Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033B633 + (15:13:37, 20 December 2024)
- ML20033B632 + (15:13:38, 20 December 2024)
- ML20033B630 + (15:13:39, 20 December 2024)
- ML20033B629 + (15:13:41, 20 December 2024)
- ML20033B627 + (15:13:42, 20 December 2024)
- 05000272/LER-1981-102, Forwards LER 81-102/03L-0.Detailed Event Analysis Encl + (15:13:43, 20 December 2024)
- ML20033B624 + (15:13:45, 20 December 2024)
- ML20033B623 + (15:13:46, 20 December 2024)
- 05000272/LER-1981-104-03, /03L-0:on 811026,steam Generator 13 Steam Flow Channel 1 Discovered Indicating High.Caused by Transmitter Being Out of Calibr.Transmitter Recalibr + (15:13:48, 20 December 2024)
- ML20033B621 + (15:13:49, 20 December 2024)
- IR 05000277/1981012 + (15:13:50, 20 December 2024)
- ML20033B618 + (15:13:52, 20 December 2024)
- 05000272/LER-1981-104, Forwards LER 81-104/03L-0.Detailed Event Analysis Encl + (15:13:54, 20 December 2024)
- ML20033B614 + (15:13:56, 20 December 2024)
- 05000272/LER-1981-097-01, /01T-0:on 811106,boron Injection Tank Inlet Valves 1SJ4 & 1SJ5 Failed to Open Fully.Caused by Boron Buildup Around Stem.Boron Removed & Torque Settings Increased + (15:14:02, 20 December 2024)
- A01925, Responds to IE Bulletin 81-02,Suppl 1 Re Failure of Valves to Close Against Differential Pressure.Four Westinghouse Electro-Mechanical Div-mfg Motor Operated Gate Valves Found in safety-related Sys.Approx 60 Manhours Expended + (15:14:04, 20 December 2024)
- ML20033B609 + (15:14:06, 20 December 2024)
- ML20033B608 + (15:14:07, 20 December 2024)
- ML20033B605 + (15:14:11, 20 December 2024)
- 05000311/LER-1981-111-03, /03L-0:on 811022,during Boration Process, Pressurizer Pressure Dropped Below DNB Parameter for 5 Minutes.Caused by Injection of Excessive Amount of Boron in Rcs.Personnel Counseled Re Correct Procedure + (15:14:13, 20 December 2024)
- ML20033B603 + (15:14:15, 20 December 2024)
- 05000272/LER-1981-096-01, /01T-0:on 811107,during Insp,Svc Water Discovered Leaking from Containment Fan Coil Units 11 & 15.Cause Not Stated.Leak on Unit 15 Repaired W/Belzona Metal Filler. Coil on Unit 11 Isolated by Installing Blank Flange Insert + (15:14:17, 20 December 2024)
- ML20033B600 + (15:14:29, 20 December 2024)
- IR 05000334/1981020 + (15:14:31, 20 December 2024)
- 05000311/LER-1981-111, Forwards LER 81-111/03L-0.Detailed Event Analysis Encl + (15:14:33, 20 December 2024)
- 05000272/LER-1981-096, Forwards LER 81-096/01T-0.Detailed Event Analysis Encl + (15:14:35, 20 December 2024)
- ML20033B593 + (15:14:37, 20 December 2024)
- ML20033B592 + (15:14:39, 20 December 2024)
- ML20033B590 + (15:14:40, 20 December 2024)
- JAFP-81-1270, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/81-21.Corrective Actions:Monitoring of Diesel Generator Door Monitoring Sys Completed on 811022 + (15:14:41, 20 December 2024)
- 05000220/LER-1981-048-03, /03L-0:on 811019,during Normal Operation,Liquid Poison Pump 11 Was Removed from Svc.Prior to Removal,Pump 12 Was Run to Prove Operability.Pump Removed for Scheduled Maint of Packing + (15:14:44, 20 December 2024)
- 05000245/LER-1981-029-03, /03L-1:on 810908,while Performing Reactor low-low Water Level Functional & Calibr Test,Switch 263-73B Found Sticking.Cause Unknown.Switch Cycled & Recalibr + (15:14:46, 20 December 2024)
- 05000311/LER-1981-110-03, /03L-0:on 811026,while Attempting to Place Containment Fan Coil Units 21 & 23 in Low Speed Accident Mode,Units Declared Inoperable Due to Low Flow Indication. Caused by Silt in Transmitter Sensing Lines + (15:14:48, 20 December 2024)
- 05000220/LER-1981-048, Forwards LER 81-048/03L-0 + (15:14:51, 20 December 2024)
- 05000245/LER-1981-029, Forwards LER 81-029/03L-1.Detailed Event Analysis Encl + (15:14:53, 20 December 2024)
- IR 05000333/1981021 + (15:14:55, 20 December 2024)
- 05000311/LER-1981-110, Forwards LER 81-110/03L-0.Detailed Event Analysis Encl + (15:14:57, 20 December 2024)
- 05000334/LER-1981-093-03, /03L-0:on 811017,during Battery 1 Quarterly Surveillance Test,Cells 6 & 55 Indicated Voltage Decreased Below Level Allowed by Tech Specs.Engineering re-evaluation Requested.Cells Replaced + (15:15:00, 20 December 2024)
- 05000272/LER-1981-101-03, /03L-0:on 811021,while Cycling Pressurizer Auxiliary Spray Line Isolation Valve 1CV75 During Surveillance,Pressure in Pressurizer Dropped Below 2205 Psia.Caused by Incorrect Valve Liftoff Pressure Setting + (15:15:02, 20 December 2024)
- ML20033B572 + (15:15:04, 20 December 2024)
- 05000272/LER-1981-099-03, /03L-0:on 811022,containment Fan Coil Unit 12 Was Indicating Low Flow in Low Speed Mode.Caused by Flow Transmitter Plugged W/Silt.Transmitter Blown Down & Tested Satisfactorily + (15:15:05, 20 December 2024)
- 05000272/LER-1981-101, Forwards LER 81-101/03L-0.Detailed Event Analysis Encl + (15:15:08, 20 December 2024)
- 05000334/LER-1981-093, Forwards LER 81-093/03L-0 + (15:15:10, 20 December 2024)
- ML20033B564 + (15:15:12, 20 December 2024)
- IR 05000267/1981023 + (15:15:13, 20 December 2024)
- ML20033B559 + (15:15:15, 20 December 2024)
- 05000272/LER-1981-099, Forwards LER 81-099/03L-0.Detailed Event Analysis Encl + (15:15:16, 20 December 2024)
- ML20033B556 + (15:15:17, 20 December 2024)
- ML20033B555 + (15:15:19, 20 December 2024)
- ML20033B554 + (15:15:20, 20 December 2024)
- ML20033B553 + (15:15:21, 20 December 2024)