Forwards Safety Insp Rept 50-219/88-23 on 880731-0910. Enforcement Conference Requested for Wk of 881010
ML20245D940
Person / Time
Site: Oyster Creek
Issue date: 09/29/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20245D941 List:
References
EA-88-243, NUDOCS 8810070317
Download: ML20245D940 (2)


See also: IR 05000219/1988023

Text

_-

. _ _ - _

'

-

".;

,

Sb#

L(

Docket / License: 50-219/50-DPR-16

EA-88-243

L

GPU Nuclear Corporation.

' ~

ATTN:. Mr. Eugene E. Fitzpatrick

Vice President and Director.

Oyster Creek Nuclear' Generating Station

P.O. Box 388

Forked River, New Jersey'

08731

' Gentlemen:

Subject:

Inspection Report No. 50-219/88-23

'This. refers to.the routine safety inspection conducted by Messrs. W. Baunack,

'

E. ' Collins,. D. Lew, 'and J. Wechselberger, July 31 to September 10, 1988, at_the

.0yster Creek Nuclear Generating Station.

The inspection consisted of document re-

views, interviews and observations of activities as documented in the enclosed in-

spection report. The findings were discussed with you and other members'of your

staff at the conclusion of the inspection.

Duringlthis period,' a special inspection was conducted to review the events re-

ported by you on September 2,1988 concerning the operation of the plant with the

"A" isolation condenser vent line isolated.

This event is considered significant in that the isolated vent path on the "A"

.-(

isolation condenser steam line prevented the necessary purging of noncondensible

gases from this line and had the potential to make the isolation condenser,inoper-

able. This condition apparently existed since a plant startup on August 10, 1988,

and continued until corrected on September 2, 1988.

In addition to this unknown

system status, the "B" isolation condenser was made inoperable, for maintenance

purposes, during August 23-28, 1988 and August 29 - September 2, 1988. Both iso-

lation condensers were apparently inoperable for a period of approximately 10' days.

This condition violated operability requirements for the isolation condenser as

specified .in the Technical Specifications and is considered to be a serious safety

matter in that en entire safety system was potentially inoperable for'an extended

period of time.

We would like to discuss this event with you in an enforcement conference in Region

I during the week of October 10, 1988.

In preparing for this conference, you

should be prepared to discuss the event, its root causes, safety significance, and

your sort, and long term corrective actions.

!

I

f

OFFICIAL RECORD C0pY

DL50-219/88-23 - 0001.0.0

'

09/21/88

I

8910070317 800929

,

A.

ADOCK0500pg9

_@

DR

~wa av

_ _ . _ _ _

_ _ _ _ _ _ _ . _ _ _

_ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ .

___________._________________._.__________________..____._________________.______m

, _ - _ _ _ _ _ _ ___ _ - _ _____-__- _-

- - _ - _ _ _ _ .

t

.

~GPU Nuclear' Corporation

2

SEP 191988

-

.

.

.

I

]

.-Your cooperation with us in these matters is appreciated.

Sincerely,

W INN, W Y

William F. Kane, Director

Division of Reactor Projects

Enclosure: NRC Region I Report No. 50-219/88-23

cc w/ encl:

BWR Licensing Manager

Licensing Manager, 0yster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

.

bec w/ encl:

'

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

DRP Section Chief

DRS. Director

DRSS Director

L. Chandler, OGC

D. Crutchfield, NRR

J. Lieberman, ED0/0E

D. Holody, RI

RI:D P (

RI:DR

RI:DRP

Wechsed

er/meo

Co ill

Bett nha

n

9/22/88

if g (

yf f(

}

OFFICIAL RECORD COPY

DL50-219/88-23 - 0002.0.0

09/21/88

r

_ _ _ . _ . _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _

__