Special Rept Spr 90-004:on 900414,fire/pressure Barrier for Trace 168 in Room Cb 36-11 Removed from Svc to Facilitate Testing.Fire Barrier Restored to Svc on 900421
ML20043A579
Person / Time
Site: Summer 
Issue date: 05/15/1990
From: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
SPR-90-004, SPR-90-4, NUDOCS 9005220274
Download: ML20043A579 (2)


Text

i a

-p*

uth Cir fina Electric & Gas Cimpany Ollie S B adhim JarAlnavme, SC 20065 Nucliar Operatens (803) 345 4040 1

/

SCE&G i

sec, n May 15, 1990-gg gi\\9 *\\\\,' g i

i Mr. S. D. Ebneter f

Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900

'101 Marietta Street, N. W.

Atlanta,' Georgia 30323

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 90-004)

Dear Mr. Ebneter:

This Special Report is being submitted pursuant to the requirements of Station:. Administrative Procedure (SAP) 131A, " Fire Service Equipment / Systems Operability Requirements."-

t On March 23, 1990, the Virgil C.. Summer Nuclear Station (VCSNS) commenced shutdown for the fifth refueling outage. At 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on April 14,'1990, the-fire / pressure barrier for Trace No. 168 in Room CB-36-11 was removed from service to facilitate testing. Because the fire barrier was inoperable, VCSNS performed the fire detector operability check and established the. fire t

watch patrol for the trace as specified in the Action Statement of SAP-131A,Section VII, " Fire Rated Assemblies " The fire barrier was restored to service at 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br /> on April 21, 1990.

As specified in Special Report 90-002, dated April 19, 1990, SAP-131A.is being-revised to eliminate the need to report to the NRC fire barriers taken out of service as a matter of routine operation. The compensatory measures presently required for inoperable fire barriers will remain.

Should you have any questions, please call at your convenience.

Very truly yours, 4d h w

0. S. Bradham EWR/OSB: led 4 -

c:

See Page 2 9005220274 900515 giO PDR ADOCK 05000395 L

m S

PDC n

(7:

L

. j.;-. < -

5..

(

Mr. S. D..Ebneter.

May 15, 1990

'l Page.2 of 2 o

i c:-

0. W. Dixon, Jr./T. C. Nichols, Jr.

~I E.:C. Roberts p

R.~:V. Tanner i_

General Managers 1

J. J.1 Hayes,1Jr.

h C. A. Price R. B._Clary.

J. R. Proper L

K. E.-Nodland-J.'C. Snelson

'J.

B. Knotts, Jr.

R. L. Prevatte E. W. Rumfelt Marsh & McLennan Document' Management Branch INP0 Records' Center ANI Library NSRC NPCF' RTS.(0N0900046) 4-,

file (818.05 & 818.08)