Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045G591 + (15:51:31, 19 December 2024)
- ML20045G590 + (15:51:32, 19 December 2024)
- SNRC-2071, Forwards Request for Exemption from Requirements of Revised 10CFR20,stds for Protection Against Radiation.Requests Also That Interim Relief from Implementation Date of Revised Requirements in 10CFR20.1001-20.2401 Be Promptly Granted + (15:51:33, 19 December 2024)
- ML20045G588 + (15:51:34, 19 December 2024)
- ML20045G587 + (15:51:35, 19 December 2024)
- ML20045G586 + (15:51:36, 19 December 2024)
- ML20045G585 + (15:51:37, 19 December 2024)
- ML20045G584 + (15:51:38, 19 December 2024)
- B14539, Forwards Rev 26 to Haddam Neck Plant Physical Security Plan. Rev Withheld,Per 10CFR2.790(a) + (15:51:39, 19 December 2024)
- 05000325/LER-1993-003-03, :on 930608,RPS MG a Tripped,Resulting in Successful ESF Actuations & Isolations Due to Defective Procedure.Voltage Adjust Potentiometer for MG a Voltage Regulator Replaced on 930617 + (15:51:41, 19 December 2024)
- ML20045G581 + (15:51:42, 19 December 2024)
- BSEP-93-0108, Provides Suppl Info Re Tornado Wind Loads on Reactor Bldg Fan Room Miscellaneous Steel Framing for Partition Walls + (15:51:43, 19 December 2024)
- ML20045G578 + (15:51:45, 19 December 2024)
- ML20045G577 + (15:51:46, 19 December 2024)
- ML20045G576 + (15:51:46, 19 December 2024)
- ML20045G575 + (15:51:47, 19 December 2024)
- ML20045G574 + (15:51:48, 19 December 2024)
- B14519, Forwards Applied Research Associates,Inc Final Rept 5773.1, Tornado PRA of CT Yankee Atomic Power Station:Update 1992, to Support Closeout of SEP Topics III-2 & III-4.A Re Wind & Tornado Loadings/Tornado Missiles,Respectively + (15:51:49, 19 December 2024)
- ML20045G571 + (15:51:51, 19 December 2024)
- ML20045G570 + (15:51:53, 19 December 2024)
- ML20045G569 + (15:51:54, 19 December 2024)
- PNO-III-93-040, on 930619,plant Shut Down for Repair of Leak in HPCI Sys.Licensee Does Not Plan to Restart Plant as Previously Scheduled Because of Flooding of Area Evacuation Routes + (15:51:56, 19 December 2024)
- ML20045G567 + (15:51:57, 19 December 2024)
- ML20045G565 + (15:51:58, 19 December 2024)
- ML20045G564 + (15:51:59, 19 December 2024)
- ML20045G561 + (15:52:00, 19 December 2024)
- HL-3334, Part 21 Rept Re Defect in safety-related Solenoid Valve Mfg by Automatic Valve Co & Supplied by Atwood & Morrill Co,Inc. Solenoid Valves Installed in Unit 1 MSIVs Visually Inspected.Spare Solenoids Inspected Also + (15:52:01, 19 December 2024)
- ML20045G560 + (15:52:01, 19 December 2024)
- ML20045G553 + (15:52:04, 19 December 2024)
- ML20045G558 + (15:52:04, 19 December 2024)
- PNO-III-93-038A, licensee & Fuel Vendor Confirmed That Highly Radioactive Object Found in Refueling Area Was Fuel Rod from Fuel Assembly Currently Located in Reactor Vessel.Three Pieces of Fuel Rod Recovered.Some Pellets Still Missing + (15:52:07, 19 December 2024)
- ML20045G551 + (15:52:07, 19 December 2024)
- ML20045G549 + (15:52:08, 19 December 2024)
- ML20045G548 + (15:52:09, 19 December 2024)
- ML20045G547 + (15:52:12, 19 December 2024)
- ML20045G546 + (15:52:13, 19 December 2024)
- ML20045G545 + (15:52:14, 19 December 2024)
- PNO-III-93-039, on 930706,augmented Insp Team Dispatched to Facility Due to Fuel Assembly Stuck as Upper Reactor Internals Lifted.Licensee Stopped Lift & Closed Containment Hatch to Restore Containment Integrity + (15:52:19, 19 December 2024)
- ML20045G543 + (15:52:20, 19 December 2024)
- ML20045G542 + (15:52:22, 19 December 2024)
- ML20045G541 + (15:52:23, 19 December 2024)
- ML20045G539 + (15:52:36, 19 December 2024)
- ML20045G538 + (15:52:37, 19 December 2024)
- ML20045G537 + (15:52:38, 19 December 2024)
- ML20045G536 + (15:52:39, 19 December 2024)
- ML20045G535 + (15:52:40, 19 December 2024)
- ML20045G534 + (15:52:42, 19 December 2024)
- ML20045G532 + (15:52:43, 19 December 2024)
- ML20045G531 + (15:52:44, 19 December 2024)
- L-93-026, Forwards Proprietary Update to C-E Physical Security Plan, Providng Info Re Removal of Room 224C in Bldg 5 of Product Development Facility from NRC Approved Security Plan,Since Vendor No Longer Plans to Handle SNM in Room.Encl Withheld + (15:52:45, 19 December 2024)
- JAFP-93-0381, Monthly Operating Rept for June 1993 for Ja FitzPatrick Nuclear Power Plant + (15:52:47, 19 December 2024)
- ML20045G526 + (15:52:50, 19 December 2024)