Responds to NRC Re Violations Noted in IE Insp Rept 50-358/81-21.Corrective Actions:Weld WR-4 Replaced;Weld CY-606 Uncovered,Drained & Radiographed Using Properly Spaced & Shimmed Penetrameters
ML20033B621
Person / Time
Site: Zimmer
Issue date: 11/04/1981
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20033B613 List:
References
QA-1531, NUDOCS 8112010581
Download: ML20033B621 (2)


Text

U I

m_ _

THE CINCINNATI GAS & ELECTRIC COMPANY seg CINCINN ATLOHIO 45201 November 4, 1981 QA-1531 E. A. BoRGMAN N SENIO# vsCE PRESIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn Illinois 60137 Attention:

Mr. J. G. Keppler, Director RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 - IE INSPECTION REPORT NO. 81-21, DOCKET NO. 50-358, CONSTRUCTION PERMIT CPPR-88, W.O. 57300-957, JOB E-5590 Gentlemen:

This letter constitutes our follow-up response to the item of non-com-pliance indicated in the above referenced inspection report. It is our opinion that nothing in the report or in this response is proprietary in nature.

In regard to the items of non-compliance listed in appendix A, notice of violation, our response is as follows:

"... Shim thickness was not selected so the total thickness being radiographed under the penetrameter was the same as the weld thick -

ness.

In addition, when the source was placed on the axis of the object being radiographed with a single exposure, there was not at least three uniformly spaced penetrameters.

(A) Corrective Action Taken and Results Achieved.

The two welds involved in this inspection report were CY-606 and WR-4.

Weld WR-4 was cut from the line and replaced with weld K-2031 in accor-dance with Engineering Change Request (ECR) Number 1149 as reported to you in our interim response dated September 25, 1981. We therefore consider weld WR-4 to be properly dispositioned and removed from further consideration.

The line containing weld CY-606 was uncovered, drained and weld CY-606 was re-radiographed using properly spaced and properly shimmed penetrameters.

8112010581 811104 PDR ADOCK 05000358 G

PDR HOV 66

3 Mr. J. G. Ksppler. Director J

U. S. N'aclear-Regulatory. Commission Region III November 4, 1981 Page #2 Inview of the above actions, CCic sons 5ders these non-compliances to be properly dispositioned.

(B) Corrective Actior Taken To Avoid Further Non-conpliancc..

All field radiographers have beer.Onstructed in the proper place-ment and proper shimming of penetraraat ars.

(C) Date When full Compliance will_be Achieved.

CC&E considers that in view of O'e 3bove actions full compliance has been achieved as of this date.

Very truly yours.

THE CINCINNATI GAS & ELECTRIC COMPANY

^

By E. A. Borgmann SENIOR VICE PRESIDENT JRV/bjs cc: NRC Resident Inspector Attn:

W. F. Christianson i

State of Ohio

)

l County of Hamilton)

Sworn to and subscribed before me this h

day of Movember, 1981 l

d 5 b%44/n Notafy'Public V

l VIRGINIA P. MUHLHOFER Notary Public. State Of Ohio My Commission Dpires July 28,1932 l