ML20059J428

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Corporate Emergency Response Plan Implementing Procedures Update, Including Rev 13 to 1.1,Rev 8 to 1.2,Rev 10 to 2.1,Rev 9 to 2.2 & Rev 5 to 3.1. W/931108 Release Memo
ML20059J428
Person / Time
Site: Diablo Canyon  
Issue date: 10/26/1993
From: Sexton J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059J436 List:
References
NUDOCS 9311120202
Download: ML20059J428 (2)


Text

,<Yi:-

Pacific Gas and Electric Company Natlear Regulatory Semces. A10A James A. Sexton 333 Marke! Street Manager PO Ba 770000 Nutiear Regu:atory Semtes San Fra,asco CA 9 177 415'973 2456 fas 315'973 007; October 26, 1993 PG&E Letter No. DCL-93-250 U.S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.

20555 Re:

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Corporate Emergency Response Plan Implementing Procedures Update Gentlemen:

PG&E is submitting one copy of this update to the detailed Implementing Procedures (Enclosure ?) for the Corporate Emergency Response Plan.

Concurrently, two copies of this update are being submitted to the NRC, Region V office, and one copy is being submitted to the NRC Resident Inspector.

The updated procedures contain privacy / proprietary information that is identified in Enclosure 1 and bracketed in Enclosure 2 in accordance with NRC Generic Letter 81-27.

Sincerely, s

Q James A. Sexton cc:

bbby H. Faulkenberry (2)

Ann P. Hodgdon (w/ Enc. 2 cover only)

Mary H. Miller Sheri R. Peterson (w/ Enc. 2 cover only)

Enclosures 6267S/85K/DDS/183 goy h

090034 a 9 9311[20202 931026 hDR ADOCK 05000275 PDR

~..

f

+$j@ Me og

  • f

- n UNITED STATES E

L E-NUCLEAR REGULATORY COMMISSION

[

WASHINGTON. D.C. 20555 o

%, *.. * /

i Novetber 8,1993 DOCKET N05. 50-275/50-323 MEMORANDUM FOR:

Chief, Document Control Branch, IRM l

FROM:

Director, Division of Freedom of Information and Publications Services, ADM-l i

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION I

i l

The Division of Freedom of Information and Publications Services a

has reviewed the attached document and has determined that it may now be made publicly available.

.i kdt<b (d77 Donnie H. Grimsley, Dir tor i

i Division of Freedom of Information and Publications Services Office of Administration a

1 i

i i

i