i a
-p*
uth Cir fina Electric & Gas Cimpany Ollie S B adhim JarAlnavme, SC 20065 Nucliar Operatens (803) 345 4040 1
/
SCE&G i
sec, n May 15, 1990-gg gi\\9 *\\\\,' g i
i Mr. S. D. Ebneter f
Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900
'101 Marietta Street, N. W.
Atlanta,' Georgia 30323
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 90-004)
Dear Mr. Ebneter:
This Special Report is being submitted pursuant to the requirements of Station:. Administrative Procedure (SAP) 131A, " Fire Service Equipment / Systems Operability Requirements."-
t On March 23, 1990, the Virgil C.. Summer Nuclear Station (VCSNS) commenced shutdown for the fifth refueling outage. At 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on April 14,'1990, the-fire / pressure barrier for Trace No. 168 in Room CB-36-11 was removed from service to facilitate testing. Because the fire barrier was inoperable, VCSNS performed the fire detector operability check and established the. fire t
watch patrol for the trace as specified in the Action Statement of SAP-131A,Section VII, " Fire Rated Assemblies " The fire barrier was restored to service at 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> on April 21, 1990.
As specified in Special Report 90-002, dated April 19, 1990, SAP-131A.is being-revised to eliminate the need to report to the NRC fire barriers taken out of service as a matter of routine operation. The compensatory measures presently required for inoperable fire barriers will remain.
Should you have any questions, please call at your convenience.
Very truly yours, 4d h w
- 0. S. Bradham EWR/OSB: led 4 -
c:
See Page 2 9005220274 900515 giO PDR ADOCK 05000395 L
m S
PDC n
(7:
L
- . j.;-. < -
5..
(
Mr. S. D..Ebneter.
May 15, 1990
'l Page.2 of 2 o
i c:-
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
~I E.:C. Roberts p
R.~:V. Tanner i_
General Managers 1
J. J.1 Hayes,1Jr.
h C. A. Price R. B._Clary.
J. R. Proper L
K. E.-Nodland-J.'C. Snelson
'J.
B. Knotts, Jr.
R. L. Prevatte E. W. Rumfelt Marsh & McLennan Document' Management Branch INP0 Records' Center ANI Library NSRC NPCF' RTS.(0N0900046) 4-,
file (818.05 & 818.08)
- j o
l l.
I L
- .