271 + (16:47:12, 20 December 2024)
- ML20032C268 + (16:47:15, 20 December 2024)
- ML20032C267 + (16:47:16, 20 December 2024)
- 05000346/LER-1981-060-01, /01T-0:on 811016,during Evaluation of Calibr on Hot Leg Temp Input to Reactor Protection Sys,Channels 2 & 4 Pressure/Temp Trip Setpoints Were Found Less Conservative than Tech Spec When Combined W/Max Postulated Inaccuracies + (16:47:18, 20 December 2024)
- ML20032C265 + (16:47:20, 20 December 2024)
- ML20032C264 + (16:47:21, 20 December 2024)
- IR 05000298/1981016 + (16:47:23, 20 December 2024)
- 05000346/LER-1981-060, Forwards LER 81-060/01T-0 + (16:47:25, 20 December 2024)
- ML20032C260 + (16:47:26, 20 December 2024)
- ML20032C259 + (16:47:28, 20 December 2024)
- 05000331/LER-1981-037-01, /01T-0:on 811017,during Valve Lineup Check,Main Steam Line Leakage Control Sys D Manual Valve V-84-16 Was Found Closed.Caused by Valving Error Due to Poor Lighting & Accessibility & Lack of Valve Labels.Lineup Performed + (16:47:29, 20 December 2024)
- ML20032C257 + (16:47:31, 20 December 2024)
- ML20032C256 + (16:47:32, 20 December 2024)