ML20245D940
| ML20245D940 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 09/29/1988 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Fitzpatrick E GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20245D941 | List: |
| References | |
| EA-88-243, NUDOCS 8810070317 | |
| Download: ML20245D940 (2) | |
See also: IR 05000219/1988023
Text
_-
. _ _ - _
'
-
".;
,
Sb#
L(
Docket / License: 50-219/50-DPR-16
L
- GPU Nuclear Corporation.
' ~
ATTN:. Mr. Eugene E. Fitzpatrick
Vice President and Director.
Oyster Creek Nuclear' Generating Station
P.O. Box 388
Forked River, New Jersey'
08731
' Gentlemen:
Subject:
Inspection Report No. 50-219/88-23
'This. refers to.the routine safety inspection conducted by Messrs. W. Baunack,
'
E. ' Collins,. D. Lew, 'and J. Wechselberger, July 31 to September 10, 1988, at_the
.0yster Creek Nuclear Generating Station.
The inspection consisted of document re-
views, interviews and observations of activities as documented in the enclosed in-
spection report. The findings were discussed with you and other members'of your
staff at the conclusion of the inspection.
Duringlthis period,' a special inspection was conducted to review the events re-
ported by you on September 2,1988 concerning the operation of the plant with the
"A" isolation condenser vent line isolated.
This event is considered significant in that the isolated vent path on the "A"
.-(
isolation condenser steam line prevented the necessary purging of noncondensible
gases from this line and had the potential to make the isolation condenser,inoper-
able. This condition apparently existed since a plant startup on August 10, 1988,
and continued until corrected on September 2, 1988.
In addition to this unknown
system status, the "B" isolation condenser was made inoperable, for maintenance
purposes, during August 23-28, 1988 and August 29 - September 2, 1988. Both iso-
lation condensers were apparently inoperable for a period of approximately 10' days.
This condition violated operability requirements for the isolation condenser as
specified .in the Technical Specifications and is considered to be a serious safety
matter in that en entire safety system was potentially inoperable for'an extended
period of time.
We would like to discuss this event with you in an enforcement conference in Region
I during the week of October 10, 1988.
In preparing for this conference, you
should be prepared to discuss the event, its root causes, safety significance, and
your sort, and long term corrective actions.
!
I
f
OFFICIAL RECORD C0pY
DL50-219/88-23 - 0001.0.0
'
09/21/88
I
8910070317 800929
,
A.
ADOCK0500pg9
_@
DR
~wa av
_ _ . _ _ _
_ _ _ _ _ _ _ . _ _ _
_ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ .
___________._________________._.__________________..____._________________.______m
, _ - _ _ _ _ _ _ ___ _ - _ _____-__- _-
- - _ - _ _ _ _ .
t
.
~GPU Nuclear' Corporation
2
SEP 191988
-
.
.
.
I
]
.-Your cooperation with us in these matters is appreciated.
Sincerely,
W INN, W Y
William F. Kane, Director
Division of Reactor Projects
Enclosure: NRC Region I Report No. 50-219/88-23
cc w/ encl:
BWR Licensing Manager
Licensing Manager, 0yster Creek
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
.
bec w/ encl:
'
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
DRP Section Chief
DRS. Director
DRSS Director
L. Chandler, OGC
D. Crutchfield, NRR
J. Lieberman, ED0/0E
D. Holody, RI
RI:D P (
RI:DR
RI:DRP
Wechsed
er/meo
Co ill
Bett nha
n
9/22/88
if g (
yf f(
}
OFFICIAL RECORD COPY
DL50-219/88-23 - 0002.0.0
09/21/88
r
_ _ _ . _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _