- ML20245D977 + (07:48:45, 2 December 2024)
- ML20245D979 + (07:48:45, 2 December 2024)
- ML20245D975 + (07:48:46, 2 December 2024)
- ML20245D971 + (07:48:47, 2 December 2024)
- B12949, Provides Revised Schedule for Completion of Fire Barrier Penetration Seal Program for Millstone Unit 1,description of Scope of Fire Barrier Penetration Seals Program at Plant & Schedule for Implementation of Program.Fee Paid + (07:48:48, 2 December 2024)
- ML20245D970 + (07:48:48, 2 December 2024)
- ML20245D968 + (07:48:49, 2 December 2024)
- IR 05000295/1989016 + (07:48:50, 2 December 2024)
- ML20245D962 + (07:48:51, 2 December 2024)
- ML20245D961 + (07:48:52, 2 December 2024)
- ML20245D960 + (07:48:52, 2 December 2024)
- ML20245D956 + (07:48:53, 2 December 2024)
- ML20245D959 + (07:48:53, 2 December 2024)
- SNRC-1608, Forwards QC 1989 Staffing Rept, Per Contention 13(d) Settlement Agreement.Manpower Projections Noted in Rept Support Plant Operation Under Current Full Power License + (07:48:54, 2 December 2024)
- ML20245D954 + (07:48:55, 2 December 2024)
- 05000482/LER-1989-008, :on 890329,discovered That Surveillance Procedure Not Performed on 890308,following 1h 21 Minute Run of Emergency Diesel Generator.Caused by Personnel Error. Procedure Will Be Revised by 890522 + (07:48:57, 2 December 2024)
- 05000366/LER-1988-022-02, :on 880902,during HPCI Testing,Turbine Tripped & Inboard Steam Supply Isolation Valve Closed.Caused by Magnetic Speed Pickup Cable (SPC) Physical Configuration.Spc Repaired & SPC Protection Mechanism Developed + (07:48:59, 2 December 2024)
- ML20245D950 + (07:49:00, 2 December 2024)
- 05000285/LER-1988-021, :on 880902,determined That Control Room Panels W/O Smoke Detectors.Maint Order 88393 Issued to Install Smoke Detectors in Panels + (07:49:01, 2 December 2024)
- IR 05000275/1989012 + (07:49:03, 2 December 2024)
- ML20245D947 + (07:49:03, 2 December 2024)
- ML20245D945 + (07:49:05, 2 December 2024)
- ML20245D944 + (07:49:06, 2 December 2024)
- ML20245D943 + (07:49:06, 2 December 2024)
- ML20245D940 + (07:49:25, 2 December 2024)
- ML20245D938 + (07:49:26, 2 December 2024)
- 05000259/LER-1988-023-02, :on 880818,observed Groundwater Entering RHR Svc Pump Room Through Pipe Penetration.Caused by Inadequate Water Seal Design of Piping Penetration.Water Tight Seal Being Designed & Will Be Installed.W/Undated Ltr + (07:49:34, 2 December 2024)
- ML20245D932 + (07:49:36, 2 December 2024)
- ML20245D931 + (07:49:36, 2 December 2024)
- ML20245D930 + (07:49:37, 2 December 2024)
- ML20245D928 + (07:49:38, 2 December 2024)
- ML20245D929 + (07:49:38, 2 December 2024)
- IR 05000445/1988056 + (07:49:52, 2 December 2024)
- ML20245D924 + (07:49:52, 2 December 2024)
- ML20245D920 + (07:49:53, 2 December 2024)
- ML20245D919 + (07:49:54, 2 December 2024)
- ML20245D918 + (07:49:54, 2 December 2024)
- ML20245D916 + (07:49:56, 2 December 2024)
- ML20245D912 + (07:49:57, 2 December 2024)
- 05000412/LER-1989-017, :on 890517,abnormal Reactor Vessel Level Indication Sys Indications Experienced on wide-range Channels.Caused by Inadequate Procedures,Unit Differences & Personnel Error.Qc Coverage Increased + (07:49:58, 2 December 2024)
- ML20245D910 + (07:49:59, 2 December 2024)
- ML20245D909 + (07:50:00, 2 December 2024)
- 05000280/LER-1988-030, :on 880517,operator Reported That Water Was Flowing Into Loop C Room from Penetration of Reactor Coolant Loop Through Shield Wall.Cause Unknown.Backup Nitrogen Supply Restored to Inflatable Seal + (07:50:02, 2 December 2024)
- ML20245D906 + (07:50:03, 2 December 2024)
- ML20245D902 + (07:50:04, 2 December 2024)
- ML20245D901 + (07:50:04, 2 December 2024)
- ML20245D898 + (07:50:05, 2 December 2024)
- ML20245D900 + (07:50:05, 2 December 2024)
- ML20245D894 + (07:50:06, 2 December 2024)
- 05000266/LER-1989-001-01, :on 890322,emergency Diesel Generator & Both Trains of Containment Spray Sys Inoperable During Power Operation of Both Reactors.Caused by Personnel Error. Containment Spray Sys Restored to Operation + (07:50:18, 2 December 2024)