ML20246L654
| ML20246L654 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 06/30/1989 |
| From: | Bailey J, Mike Williams WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NO-89-0121, NO-89-121, NUDOCS 8907180488 | |
| Download: ML20246L654 (7) | |
Text
.
i
'I O--
p.f
,-H W$LF CREEK
^
NUCLEAR OPERATING CORPORATION John A. annoy s
v vie.n w.,e Nach J Operanons 1,
c 5
July l11,1989 NO 89-0121'
-U."S. Nuclear' Regulatory Commission ATTN: Document Control Desk 6
" Mail Station F1-137 cWashington, D. C.
20555
y e
Subject:
' i)ocket No. 50-482: June -1989, Monthly ~
Operating Report Gentlemen:-
l Attached is the June, 1989, Monthly ' Operating iteport for Wolf Creek' l
(Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
.Very truly yours, yoL C-l n
-John A. Bailey Vice President Nuclear Operations JAB /jad Attachment ces B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R.-D. Martin (NRC), w/a D. V. Pickett (NRC), w/a 8907180488 890630 PDR ADOCK 05000482
.I I
R PDC
/g
!l P.O. Box 411/ Burtirdon. KS 66839 / Phone: (316) 364-8831 I
An Equal opportunity Employ.r MfMCWET 2
'II'
,; e '
3:
b.
Attactiment.to. N0.89-0121 2
?
f NEE GI!EK NUC[ EAR OPERATIIG O2PGMTIN.
WXE CRl!EK GEN!!RATDG STATIN -
MNIfEE OPERATIIG REPTT 10NHI June YEAR: 1989 Docket No.: 50-482 Facility Operating Idoense No.: ICF-42 y
Report No.
52 1-l' Prepared by:
Merlin G. Williams i
{
L_. L_u
Attachinent to N0 89-0121 l
l p
SUMMARY
I j
The following report highlights the operating experience of Wolf Creek Generating Station for the nanth of June,1989. 'Ihis report is being I
provided pursuanc to Technical Specification 6.9.1.8.
I.
SUMMARY
OF OPERATIIG EXPERIDG On June 03, 1989, at 0904 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.43972e-4 months <br />, electz.ical generation was reduced 30 megawatts due to Heats Drain Pump "A" being renoved frmt service to balance the shaft. At 1151 hours0.0133 days <br />0.32 hours <br />0.0019 weeks <br />4.379555e-4 months <br /> the pump was returned to service.
On June 07,1989, at 0459 hours0.00531 days <br />0.128 hours <br />7.589286e-4 weeks <br />1.746495e-4 months <br />, Heate-Drain Pump "A" was removed from service to re M1ance the shaft. It was returned to service at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />.
Ch June 09,1989, at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />, the steam supply to High Pressure Heater "7A" was secured to repair a flow orifice flange I.eak. On June 11,1989, at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> the heater was returned to service.
On June 13,1989, at 2309 hours0.0267 days <br />0.641 hours <br />0.00382 weeks <br />8.785745e-4 months <br />, Circulating Water Pump "A" was secured to repair an oil leak. Power was limited to 90% by the setback circuit. 'Ihe setback circuit was temporarily disabled and power returned to 100% on June 14, 1989, at 1412 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.37266e-4 months <br />. On June 15, 1989, at 0444 hours0.00514 days <br />0.123 hours <br />7.34127e-4 weeks <br />1.68942e-4 months <br />, the punp was returned to service.
On June 16, 1989, at 0446 hours0.00516 days <br />0.124 hours <br />7.374339e-4 weeks <br />1.69703e-4 months <br />, Circulating Water Purtp "B" was secured to replace its cooling water outlet valve. At 1233 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.691565e-4 months <br /> the pump was returned to service. At 1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br />, the setback circuit was reinstated.
On June 25,1989, at 1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br />, reactor power was at 98% in order to install a nodificat.ian an the Balance of Plant camputer. On June 26, 1989, at 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br />, pomr was returned to 100%.
II. MAJOR SAFMY REEATED MAINTENAtG ACTIVITIES j
1.
Set limit switches for the Essential Service Water containment isolation valves EHW47, 48, 49, & 50 for flow adjustment.
1 2.
"A" and "B" train outages an the Control Bd1 ding air ccnditiordng units SGK04A and B and the Class 1E electrical equiprent air conditioning units S:iK05A and B which included replacing or plugging sme of the condenser tubes.
1 Wolf Creek Generating Station Manthly operating Report J
June 1989 Page 1 of 5 1
l
\\
-A,ttachment to NO 89-0121 OPERATDG DMA REPORT DOCKETF IG.
50-482 NOLF CREEK GENERATEG SIATICE WOLP CREEK NUCLEAR OPERATDG OCRPCRATICH DATE 07-01-89 COMPIEfED BY M. Williams TELEPIENE316-364-8831 OPERATI!G STA'IUS 1.
Reporting Period:
June, 1989 Gross Iburs in Reporting Period: 720 2.
Currently Authorized Power Invel(MNt): 3411 Max. Depend. Capacity (HWe-Net): 1135 Design Electrical Rating (MWe-Net):_1170 3.
Power level to which Restricted (If Any)(1%e-Nat):
N/A 4.
Reasons for restriction (If Any):
N/A
'Ihis Month Yr to Date Cumulative 5.
Number of Iburs Reactor was Critical 720.0 4,298.3 25,882.4 6.
Reactor Ret >erve Shutdown Hours 0.0 0.0 339.8 7.
11ours Generator on Line 720.0 4,203.4 25,370.9 Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Themal Energy Generated (IMI) 2,448,863 14,145,505 83,717,622 4
- 10. Gross Electrical Energy Generated (!MI) 845,634 4,929,814 29,099,019
- 11. Net Electrical Energy Generated (MHH) 812,302 4,734,047 27,747,153
- 12. Reactor Service Factor 100.0 99.0 77.2
- 13. Reactor Availability Factor 100.0 99.0 78.2
- 14. Unit Service Factor 100.0 96.8 75.7
- 15. Unit Availability Factor 100.0 96.8 75.7
- 16. Unit Capacity Factor (Using MDC) 99.4 96.0 73.3
- 17. Unit Capacity Factor (Using Design MNe) 96.4 93.2 70.7
- 18. Unit Forced Outage Rate 0.0 1.2 5.4-
- 19. Shutdowns Scheduled Over Next 6 Manths (Type, Date, and Duration of each): None.
- 20. If Shut Down at End of Report Period, Estimted Date of Startup:
N/A Wolf Creek Generating Station Monthly Operating Report June 1989 Page 2 of 5
! Attachment to NO 89-0121 AVEEUGE DAILY UNIT POWER LEVEL DOCKET NO.
50-482 NOLF CREEK GENERATING STATION HOLF CREEK NUCLEAR OPERATING OCRPTATION DATE 07-01-89 CON'EI'ED BY M. Williams TELEPIDE316-364-8831 30NIH June, 1989 DAY AVERPGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1136 17 1139 2
1135 18 1139 3'
1130 19 1139 4
1134 20 1135 5
1132 21 1133 6-1132 22 1135 7
1120 23 1134 8
1132 24 1132 9
1131 25 1122 10 1117 26 1121 11 1129-27 1128 12 1131 28 1127 13 1128 29 1127 14 1050 30 1127 15 1135 31 N/A 16 1137 1
I Wolf Creek Generating Station Monthly Operating Feport June 1989
)
Page 3 of 5
AGEY NNTH g
TRNTBE AAUT rn EEIA N MMAO ei KNTDDO nt CEA EH ea OGR TP Gr D E EE S
1234 e 5 KP LL T
eO9f E
MT E
e 8o RR O M
D r y9 CA C O
Cl14 l
E O
H h
FL C
T ftee LC
/
E lnng OU S
M ooua WN N
WMJP O
K I
)
E T
2 E
C
(
R A
C E
N F
V O
L I
I O
T T
W C
A E
N R
I R
M O
A C
X E.
S e
N n
E O
u S
I J
N
)
T E N C
f C
I U
o I
A D
L L E
h P
R t
D X n
N E R
o A
(
E m
W G R O
e N O
)
P 2
h I
R)
(
t NERN D
GRR IVEI N
NOE r
AI A
A ITW o
RTLL TCO f
TAAP N
TAP RNX W
UR 2
RTOE O
H*G 0
OSI(
D S
N 2
TIT T
EA ANAR U
SHC n
RIRE H
DTU a
EMEH S
O D
h PDPT HNE t
OAOO T
TWR I
EO r
N MDR e
U O
t EFGR ae N
r
)
O g
N S)
I A1 s
A E(
n L
R o
P N
i X
O t
E I
N) c (T
T OS u
S C
IR d
EE I
TU e
U T
RH LR S
U(
r IO E
1 2
D e
A R
w FE 1
9 o
C Y 0
8 D
p TNGR 9
E NANO 9
1 L
o ENIT 8
DU n
MELA EED PTEL 0
e PCE e
INUU N
n YRH r
UIFG u
TOC e
QAEE o
J FS w
EMRR t
e t
FS r
n e
ABCD e
H h
m T
T h
N e
N c
O t
O a
t M
a S
D Y
A tA T
R E
l R
A R
O M
P o
I E
N U
)
R S
1
(
I,
Atta brnent to N0 99-0121 WLF CREEK NUCLEAR OPERATDG CORPORATION WLF CREEK GENERATDG STATION INIT NO. 1 ATIH June, 1989
SUMMARY
OF OPERATDG EXPERIENCE Listed belcw in du.vuological sequence is o stmmary of coerating experiences for this month which required load reduction or resulted in significar non-load related incidents.
DATE TIME EVFNP June 03, 1989 0904 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.43972e-4 months <br /> Secured Heater Drain Pump "A" to balance shaft.
Electrical generation decreased 30 MWe.
1151 hours0.0133 days <br />0.32 hours <br />0.0019 weeks <br />4.379555e-4 months <br /> Heater Drain Pump "A" returned to service.
June 07, 1989 0459 hours0.00531 days <br />0.128 hours <br />7.589286e-4 weeks <br />1.746495e-4 months <br /> Secured Heater Drain Pump "A" to re-balance shaft.
Electrical generation decreased 30 MWe.
1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> Heater Drain Pump "A" returned to service.
Jtne 09,1989 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br /> Secured steam side of High Pressure Heater "7A" to repair flow orifice flange leak.
June 11, 1989 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> High Pressure Heater "7A" returned to service.
June 13, 1989 2309 hours0.0267 days <br />0.641 hours <br />0.00382 weeks <br />8.785745e-4 months <br /> Secured Circ Water Pump "A" to repair oil leak.
Limited to 90% power by setback circuit.
June 14, 1989 1412 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.37266e-4 months <br /> Setback circitit disabled. Power returned to 100%.
June 15, 1989 0444 hours0.00514 days <br />0.123 hours <br />7.34127e-4 weeks <br />1.68942e-4 months <br /> Circ Water Pump "A" returned to service.
June 16, 1989 0446 hours0.00516 days <br />0.124 hours <br />7.374339e-4 weeks <br />1.69703e-4 months <br /> Secured Circ Water Pump "B" to replace cooling water outlet valve.
1233 hours0.0143 days <br />0.343 hours <br />0.00204 weeks <br />4.691565e-4 months <br /> Circ mter Pump "B" returned to service.
1310 hours0.0152 days <br />0.364 hours <br />0.00217 weeks <br />4.98455e-4 months <br /> Set Nck circuit reinstated.
June 25, 1989 1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> Reactor at 98% power for Balance of Plant Ocznputer modification.
June 26, 1989 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> Reactor at 100% power.
Wolf Creek Generating Ctation Monthly Operating Report June 1989 Page 5 of 5
- - _ _ _