Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059J485 + (06:41:48, 17 December 2024)
- ML20059J484 + (06:41:49, 17 December 2024)
- ML20059J482 + (06:41:50, 17 December 2024)
- ML20059J483 + (06:41:50, 17 December 2024)
- ML20059J479 + (06:41:51, 17 December 2024)
- ML20059J477 + (06:41:52, 17 December 2024)
- ML20059J474 + (06:41:53, 17 December 2024)
- 05000440/LER-1990-018, :on 900817,determined That Containment Average Temp/Relative Humidity Not Verified within Tech Spec Figure 3.6.5.2-1 Limits.Caused by Programmatic Weakness in Use of Process Computer Sys Info to Determine Tech Spec Compliance + (06:41:55, 17 December 2024)
- ML20059J471 + (06:41:56, 17 December 2024)
- ML20059J469 + (06:41:57, 17 December 2024)
- 05000440/LER-1990-019, On 900817 & 0901,liquid Radiological Effluent Releases Performed W/Radioactive Effluent Monitoring Instrumentation Inoperable W/O Completing Independent,Per Tech Spec 3.3.7.9.On 900820,channel Improperly Calibr + (06:42:01, 17 December 2024)
- ML20059J463 + (06:42:03, 17 December 2024)
- ML20059J462 + (06:42:03, 17 December 2024)
- ML20059J460 + (06:42:04, 17 December 2024)
- ML20059J461 + (06:42:04, 17 December 2024)
- ML20059J459 + (06:42:05, 17 December 2024)
- ML20059J456 + (06:42:06, 17 December 2024)
- ML20059J453 + (06:42:07, 17 December 2024)
- ML20059J450 + (06:42:08, 17 December 2024)
- ML20059J447 + (06:42:08, 17 December 2024)
- LD-93-158, Requests Counsel on Sys 80+ Design Certification Project Be Placed on Svc List to Receive Documents Re General Electric Advanced Boiling Water Reactor Design Certification Application & Rulemaking + (06:42:09, 17 December 2024)
- PY-CEI-NRR-1188, Application for Amend to License NPF-58,revising Tech Specs Re Recalculation of Reactor Vessel pressure-temp Limits,Per Generic Ltr 88-11 + (06:42:09, 17 December 2024)
- ML20059J428 + (06:42:10, 17 December 2024)
- ML20059J425 + (06:42:10, 17 December 2024)
- ML20059J421 + (06:42:11, 17 December 2024)
- 05000282/LER-1990-009-01, :on 900811,automatic Start of Component Cooling Pump Occurred.Caused by Momentary Low Pressure in Component Cooling Water Sys.Procedures to Be Revised to Warn Operator of Possibility of Automatic Pump Starts + (06:42:13, 17 December 2024)
- ML20059J404 + (06:42:14, 17 December 2024)
- PY-CEI-NRR-1226, Forwards LERs 90-018-00 & 90-019-00 for Plant + (06:42:14, 17 December 2024)
- ML20059J387 + (06:42:15, 17 December 2024)
- ML20059J384 + (06:42:16, 17 December 2024)
- 05000461/LER-1990-015, ;on 900816,inadvertent Shorting of Circuit Card Edge Connectors Occurred During Card Removal.Shorting Caused Isolation Signal & Half Scram.Caused by Personnel Error. Technician Counseled + (06:42:18, 17 December 2024)
- ML20059J367 + (06:42:19, 17 December 2024)
- ML20059J366 + (06:42:20, 17 December 2024)
- RC-93-0283, Responds to 930621 GL 93-04,Rod Control Sys Failure & Withdrawal of Rod Control Cluster Assemblies, Per 10CFR50.54(f) + (06:42:21, 17 December 2024)
- ML20059J365 + (06:42:21, 17 December 2024)
- ML20059J363 + (06:42:22, 17 December 2024)
- ML20059J357 + (06:42:39, 17 December 2024)
- ML20059J356 + (06:42:40, 17 December 2024)
- ML20059J355 + (06:42:40, 17 December 2024)
- ML20059J354 + (06:42:41, 17 December 2024)
- 05000289/LER-1993-007, :on 931008,pressure Isolation Valve Failed to Seat Tightly During Plant Operation Due to Loose Hinge Mechanism.Replaced Internals of Pressure Isolation Valve + (06:42:43, 17 December 2024)
- 05000458/LER-1990-025, :on 900809,surveillance Requirements Not Performed on Valve Due to Omission from Tech Spec Table 3.6.4-1.Caused by Personnel Oversight.Monthly Operating Log Revised + (06:42:45, 17 December 2024)
- 05000327/LER-1990-013, :on 900601,removal of Lighting Diffuser Panels in Control Room Affected Air Flow Pattern Rendering Smoke Detectors Inoperable.Caused by Inadequate Design Review. Discipline Fire Protection Review Clarified + (06:42:47, 17 December 2024)
- ML20059J347 + (06:42:48, 17 December 2024)
- ML20059J342 + (06:42:50, 17 December 2024)
- ML20059J345 + (06:42:50, 17 December 2024)
- 05000313/LER-1990-008, :on 900809,determined That Control Room Wall Not Seismically Qualified.Caused by Engineering Error in Accepting Deficient Installation During Const of Wall.Review of All Masonary Walls in Progress + (06:42:52, 17 December 2024)
- ML20059J337 + (06:42:53, 17 December 2024)
- ML20059J335 + (06:42:55, 17 December 2024)
- ML20059J336 + (06:42:55, 17 December 2024)
- ML20059J334 + (06:42:56, 17 December 2024)
- ML20059J332 + (06:42:57, 17 December 2024)