Amend 49 to License NPF-49,modifying Statement C of Tech Spec 3.7.12.1, Fire Suppression Water Sys, to State That Provisions of Specs 3.0.3 & 3.0.4 Not Applicable
ML20043A647
Person / Time
Site: Millstone 
Issue date: 05/15/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Northeast Nuclear Energy Co (NNECO)
Shared Package
ML20043A648 List:
References
NPF-49-A-049 NUDOCS 9005220354
Download: ML20043A647 (5)


Text

_

e cao vg'o UNITED STATES

' 8-

~p NUCLEAR REGULATORY COMMISSION

. ' ' [.

.f WASHINGTON, D. C. 20555 N_0RTHEAST' NUCLEAR ENERGY COMPANY, IT AL.

DOCKET NO. 50-423 MILLSTONE-NUCLEAR POWER STATION, UNIT NO. 3-AMENDfiENT TO FACILITY OPERATING LICENSE ~

.c Amendsent-No.

49 License No. NPF-49 1.

The Nuclear Regulatory Commission (the Commission) has found that:

The app (lication for amendment by Northeast Nuclear Energy Company, A.

et'al.

the. licensee) dated April 2, 1990, complies with the standards and requirements of the~ Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set.

forth in 10 CFR Chapter I;-

B.

The facility will operate in conformity with-the application, the L

provisions.of the Act and-the rules and regulations.of the I

Commission; C.

There is reasonable assurance (i) that the activities authorized by.

this amendment can be conducted without' endangering:the health and safety of the public, and (.ii) that such activities will be L

conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10.CFR Part 51 L

of the Commission's regulations and all applicable requirements have l-been satisfied.

i yy 1

C P

-2 2.

Accordingly, the license is anended by changes to the Technical.

h

'l Specifications as indicated in the attachment to this license amendment,:

i and paragraph 2.C.(2) of Facility Operating License' No'. NPF-49 is hereby

' amended to read as follows:

j (2) Technical Specifications The Technical Specifications, contained in Appendix A, as revised through Amendment ilo. 49

, and.the Environmental Protection Plan contained in' Appendix B, both of which are attached hereto are hereby incorporated in the license..The licensee shall operate the

~

facility in accordance with the Technical Specifications and the i

Environmental Protection Plan.-

4 3.

This license amendment is effective as of the date of its issuance, to be j

implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMPISSION C

'll '

i oh

. Stolz. Director Pr 'ect Directorate 1 4 0

i D ision of Reactor Projects - I/II' i

Office of Huclear-Reactor' Regulation-

Attachment:

Changes to the Technical i

Specifications i

Date of Issuance:

May 15, 1990 f

a l

1 I

1

ATTACHMENT T0-LICENSE AMENDitENT NO.

FACILITY OPERATING LICENSE NO. NpF-49 I

DOCKET NO. 50-423

' l Replace the page 3/4 7-30 of the Appendix A' Technical Specifications with the enclosed page.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change. The corresponding overleaf pages is provided to maintain document completeness.

t 4

1

,m m mm.

i

d l^

1

^

PLANT SYSTEMS

.2 SURVEILLANCE REQUIREMENTS (Continued) b.

Stored sources not-in use - Each sealed source and. fission detector shall' be tested prior to use or transfer to another licensee unless=

tested within the previous 6. months. ' Sealed sources and fission detectors transferred without a' certificate indicating the last test.

date shall be tested prior to being placed into use; and Startup sources and fission. detectors - Each sealed startup source c.

and fission detector shall be tested within:31 days prior to being subjected.to core flux or installed in the core and following repair-or maintenance to the: source.

4.7.11.3 Reports - A-report shall-be prepared and submitted to the Commission-on an annual basis if sealed source or fission detector leakage tests reveal the presence of greater.than or equal to 0.005 microcurie of removable contamination.

Y e

)

.,{

MILLSTONE - UNIT 3 3/4 7-29 i;

.~. J

PLANT SYSTEMS 3/4.7.12 FIRE SUPPRESSION SYSTEMS

. FIRE SUPPRESSION WATER SYSTEM' LIMITING CONDITION FOR OPERATION 3.7.12.1 The Fire SuppressionL Water System shall be OPERABLE with:

At least thbee_ fire suppression pumps', each with a capacity of' i

a '. -

1800 gpm, with : theirf discharge aligned to the fire suppression u

header, l

b.

Separate water. supplies, ~ each with a min'imum contained. volume of 200,000 gallons, and i

1 An OPERABLE flow path capable of taking suction from the~ fire water c.

tanks and transferring the water through distribution piping with OPERABLE sectionalizing. control or isolation valves to the-yard hy-drant curb valves, hose. standpipes, the first valve upstream of-the water flow alarm device on each sprinkler and-the first valve upstream of the deluge valve on each Deluge or Spray System required to be OPERABLE per Specifications 3.7.12.2, 3.7.'12.5, and 3.7.12.6.

APPLICABillTY: At all times.

ACTION:

With one pump and/or one water supply inoperable, restore the inoper-a.

-able equipment to OPERABLE status within 7 days or provide an alter-nate backup pump or supply.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable, b.

With two pumps inoperable, establish-a continuous fire watch of the turbine building with back-up fire -suppression equipment within I hour.

The provisions of Specifications -3.0.3 and 3.0.4 are not applicable.

c.

With the Fire Suppression Water System otherwise inoperable, 4

establish a backup Fire Suppression Water System within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The provisions of Specifications 3.0.3 and 3.0.4:are not applicable.

MILLSTONE - UNIT 3 3/4 7-30 Amendment No. 49 1