Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20246L705 + (03:31:44, 2 December 2024)
- ML20246L707 + (03:31:44, 2 December 2024)
- 05000293/LER-1989-020, :on 890614,unplanned Reactor Protection Sys Scram Signal Occurred During Shutdown.Caused by Operator Error.Responsible Operator Verbally Reprimanded for Failing to Follow Approved Procedure + (03:31:46, 2 December 2024)
- ML20246L703 + (03:31:51, 2 December 2024)
- RBG-31440, Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1989 & Rev 3 to ODCM + (03:31:51, 2 December 2024)
- 05000458/LER-1989-029, :on 890613,unplanned ESF Actuation Occurred as Result of Technicians Shorting Two Leads Together While Installing Spare Transformer.Caused by Personnel Error. Communications Improved + (03:31:54, 2 December 2024)
- ML20246L699 + (03:31:55, 2 December 2024)
- TXX-8960, Provides Advance Change to Be Included in Future FSAR Amend Re Diesel Generator Fuel Oil Strainers.Change Takes Exception to Reg Guide 1.137 + (03:31:56, 2 December 2024)
- ML20246L691 + (03:31:57, 2 December 2024)
- PNO-I-89-023, on 890316,two Researchers Detected P-32 Contamination on Shoes While Conducting end-of-day Survey at Albert Einstein College of Medicine.Spill Considered Minor & Confined to Lab.Lab Being Cleaned Up + (03:31:57, 2 December 2024)
- ELV-00340, Forwards Revised Monthly Operating Rept for Jan 1989 & Monthly Operating Rept for Feb 1989 for Vogtle,Units 1 & 2 + (03:31:58, 2 December 2024)
- ML20246L684 + (03:31:59, 2 December 2024)
- ML20246L683 + (03:32:10, 2 December 2024)
- IR 05000454/1989014 + (03:32:22, 2 December 2024)
- ML20246L680 + (03:32:23, 2 December 2024)
- ML20246L679 + (03:32:24, 2 December 2024)
- IR 05000333/1989017 + (03:32:26, 2 December 2024)
- ML20246L675 + (03:32:26, 2 December 2024)
- ML20246L673 + (03:32:27, 2 December 2024)
- ML20246L672 + (03:32:28, 2 December 2024)
- ML20246L671 + (03:32:29, 2 December 2024)
- ML20246L666 + (03:32:30, 2 December 2024)
- ML20246L662 + (03:32:31, 2 December 2024)
- ML20246L661 + (03:32:32, 2 December 2024)
- ML20246L658 + (03:32:33, 2 December 2024)
- ML20246L659 + (03:32:33, 2 December 2024)
- ML20246L655 + (03:32:34, 2 December 2024)
- ML20246L657 + (03:32:34, 2 December 2024)
- ML20246L653 + (03:32:35, 2 December 2024)
- ML20246L654 + (03:32:35, 2 December 2024)
- ML20246L651 + (03:32:36, 2 December 2024)
- ML20246L648 + (03:32:37, 2 December 2024)
- ML20246L649 + (03:32:37, 2 December 2024)
- ML20246L646 + (03:32:38, 2 December 2024)
- ML20246L642 + (03:32:45, 2 December 2024)
- IR 05000029/1989011 + (03:32:45, 2 December 2024)
- ML20246L639 + (03:32:46, 2 December 2024)
- ML20246L637 + (03:32:47, 2 December 2024)
- ML20246L636 + (03:32:47, 2 December 2024)
- ML20246L634 + (03:32:49, 2 December 2024)
- 05000293/LER-1989-019, :on 890609,RCIC Sys Made Inoperable Per Tech Specs Due to Inoperable Area Temp Switch.Caused by 890514 Surveillance Procedure Signed as Completed W/Unsatisfactory Results.Terminal Block Replaced + (03:32:52, 2 December 2024)
- ML20246L630 + (03:32:53, 2 December 2024)
- ML20246L628 + (03:32:54, 2 December 2024)
- ML20246L629 + (03:32:54, 2 December 2024)
- ML20246L626 + (03:32:55, 2 December 2024)
- BECO-89-100, Submits Revised Plant Power Ascension Program as Previously Submitted by Util .Phase One Demonstration Proved Ability of Personnel,Procedure & Equipment to Accomplish Reactor Shutdown & Controlled Cooldown Outside Control Room + (03:32:57, 2 December 2024)
- ML20246L620 + (03:32:57, 2 December 2024)
- ML20246L617 + (03:32:58, 2 December 2024)
- ML20246L616 + (03:32:59, 2 December 2024)
- ML20246L612 + (03:33:00, 2 December 2024)
- ML20246L611 + (03:33:01, 2 December 2024)
- ML20246L610 + (03:33:02, 2 December 2024)