Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043A660 + (21:36:26, 19 December 2024)
- ML20043A658 + (21:36:29, 19 December 2024)
- 05000456/LER-1990-006-04, :on 891204 & 900416,diesel Generator 1B Experienced Slow Start.Caused by Crisscrossed Starting Airlines for Cylinders 6L & 9L.Starting Airlines Reconnected & Verified to Correct + (21:36:30, 19 December 2024)
- ML20043A656 + (21:36:32, 19 December 2024)
- ML20043A655 + (21:36:33, 19 December 2024)
- ML20043A653 + (21:36:34, 19 December 2024)
- ML20043A652 + (21:36:35, 19 December 2024)
- ML20043A651 + (21:36:36, 19 December 2024)
- PY-CEI-NRR-1177, Revised Emergency Public Info Organization Implementing Instructions Manual + (21:36:37, 19 December 2024)
- ML20043A649 + (21:36:39, 19 December 2024)
- ML20043A647 + (21:36:40, 19 December 2024)
- ML20043A646 + (21:36:42, 19 December 2024)
- ML20043A644 + (21:36:43, 19 December 2024)
- ML20043A643 + (21:36:44, 19 December 2024)
- ML20043A642 + (21:36:45, 19 December 2024)
- ML20043A641 + (21:36:47, 19 December 2024)
- ML20043A640 + (21:36:48, 19 December 2024)
- ML20043A639 + (21:36:49, 19 December 2024)
- ML20043A637 + (21:36:50, 19 December 2024)
- ML20043A636 + (21:36:54, 19 December 2024)
- ML20043A634 + (21:36:55, 19 December 2024)
- ML20043A617 + (21:37:00, 19 December 2024)
- 05000445/LER-1990-008, :on 900416,Train a Diesel Generator Rendered Inoperable Due to Failure to Complete post-work Operability Testing on Starting Air Receiver Check Valve 01. Caused by Inadequate Review.Procedure Revised + (21:37:01, 19 December 2024)
- 05000324/LER-1990-003, :on 900312,full Group 1 Isolation Signal Received,Resulting in Automatic Closure of Msivs.Caused by Personnel Failing to Follow Procedures.Personnel Counseled & Procedure Separated Into Two Tests + (21:37:03, 19 December 2024)
- 05000445/LER-1990-007, :on 900416,ESF Actuation Signal Occurred, Resulting in Train a of Control Room Air Conditioning Sys Shifting to Emergency Recirculation Mode.Caused by Personnel Error.Handswitch Added to Radiation Monitor + (21:37:05, 19 December 2024)
- ML20043A610 + (21:37:06, 19 December 2024)
- ML20043A609 + (21:37:07, 19 December 2024)
- ST-HL-AE-3458, Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (21:37:07, 19 December 2024)
- ML20043A607 + (21:37:12, 19 December 2024)
- ML20043A605 + (21:37:13, 19 December 2024)
- ML20043A603 + (21:37:14, 19 December 2024)
- ML20043A602 + (21:37:15, 19 December 2024)
- 1CAN059004, Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1 + (21:37:16, 19 December 2024)
- ML20043A598 + (21:37:18, 19 December 2024)
- ML20043A597 + (21:37:19, 19 December 2024)
- 2CAN059011, Monthly Operating Rept for Apr 1990 for Arkansas Nuclear One Unit 2 + (21:37:20, 19 December 2024)
- ML20043A595 + (21:37:22, 19 December 2024)
- PNO-III-90-032, on 900507,9 Yr Old Patient Received Therapeutic Radiation Dose 33% Greater than Prescribed. Caused by Personnel Error.Qc Procedure Failed to Detect Error in Timely Manner.Special Insp Will Be Conducted + (21:37:24, 19 December 2024)
- ML20043A593 + (21:37:26, 19 December 2024)
- ML20043A590 + (21:37:41, 19 December 2024)
- ML20043A589 + (21:37:43, 19 December 2024)
- ML20043A587 + (21:37:44, 19 December 2024)
- ML20043A585 + (21:37:46, 19 December 2024)
- ML20043A584 + (21:37:47, 19 December 2024)
- ML20043A583 + (21:37:48, 19 December 2024)
- ML20043A581 + (21:37:49, 19 December 2024)
- ML20043A580 + (21:37:50, 19 December 2024)
- ML20043A579 + (21:37:51, 19 December 2024)
- ML20043A578 + (21:37:53, 19 December 2024)
- ML20043A577 + (21:37:54, 19 December 2024)
- ML20043A574 + (21:37:55, 19 December 2024)
- ML20043A571 + (21:37:56, 19 December 2024)