ML20059J450

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1993 for Bvps,Units 1 & 2.W/
ML20059J450
Person / Time
Site: Beaver Valley
Issue date: 10/31/1993
From: David Jones, Spoerry D
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9311120207
Download: ML20059J450 (10)


Text

,,. ~..

.q

'Ab?

Telephone (412) 393M Nuclear Group

-(

P.O Box 4 Shapomgport PA 15077-0004 I

November 8,1993

-l I

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Onerating Report l

l U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 j

lf Gentlemen:

In accordance with Appendix A,

Technical Specifications,, the Monthly Operating Report is submitted for Unit I and Unit 2 for the' month of l

October, 1993.

In addition, a correction to the Gross Electrical Energy Generation (Item No.17) on the Unit I operating Data Report for the month of September 1993 is included.

Respectfully,

]

{

D. E. Spoerry j

Division Vice President 1

Nuclear Operations.

DTJ/mmg i

-- Enclosures j

~

cc: NRC Regional Office King of Prussia, PA i

-]

.)

150002 f

]

931112O207 931031-7

)

-'PDR ADOCK 05000334-1 R-PDR

1RPRRTIVE Sutt9RY OF FOffIHLY OPEPATDIG EXPERIDJCE UNIT 1 OCIOBER 1993 October 1

'Ihe Unit operated at a nominal value of 100% output.

through October 11 October 12 At 1507 hours0.0174 days <br />0.419 hours <br />0.00249 weeks <br />5.734135e-4 months <br /> the Unit experienced a loss of the majority of offsite load when ten offsite feed breakers in the Beaver Valley switchyard opened as a

result of inadvertent underfrequency system separation.

We large load reduction caused the turbine to trip on nechanical overspeed and resulted in a "high flux rate positive" reactor trip. The opening of the switchyard feed breakers arx1 the resultant turbine generator trip resulted in a loss of offsite power to both Beaver Valley Units 1 and 2.

Offsite power was restored to both Units at 1517 hours0.0176 days <br />0.421 hours <br />0.00251 weeks <br />5.772185e-4 months <br />.

'Ihe Unit remained in Mode 3 to ccuplete required inspections on the RCS Protection RID's.

October 13 The Unit initiated a cooldcun to Mode 5 at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> due to pressure boundary leakage from the Loop 1A Cold Irg Isolation Vent [1RC-27). Mode 4 was entered at 1747 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.647335e-4 months <br />.

October 14 Mode 5 was entered at C.;00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

October 15 The Unit remained in Mode 5 while performing repairs to thrcugh

[1RC-27).

s October 18 October 19 Completed removing

[1RC-27) and plugging the line as a temporary repair until the loth refueling outage (10R).

f October 20 The Unit remained in Mode 5 during plant recovery to permit plant startup.

October 21 D.1 ring plant startup, the "C" Reactor Coolant Pump tripped at 1658 hours0.0192 days <br />0.461 hours <br />0.00274 weeks <br />6.30869e-4 months <br />. Investigation revealed a ground in the motor.

October 22

'Ihe Unit remained in Mode 5 for the remainder of the report through period shile repairs to the "C" Reactor Coolant Pump motor 4

October 31 continued.

1

l AVERAGE DAILY WIT FCEER LEVEL DOCKEP 10.

50-334 i

WIT BVPS Unit 1 DATE Nov. 3. 1993 1

CmPLETED BY David T. Jones TELEPHONE

- (412) 393-7553 Mormi October 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PGiER LEVEL (We-Net)

'(MWe-Net) 1 808 17 0

2 800 18 0

3 813 19 0

4 804 20 0

5 808 21 0

6 821-22 0

.k 7

796 23 0

8 800 24 0-9 800 25 0

10 817 2F 0

11 813 27 0

12 508 28 0

13 0

29 0

14 0

30 0

15 0

31 0

f

-16 0

i t

INSTRUCTIQ4S On this form, list the average daily unit pcuer level MWe-Net for each day ini

.I the reporting month. Conpute to the nearest whole megawatt.

l l

/

v

.a.

I OPERATING DATA REPORT.

f DOCKET NO.:

50-334 REPORT DATE:

11/04/93 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 r

OPERATING STATUS i

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: OCTOBER 1993
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835 2

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810 t

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE I

11. HOURS IN REPORTING PERIOD:

745.0 7296.0 153432.0

J
12. NO.-OF HRS. REACTOR WAS CRITICAL:

279.1 4883.3 98433.6'

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LIKE:

279.1 4823.6 96474.4

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0~

16. GROSS THERMAL ENERGY GEN. (MWH):

735881.0

-11715850.0-230690851.5

17. GROSS ELECT. ENERGY GEN. (MWH):

238850.0

.3785260.0 74279753.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

220260.0 3534510.0 69400450.0

19. UNIT SERVICE FACTOR: (PERCENT) 37.5 66.1 64.8

.}

20. UNIT AVAILABILITY FACTOR:(PERCENT) 37.5 66.1 64.8
21. UNIT CAPACITY FACTOR-(MDC): PCT 36.5 59.8 58.4
22. UNIT CAPACITY FACTOR (DER): PCT

-35.4 58.0 56.6:

23. UNIT FORCED OUTAGE RATE: (PERCENT) 62.5 9.7 15.7
24. SHUTDOWNS SCHEDULED OVER NEXT SIX' MONTHS (TYPE,DATE,AND DURATION OF EACH):

~

THE UNIT IS CURRENTLY SHUTDOWN TO REPAIR THE "C" REACTOR COOIANT PUMP MOTOR;

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

11/7/93 i

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED 5

INITIAL CRITICALITY N/A-N/A

)

INITIAL'ELT3TRICITY N/A N/A d

COMMERCIAL OPERATION N/A-

-N/A i

~!

-i

4 4 -

4 UNii $NUTDOWNS AND P0uCR REDUCil0NS (220%)

Docket No.

50-334 Unit Name BVPS Unit #1 Date Nov*mber 4 1993 Completed By _ David T. Jones REPORT MONTH OCTOBER 1993 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Typel (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence 11 931012 F

20.05 H

3 1-93-13 EA CKTBRK The Unit experienced a high flux

?-

rate positive reactor trip following a mechanical overspeed trip of the turbine caused by a large load reduction. The large load reduction was caused by a loss of the majority of offsite loads when ten offsite feed breakers in the Beaver valley switchyard opened as a result of inadvertent underfrequency system separation.

12-931013 F

197.8 A

9 N/A CB PIPExx The Unit remained shutdown to repair pressure boundary leakage from the Loop 1A Cold Leg Isot vent (1RC 271.

13 931021 F

248.05 A

9 N/A CB M010RX The Unit remained shutdown to repair a ground in the "C" Reactor Coolant Pump Motor.

t 1

2 3

4 F-Forced Reason:

Method:

Exhibit F-Instructions for S Scheduled

.A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets 8' Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling.

3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont 8d. from Previous Month E-Operator Training & License Exam 5-Reduction.

5 F Administrative 9-Other Exhibit H-Same Source.

C-Operational Error.(Explain)

-H-Other (Explain) t

- - -,,. ~.,,

.a.m.~.-

em...

4.

. i, J... --.. _.......

. ~.,. - - -.. -.,, - -.

---.-J.----- -~

NARRATIVE SLMRRY OF MD!nELY OPERATIli3 EXPERIENCE LWIT 2 OCIOBER 1993 October 1

'Ihe report period began with the Unit in Mode 6.

'Ibe Lhit I

through remained in Mode 6 as the fourth refueling outage continued.

October 30 October 31

'Ihe Unit entered Mode 5 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> and remained in Mode 5 for the rerainder of the report period as the fourth' refueling outage continued.

7 E

l b

l l

f l

6 i

l l

=

w AVERAGE DAILY WIT PCMER LEVEL DOCKLT NO.

50-412 WIT BVPS Unit 2 DATE Nov. 3, 1993;_

CCEPIEfED BY David T. Jones TELEPHONE (412) 393-7553__

MO?mi October 1993 DAY AVERAGE DAILY KWER LEVEL DAY AVERAGE DAILY POWER LLVEL (We-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

M 3

0 19 0

i 4

0 20 0-5 0

21 0

't

'6 0

22 0

7 0

23 0

i 8

0 24 0

f 9

0 25 0

10 0

26 0

a 11 0

27 0

r 12 0

28 0-13 0

29 0-f 0-30 0

't 15' O

31 0

,.t 16 0

INSTRUCTIONS.

~l

. On this forra, list the average daily unit pcuer level HWe-Net for each day in the reporting monta. Campute to the nearest whole megawatt.

P

i

- ~ - -

i

-c.

OPERATING DATA REPORT I

DOCKET No.:

50-412 REPORT DATE:

11/04/93 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: OCTOBER 1993
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

' t

~

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820 b

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO UHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE '

11. HOURS IN REPORTING PERIOD:

745.0 7296.0 52215.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

0.0 6205.8 44707.0-

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0.

14. HOURS GENERNIOR WAS ON LINE:

0.0 6197.8 44423.1 1

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0

-0.0

16. GROSS THERHAL ENERGY. GEN. (MWH):

0.0

.15366901.0 108913542.4

17. GROSS ELECT. ENERGY GEN. (EP):

0.0 5073344.0 35217148.0

18. NET ELECTRICAL ENERGY CEN. (ET):

-2179.0 4805345.0 33255152.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 84.9 85.1'
20. UNIT AVAILABILITY FACTOR:(PERCENI) 0.0 84.9 85.1-
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 80.3 77.1.
22. UNIT CAPACITY FACTOR (DER): PCT

-0.0 78.8 76.2-

23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.6 2.9
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):

J E FOURTH REFUELING OUTAGE CURRENTLY IN PROGRESS BEGAN ON SEi-irABER

17. 1993 AND IS SCHEDULFD TO IAST FOR 70 DAYS.

-E

25. IF SHUT DOWN AT END OF REPORT PERIOD', ESTIMATED DATE OF STARTUP:

11/26/93-I

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)*.

4 FORECAST-

. ACHIEVED

-INITIAL CRITICALITY N/A N/A i

INITIAL ELECTRICITY N/A

_.. N/A COMMERCIAL OPERATION N/A N/A i

1 J

d

~,

e r

s

y

' d' UNIT SHufDOWNS AND POWER REDUCi!ONS (120%)

Docket No.

50-412 Unit Name BVPS Unit #2 Date November 4 1993 Compseted By _ David T.

Jones REPORT MONTH OCTOBER 1993 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Typel (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence 1$

931001 S

745.0 C

4 N/A RC FUELXX Unit remained shutdown for the fourth reiuating outage.

1 2

3 4

F-Forced

. Reason:

Method:

Exhibit F-Instructions for S Scheduled A-Equipment Falture (Explain)-

1-Manual-Preparation of Data Entry Sheets B Maintenance or Test 2-Manual Scram for License? Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D Regulatory Restriction 4-Cont'd.'from Previous Month

'E Operator Training & License Exam 5-Reduction 5:

F-Administrative 9-Other Exhibit H-Same Source.

G-Operational' Error (Emplain)

M-Other (Explain)

.w

=.

~

/

~

i

.1

~

OPERATING DATA REPORT

+

DOCKET NO.:-

50-334 REPORT DATE:

11/04/93 i

COMPLETED BY:. DAVID T. JONES TELEPHONE:

(412) 393-7553 s

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: SEPTEHBER 1993
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN. ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6551.0~

152687.0

12. NO. OF HRS REACTOR WAS CRITICAL:

720.0 4604.2 98154.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 4544.5 96195.3

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0

0. 0 '
16. GROSS THERMAL ENERGY GEN. (MWH):

1903751.0 10979969.0 229954970.5

17. GROSS ELECT. ENERGY GEN. (MWH):

613760.0 3546410.0 74040903.0 l-

18. NET ELECTRICAL ENERGY GEN. (MWH):

578400.0 3314250.0 69180190.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 69.4 65.0-
20. UNIT AVAILABILITY FACTOR:(PERCENT)-

100.0 69.4 65.0

21. UNIT CAPACITY FACTOR (MDC): PCT 99.2 62.5 58.5
22. UNIT CAPACITY FACTOR (DER): PCT 96.2 60.6 56.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.2 15.3
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS.IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED-INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

l l

5

. -.