PLANT V0GTLE - UNIT 1 NRC DOCKET,50-424 OPERATING LICENSE NPF-68 MONTHLY OPERATING REPORT FOR FEBRUARY, 1989 TABLE OF CONTENTS j
i NARRATIVE REPORT Page E2-1 OPERATING DATA REPORT Page E2-2 AVERAGE DAILY POWER LEVEL Page E2-3 UNIT. SHUTDOWNS AND POWER REDUCTIONS Page E2-4 1
I l
I i
l l-8903240251 890315 El 4y4 ADOCK O gDR
NARRATIVE REPORT.
DOCKET NO.
50-424 UNIT 1 DATE:
MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE:
(404) 724-8114 x3212 FEBRUARY 1 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
FEBRUARY 10 00:53 REACTOR MANUALLY TRIPPED, ENTER MODE 3.
FEBRUARY 11 02:22 UNIT 1 ENTERS MODE 2.
FEBRUARY 11 05:10 REACTOR BECAME CRITICAL.
FEBRUARY 12 01:44 UNIT 1. ENTERS MODE 1.
FEBRUARY 12 11:36 UNIT 1 TIED TO GRID.
FEBRUARY 20 18:00 UNIT 1 AT 100% POWER.
FEBRUARY 28 11:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
l l
E2-1 l
l i
?
~.
s OPERATING DATA REPORT DOCKET NO. 50-424 DATE: MAR 5 1989 COMPLETEDBY!R.A.M0YE TELEPHONE: (404) 724-8114 x3212 l
OPERATING STATUS
- 1. UNIT NAME:
A. W. V0GTLE UNIT 1 l
- 2. REPORT PERIOD:
MAR 89 3
- 3. LICENSED THERMAL POWER (MWt :
3411
- 4. NAMEPLATE RATING (GROSS MWe :
1148
- 5. DESIGN ELECTRICAL RATING (N T MWe):
1101 1
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1137
- 8. IF CHANGES OCCUR IN CAPACITY (NET MWe):
- 7. MAXIMUM DEPENDABLE CAPACITY 1083 RATINGS l
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A THIS HONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672 1416 15337
- 12. NUM8ER OF HOURS REACTOR WAS CRITICAL:
643.7 1200.1 12075.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
613.3 1153.8 11646.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED MWH):
1905573 3677476 38108631.9
- 17. GROSS ELEC. ENERGY GENERATED (M H):
635870 1223790 12613860
- 18. NET ELEC. ENERGY GENERATED (MWH :
600480 1152480 11864610
- 19. REACTOR SERVICE FACTOR 95.8%
84.8%
78.7%
- 20. REACTOR AVAILABILITY FACTOR 95.8%
84.8%
78.7%
- 21. UNIT SERVICE FACTOR:
91.3%
81.5%
75.9%
- 22. UNIT AVAILABILITY FACTOR:
91.3%
81.5%
75.9%
- 23. UNIT CAPACITY FACTOR USING MDC NET):
82.5%
75.2%
71.7%
- 24. UNIT CAPACITY FACTOR USING DER NET):
81.2%
73.9%
70.3%
- 25. UNIT FORCED OUTAGE RA E:
8.7%
17.5%
15.2%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
4
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):
N/A 1
i 1
E2-2
UNIT 1 AVERAGE DAILY DOCKET NO.
50-424 POWER LEVEL DATE:
MAR 5, 1989 COMPLETED BY: R. A. M0YE TELEPHONE:
(404) 724-8114 x3870 CAY Net MW 1.........
1097
- 2.........
1094
- 3.........
1089
- 4.........
1098
- 5.........
1102
- 6.........
1096
- 7.........
1099
- 8.........
1107
- 9.........
1110
- 10.........
0 11.........
0 12.........
-189 13.........
680 14.........
684 15.........
796 16.........
765 17.........
786 18.........
785 19.........
759 20.........
948 21.........
1090
- 22.........
1101
- 23.........
1105
- 24.........
1082
- 25.........
1125
- 26.........
1098
- 27.........
1093
- 28.........
1098 *
t ll UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-424 DATE:
MAR 5, 1989 UNIT NAME:
V0GTLE UNIT 1 COMPLETED BY: R. A. M0YE TELEPHONE:
(404) 724-8114 x3212 REPORT MONTH MAR 89 R
M 5
E E
Y l-T A
T LICENSEE SC i
Y S
H EVENT T0 COMPONENT CAUSE & CORRECTIVE P
DURATION 0
0 REPORT ED
-CODE ACTION TO NO.
DATE E
(HOURS)
N D
. NUMBER HE (SUBCODE)
PREVENT RECURRENCE L
89-Z 0Z-10 t
58.7Z A
2-89-005
- 5J~
P SEE BELOW 89-3 02-12 P
198.4 A
5 89-006 SJ P
SEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM 1 - MANUAL A GREATER THAN 20%
S: SCHEDULED B-MAINTENANCE OR TEST REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN) 89-2 CAUSE: HIGH VIBRATION TRIP OF MAIN FEEDWATER PUMP,"A", CAUSED A LOW LEVEL CONDITION IN STEAM GENERATOR #4.
CORRECTIVE ACTION:
MAIN FEEDWATER PUMP HAS BEEN DISASSEMBLED AND INSPECTED TO DETERMINE CAUSE OF HIGH VIBRATION. PUMP HAS BEEN REASSEMBLED AND TESTING HAS BEEN d
COMPLETED.
89-3 CAUSE:
POWER REDUCTION DUE TO MAIN FEEDWATER PUMP "A" TAKEN OUT OF SERVICE FOR INSPECTION AND TESTING.
CORRECTIVE ACTION:
POWER INCREASE AFTER MAIN FEEDWATER PUMP "A" INSPECTED AND TESTED.
1 i
l E2-4 l
ENCLOSURE 3 PLANT V0GTLE - UNIT 2 NRC DOCKET 50-425 OPERATING LICENSE NPF-79 MONTHLY OPERATING REPORT FOR FEBRUARY, 1989 TABLE OF CONTENTS NARRATIVE REPORT Page E3-1 OPERATING DATA REPORT Page E3-2 AVERAGE DAILY POWER LEVEL Page E3-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E3-4 l
l
{-
L l
~'
NARRATIVE REPORT DOCKET NO.
50-425 VNIT 2 DATE:
MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE:
(404) 724-8114 x3212 FEBRUARY 1 00:00 UNIT 2 PREPARING TO RECEIVE LOW POWER LICENSE.
FEBRUARY 9 UNIT 2 RECEIVED LOW POWER TESTING LICENSE NRC DOCKET # 50-425.
FEBRUARY 10 19:45 UNIT 2 COMfrNCED FUEL LOAD.
FEBRUARY 10 20:13 UNIT 2 ENTERED MODE 6.
FEBRUARY 16 03:47 UNIT 2 COMPLETED FUEL LOAD.
FEBRUARY 19 10:00 UNIT 2 ENTERED MODE 5.
FEBRUARY 28 23:59 UNIT 2 AT MODE 5 PREPARING FOR LOW POWER TESTING.
j
-l l
E3-1 i
i
---w- - - - - - - - _ _ - _ - - - - _ _ _ _ - - - - - _ - - - - - - - _ _
i OPERATING DATA REPORT DOCKET N0. 50-425 DATE: MAR 5, 1989 COMPLETED BY: R.A. M0YE TELEPHONE: (404) 724-8114 x3212 OPERATING STATUS
- 1. UNIT NAME:
A. W. V0GTLE UNIT 2
~2.
REPORT PERIOD:
FEB 89
- 3. LICENSED THERMAL POWER (MWt):
3411
- 4. NAMEPLATE RATING (GROSS MWe):
1148
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1101
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1137
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
~1083
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
5%
- 10. REASONS FOR RESTRICTION, IF ANY:
LOW POWER TESTING j
THIS MONTH YR. TO DATE-CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672 672 672.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
0.0 0.0 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
0.0 0.0 0.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
0 0
0
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
0 0
0
- 18. NET ELEC. ENERGY GENERATED (MWH):
0 0
0
- 19. REACTOR SERVICE FACTOR 0
0 0
- 20. REACTOR AVAILABILITY FACTOR 0
0 0
- 21. UNIT SERVICE FACTOR:
0.0%
0.0%
0.0%
- 22. UNIT AVAILABILITY FACTOR:
0.0%
0.0%
0.0%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
0.0%
0.0%
0.0%
- 24. UNIT CAPACITY FACTOR (USING DER NET):
0.0%
0.0%
0.0%
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
0.0%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1 1
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
JUNE 1989
- 28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):
1 E3-2
l UNIT 2 AVERAGE DAILY DOCKET N0.
50-425 POWER LEVEL DATE:
MAR 5, 1989 COMPLETED BY: R. A. Moye TELEPHONE:
(404) 724-8114 x3212 DAY Net MW 1.........
0 2.........
0 3.........
O l
l-4.........
0 5.........
0 6.........
0 7..........
0 8.........
0 9.........
0 10.........
0
'll.........
0 12.........
0 13........
0 14.........
0 15.........
0 16.........
0 17.........
0 18.........
0 19.........
0 l
20.........
O.
1 21.........
O i
22.........
O l
23.........
0 24.........
O l
25.........
0 26........
0 27.........
0 28.........
0 1
i ll l
E3-3 l
4 UNIT SHUTDOWNS A.ND POWER REDUCTIONS DOCKET N0.
50-425
'I l.
DATE:
MAR 5, 1989 l
UNIT NAME:
V0GTLE UNIT 2 COMPLETED BY: R. A. M0YE TELEPHONE:
(404) 724-8114 x3212
.i REPORT MONTH MAR 89
\\
R H
S E
E Y
T A
T LICENSEE SC Y
S H
EVENT T0 COMPONENT CAUSE.& CORRECTIVE P
DURATION 0
0 REPORT ED CODE ACTION TO N0.
DATE E
(HOURS)
N D
NUMBER HE (SUBCODE)
PREVENT RECURRENCE NONE F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUT0. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-0PERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN) l H-0THER (EXPLAIN) l E3-4 j
i
{
1
_