Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1981-019, Forwards LER 81-019/03L-0.Detailed Event Analysis Encl + (02:50:49, 17 December 2024)
- TXX-3540, Discusses Evaluation Re Possibility of Internally Generated Missiles in Safety Chilled Water Chiller Rooms 115A & 115B Per SER Confirmatory Issue 1.Condition Not Possible. Const of Missile Barrier Wall Not Necessary + (02:50:49, 17 December 2024)
- 05000272/LER-1981-058-04, /04L-0:on 810528,util Failed to Submit 1980 Radiological Rept by 810401 Per ETS 5.6.1.1.Caused by Personnel Error.Rept Submitted 810528 + (02:50:51, 17 December 2024)
- ML20063G478 + (02:50:52, 17 December 2024)
- 05000272/LER-1981-058, Forwards LER 81-058/04L-0.Detailed Event Analysis Encl + (02:50:53, 17 December 2024)
- ML20063G446 + (02:50:53, 17 December 2024)
- ML20063G409 + (02:50:54, 17 December 2024)
- 05000302/LER-1981-013-03, /03L-0:on 810302,during Routine Testing in Mode 5 Operation,Rcs Discovered W/Chloride Concentration of 0.18 Ppm.Caused by Release of Chlorides from Makeup. Procedures Will Be Revised by 810430 + (02:50:56, 17 December 2024)
- 05000302/LER-1981-013, Forwards LER 81-013/03L-0 + (02:50:57, 17 December 2024)
- ML20063G384 + (02:50:57, 17 December 2024)
- 05000318/LER-1981-016-03, /03L-0:on 810317,during Normal Power Operation, motor-operated Main Feedwater Isolation Valve 2-MOV-4517 Experienced Loss of Power When Main Circuit Breaker Ground Sensor Tripped.Caused by Personnel Error + (02:50:59, 17 December 2024)
- ML20063G335 + (02:51:00, 17 December 2024)
- ML20063G374 + (02:51:00, 17 December 2024)
- ML20063G324 + (02:51:01, 17 December 2024)
- ML20063G322 + (02:51:02, 17 December 2024)
- ML20063G321 + (02:51:02, 17 December 2024)
- ML20063G315 + (02:51:03, 17 December 2024)
- ML20063G318 + (02:51:03, 17 December 2024)
- ML20063G307 + (02:51:04, 17 December 2024)
- ML20063G304 + (02:51:05, 17 December 2024)
- ML20063G295 + (02:51:06, 17 December 2024)
- ML20063G282 + (02:51:07, 17 December 2024)
- ML20063G278 + (02:51:07, 17 December 2024)
- 05000461/LER-1993-007, :on 931220,discovered Incorrectly Positioned Steam Flow Control Valve Due to Operators Lack of Understanding of Design of Valves Controller Results in Saturated Ogs.Revised Sys Operating Procedure + (02:51:09, 17 December 2024)
- RC-94-0027, Monthly Operating Rept for Jan 1994 for VC Summer Nuclear Station + (02:51:10, 17 December 2024)
- ML20063G255 + (02:51:11, 17 December 2024)
- ML20063G231 + (02:51:12, 17 December 2024)
- ML20063G244 + (02:51:12, 17 December 2024)
- HL-4498, Forwards Monthly Operating Repts for Jan 1994 for Ei Hatch Nuclear Plant & Revised Pages E1-1a,E1-1b & E1-1c of Dec 1993 Monthly Operating Rept + (02:51:13, 17 December 2024)
- ML20063G217 + (02:51:13, 17 December 2024)
- ML20063G197 + (02:51:14, 17 December 2024)
- U-602252, Revised Unit Shutdown & Power Reductions for Dec 1993 + (02:51:14, 17 December 2024)
- ML20063G182 + (02:51:15, 17 December 2024)
- ML20063G180 + (02:51:16, 17 December 2024)
- JAFP-94-0097, Monthly Operating Rept for Jan 1994 for Ja FitzPatrick Nuclear Power Plant + (02:51:19, 17 December 2024)
- ML20063G163 + (02:51:20, 17 December 2024)
- ML20063G169 + (02:51:20, 17 December 2024)
- ML20063G162 + (02:51:22, 17 December 2024)
- ML20063G158 + (02:51:23, 17 December 2024)
- ML20063G152 + (02:51:23, 17 December 2024)
- ML20063G150 + (02:51:25, 17 December 2024)
- ML20063G136 + (02:51:26, 17 December 2024)
- ML20063G129 + (02:51:27, 17 December 2024)
- ML20063G127 + (02:51:27, 17 December 2024)
- AECM-82-349, Requests Postponement of Startup Test 1-C91-SU-13-0, Process Computer Until Appropriate Time Following non-nuclear Heatup But Prior to Exceeding 5% Power.Approval Requested by 820831 + (02:51:28, 17 December 2024)
- ML20063G126 + (02:51:28, 17 December 2024)
- ML20063G113 + (02:51:29, 17 December 2024)
- ML20063G098 + (02:51:30, 17 December 2024)
- BSEP-94-0042, Informs of Rev in Schedule for Completion of Liquid Penetrant Exam of Bsep,Unit 2 Core Spray Sys Sparger Bracket Welds & Seal Weld Application + (02:51:31, 17 December 2024)
- ML20063G096 + (02:51:31, 17 December 2024)
- ML20063G093 + (02:51:32, 17 December 2024)