Arizona Nuclear Power Project P O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 i
~
102-00955-DBK/TDS/SK September 26, 1988
. -;~
U. S. Nuclear Regulatory Commission S T NRC Document Control Desk
)
Washington, D.C.
20555
Reference:
(1)
Letter from D. F. Kirsch (NRC) to E. E. Van Brunt, Jrc-(ANPP), dated July 24, 1987.
NRC Inspection Reports 50-528/87.-17, 50-529/87-18, and 50-530/87-19 (2) Response to Notice of Deviation:
50-530/87-19-01, i
102-00471-EEVB/TDS dated August 21, 1987
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 (License No. NPF-74)
Supplement to Notice of Deviation:
50-530/87-19-01 File: 88-070-026 This ' letter is provided to correct a typographical error made in reference (2), on page 8, which states:
"A preventive maintenance task has been initiated which will test and verify continued operability of this system on a biannual basis." The word " biannual" should have been " biennial" (every two years).
To verify whether the error in the original statement was typogr:phical, an Engineering Evaluation was performed.
The results of the evaluation support the performance of calibration every two years (biennial).
If you have any questinns, please contact Mr. Timothy Shriver of my staff :t (602) 393-2521.
Very truly your,
DonaldS. Kggner ExecutTve V4ce President Projec{Dirgtor.;
E3 DBK/TDS/SK/kj m
cc:
J. G. Haynes a
t J. B. Martin f4 T. J. Polich
[)j M. J. Davis
/ m
-A. C. Gehr U
~
gatectosPg 9t *94 6'
L rap. neeen oseeeno l.
.4 PMo G
.