Text
_ __
7590-01 UNITED STATES NUCLEAR REGULATORY COMM1SSION COMMONWEALTH EDISON COMPANY DOCKET P0. 50-254 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE. PROPOSED NO SIGNIFICANT HA7ARDS CONSIDERATION DETEP,MINATION. AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Comission (the Commission) is considdring issuance of an amendment to Facility Operating License No. DRP-29, issued to the Commonwea?th Edison Company (the licensee), for operation of the Quad Cities Nuclear Power Station, Unit 1, located in Rock Island County, Illinois.
The proposed amendment resolves unreviewed safety questions (USQ) related to proposed plant modifications associated with Reactor Vessel Water Level Instrumentation. These modifications have been initiated to mitigate the circumstances outlined in NRC Bulletin 93-03, " Resolution of Issues Related to Reactor Water Level Instrumentat;on in BWRs" dated May 28, 1993 (Bulletin).
Exigent circumstances exist because the design of the backfill instrumentation to meet the requirements of the Bulletin was not completed on a schedule to ensure that the resolution of the USQ would allow time for the normal 30-day public comment period and still allow startup from the planned maintenance outage for Quad Cities, Unit 1, scheduled for completion before November 22, 1993.
Before issuance of the proposed license amendment, the Comission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
U 9311120228 931103 PDR-ADDCK 05000254 5$
p PDR b
Pursuant to 10 CFR 50.91(a)(6), for an amendment to be granted under exigent circumstances, the NRC staff must detemine that the amendment request -
involves no significant hazards consideration. Under the Comission's regulations in 10 CFR 50.92, this n.eant that operation of the facility 1.1 accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
1)
Involve a significant increase in the probability or consequences of an accident previously evaluated because:
i The addition of the backfill instrumentation piping does not significantly increase the probability of an accident previously evaluated due to the low probability of the inadvertent closure of the root valves (s). CECO has evaluated the estimated frequency of the inadvertent closure of the root valve (s) at approximately IE-08 per reactor year given the imp.ementation of administrative controls. The resulting condit.on (valve mismanipulation) cycles the Reactor Pressure Vessel in a similar manner as a plant LOCA (i.e., simulates LOCA conditions). The current (pre-modification) s LOCA initiation frequency is predicted to be approximately IE-04 per reactor year. Therefore, the proposed modifications do not significantly increase the probability of any previously evaluated accident The consequences of any previously evaluated accident are not increased by the proposed modifications. For example, the consequences of closing the root valve for the reference leg from condensing chamber 12A, without first isolating the backfill injection, is the inadvertent pressurization of the reference leg i
resulting in the opening of the SRV and all Electromatic reliefs.
This is equivalent to an inadvertent actuation of the automatic-depressurization system (ADS) - an event that is not analyzed in the safety analysis as an initiating event. Regardless, the event is bounded by the recirculation line break analysis in terms of the RPV 1
~
_3_
~
responsa.
Because this event would release inventory to the suppression pool, it has less significant consequence than other events previously analyzed for Dresden and Quad Cities Stations.
2)
Create the possibility of a new or different kind of accident from any accident previously evaluated because:
For Dresden and Quad Cities Station, a spectrum of Loss-of-Coolant Accidents have previously been evaluated. The accident in question associated with the proposed modifications can'be categorized as a LOCA due to the resultant plant response following the initiating conditions. The previously analyzed LOCA analyses bound the conditions introduced by the proposed modifications. As such, the proposed amendment request for Dresden and Quad Cities Stations do not introduce any new or different kinds of accidents.
The proposed modification connects the non-safety-related CRD system to each division of RPV instrumentation. The failure of the CRD piping may result in instrument line leakage. However, this event is mitigated by the isolation action of the reference leg backfill instrument check valves. Although the proposed modifications may introduce the potential for a malfunction of equipment of a different type than previously evaluated in the safety analysis report, the proposed amendment request for Dresden and Quad Cities Stations does not introduce any new or different kinds of accidents.
3)
Involve a significant reduction in the margin of safety because:
The previously analyzed LOCA consequences bound the consequences introduced by the inadvertent closure of the root valve (s) and subsequent LOCA conditions. As such, the previously approved safety-margin remains unchanged. Therefore, the proposed modifications do not significantly reduce the margin of safety for both Dresden and Quad Cities Stations.
The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied.
Therefore, the NRC staff proposes to determine that the amendment request involves no significant hazards consideration.
The Comission is seeking public comments on this proposed determination.
Any coments received within 15 days after the date of publication of this notice will be considered in making any final determination.
Normally, the Commission will not issue the amendment until the expiration of the 15-day notice period. However, should circumstances change during the notice period, such that failure to act in a timely way would i
result, for example, in derating or shutdown of the facility, the Commission may issue the license amendment before the expiration of the 15-day notice period, provided that its final determination is that the amendment involves no significant hazards consideration. The final determination will consider all public and State comments received. Should the Commission take this action, it will publish in the FEDERAL REGISTER a notice of issuance. The Commission expects that the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Rules Review and Directives Branch, Division of Freedom of Information and Publications Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20553, and should cite the publication date and page number of this FEDERAL REGISTER notice. Written comments may also be delivered to Room P-223, Phillips Building, 7920 Norfolk Avenue, Bethesda, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received may be examined at the NRC Public Document Room, the Gelman Building, 2120 L Street, NW.. Washington, DC 20555.
The filing of requests for hearing and petitions for leave to intervene is discussed below.
By December 9,1993
, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this
I proceeding and who wishes to participate as a party in the proceeding must i
file a written request for a hearing and a petition for leave to intervene.
Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission's " Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
Interested persons should consult a current copy of 10 CFR 2.714 which is available at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555 and at the local public document room located at the Dixon Public Library, 221 Hennepin Avenue, Dixon, Illinois 61021.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission.or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
1 As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity tbs interest of the petitioner in the I
proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1) the nature of the petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific
aspect (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted.
In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitior.er must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion.
Petitioner must provide sufficient information to show that a gcmtne dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
i
.=.
j j
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to preseni evidence and cross-examine witnesses.
If the amendment is issued before the expiration of the 30-day hearing period, the Commission will make a final determination on the issue of no significant hazards consideration.
If a hearing is requested, the final determination will serve to decide when the hearing is held.
If the final datermination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing.
Any hearing held would take place after issuance of tha amendment.
If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment.
t A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory l
Commission, Washington, DC 20555, Attention: Docketing and Services Branch, or may be delivered to the Commission's Public Document Room, the Gelman 1
Building, 2120 L Street, NW., Washington, DC 20555, by the above date. Where petitions are filed during the last 10 days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Western Union at 1-(800) 248-5100 (in Missouri 1-(800) 342-6700). The Western Union operator should be given Datagram Identification Number N1023 and the following message addressed to J. Dyer: petitioner's
name and telephone number, date petition was mailed, plant name, and publication date and page number of this FEDERAL REGISTER notirs A copy of the petition should also be sent to the Office of the General Counsel, U.S.
Nuclear Regulatory Commission, Washington, DC 20555, and to Michael I. Miller, Esquire; Sidley and Austin, One First National Plaza, Chicago, Illinois 60690, l
attorney for the licensee.
l l
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or.
request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(1)-(v) and 2.714(d).
For further details with respect to this action, see the application for amendment dated October 29, 1993, which is available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, N.W., Washington, D.C. 20555, and at the local public document room, located at the Dixon Public Library, 221 Hennepin Avenue, Dixon, Illinois 61021.
Dated at Rockville, Maryland, this 3rd day of November 1993.
FOR THE NUCLEAR REGULATORY COMMISSION h bl Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation i
g 3.
.. ~...
[+ ~ 94 UNITED STATES
~
o p
"{
NUCLEAR RE2ULATORY COMMISSION
]y
, g..
' WASHINGTON, D C.20$55
' DISTRIBUTION
/
LNovember'3,1993 Docket File.
CPatel m$ET No.
50-254-.
JStang y
- CMoore.
/
' Regulatory Publications Branch pg}_2 p/f. . imEMORANDUM FOR: Division of Freedom of information and Publications Services Oflice of Administration and Resources Management PDIII-2
- FROM:
. Office of Nuclear Reactor Regulation c.;usxct: C0m0NWEALTH EDISON COMP 2Y - QUAD CITIES HUCLEAR POM_R STATION One signed original of the Federaf R>gister Notice identified below is enclosed for your transmittal to the Office of the Federal - Register for publication. Additional conformed copies! S ) of the Notice are enclosed for your use. Notice of Receipt of Appilcation for Construction Permit (s)and Operating License (s). T Notice of Receipt of Partial Application for Construction Permit (s)and Facility License (s): Time for Submission of Views on Antitrust Matters. Notice of Consideration of lasuance of Amendment to Facility Operating License.(Call with_33 day insert dateh Notice of Receipt of Application for Facility License (s); Notice of Avaltability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility Ucense(s) and Notice of Opportunity for Hearing. Notice of AvaiLbility of NRC Draft /Fino Er.Aronmental Statement. Notice of Umited Work Authorizatio a. Notice of Availability of Safety Evaluation Report. Notice of lasuance of Construction Permit (s). Notice of Issuance of Facihty Operating Ucense(s) or Amendment (s). Order. Exemption. Notice of Granting Exemption. Environmental Assessment. Notice of Preparation of Environmental Assessment. O Receigi of esiiiion ior Di,ecio, s Decision under io CrR 2.20s. 1ssuance of Final Director's Decision Under 10 CFR 2.206. Other: Jar.As E. Dyer, Director, PDIII-2
Enclosure:
As stated contact: A. Christy llOcce
- Phonen 504-3100 6,..es d.L.A; D Il-2.
....... ~ ~ ouiwwe, Cf{ ore,,,,,
- b..../5../. 93.....
.. ~.. ~..' ode > . ~ ~ -. ~.. OFFICIAL RECORD COPY. _ . =ce noen sie noieo necu osso. ,}}