Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042A184 + (23:54:09, 19 December 2024)
- 05000333/LER-1982-003, Forwards LER 82-003/01T-0 + (23:54:10, 19 December 2024)
- ML20042A179 + (23:54:13, 19 December 2024)
- 05000277/LER-1982-002-03, /03L-0:on 820204,during Local Leak Test on Oxygen Analyzer,Solenoid Valve SV-2980 Failed to Seat Properly. Caused by Buildup of Dirt on Seating surface.Dymo-type Solenoid Valve Atkomatic 15-644 Disassembled & Cleaned + (23:54:14, 19 December 2024)
- ML20042A176 + (23:54:16, 19 December 2024)
- ML20042A174 + (23:54:17, 19 December 2024)
- ML20042A170 + (23:54:18, 19 December 2024)
- 05000277/LER-1982-003-03, /03L-0:on 820129,during Power Operation,Diesel Generator Cardox Tank Level Dropped Below Tech Spec Limit. Caused by Stuck Level Indicator Float Mechanism (Cardox P/N 124109),due to Ice.Float Replaced & Sys Blown Down + (23:54:19, 19 December 2024)
- ML20042A164 + (23:54:22, 19 December 2024)
- ML20042A163 + (23:54:23, 19 December 2024)
- 05000277/LER-1982-004-03, /03L-0:on 820206,during Surveillance Testing of Primary Containment Isolation Sys,Standby Gas Treatment Filter a Inlet Damper Failed to Automatically Open.Caused by Defective Damper Control Switch.Switch Replaced + (23:54:25, 19 December 2024)
- ML20042A161 + (23:54:26, 19 December 2024)
- ML20042A160 + (23:54:27, 19 December 2024)
- ML20042A159 + (23:54:28, 19 December 2024)
- ML20042A158 + (23:54:29, 19 December 2024)
- ML20042A156 + (23:54:31, 19 December 2024)
- ML20042A157 + (23:54:31, 19 December 2024)
- B10447, Final Significant Deficiency Rept SD-9 Re Main Feedline Rupture W/Failure of Blowdown Sys.Design Modified to Include Cavitating Venturies to Preclude Uncontrollable Auxiliary Feedwater Flows to Faulted Steam Generator + (23:54:32, 19 December 2024)
- ML20042A153 + (23:54:34, 19 December 2024)
- ML20042A152 + (23:54:35, 19 December 2024)
- TAC:46865 + (23:54:37, 19 December 2024)
- ML20042A150 + (23:54:37, 19 December 2024)
- ML20042A149 + (23:54:38, 19 December 2024)
- ML20042A147 + (23:54:42, 19 December 2024)
- ML20042A146 + (23:54:43, 19 December 2024)
- ML20042A145 + (23:54:44, 19 December 2024)
- ML20042A142 + (23:54:45, 19 December 2024)
- ML20042A143 + (23:54:45, 19 December 2024)
- ML20042A140 + (23:54:46, 19 December 2024)
- ML20042A139 + (23:54:47, 19 December 2024)
- ML20042A138 + (23:54:48, 19 December 2024)
- ML20042A137 + (23:54:49, 19 December 2024)
- ML20042A135 + (23:54:50, 19 December 2024)
- ML20042A134 + (23:54:51, 19 December 2024)
- ML20042A132 + (23:54:52, 19 December 2024)
- ML20042A131 + (23:54:52, 19 December 2024)
- ML20042A130 + (23:54:53, 19 December 2024)
- ML20042A129 + (23:54:54, 19 December 2024)
- ML20042A127 + (23:54:54, 19 December 2024)
- IR 05000334/1981031 + (23:54:55, 19 December 2024)
- ML20042A124 + (23:54:58, 19 December 2024)
- 05000318/LER-1982-009-03, /03L-0:on 820206 & 25,pressurizer Level Exceeded Tech Spec Requirements During Normal Startup Operations. Caused by Normal RCS Temp Swings.Investigation to Relax Limit Underway + (23:54:59, 19 December 2024)
- ML20042A120 + (23:55:00, 19 December 2024)
- 05000318/LER-1982-009, Forwards LER 82-009/03L-0 + (23:55:02, 19 December 2024)
- ML20042A115 + (23:55:03, 19 December 2024)
- ML20042A114 + (23:55:04, 19 December 2024)
- 05000219/LER-1982-010-01, /01T-0:on 820218,deluge Sys for Reactor Bldg Elevation 51 Ft Actuated Due to Smoke from Overheated Bearing in Cleanup Sys Auxiliary Pump Motor.Caused by Inadequate Electrical Sealing Techniques + (23:55:05, 19 December 2024)
- ML20042A111 + (23:55:07, 19 December 2024)
- ML20042A110 + (23:55:07, 19 December 2024)
- 05000219/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis Encl + (23:55:09, 19 December 2024)
- 05000245/LER-1982-004-03, /03L-0:on 820212,during Containment Isolation Valve Operability Demonstration,Isolation Condenser Condensate Return Valve 1-IC-3 Failed to Open Upon Signal. Caused by Contraction Upon Cooling.Valve Heated to Open + (23:55:11, 19 December 2024)