MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
, ,
4 Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report January 1994 Table of Contents Pace Narrative Report El-1 Operating Data Report El-2 Average Daily Power level El-3 Unit Shutdowns and Power Reductions El-4
\
. . IIIA498 9402150362.940200 PDR ADOCK 05000321 R PDR ..a
. . j i
PLANT E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: FEBRUARY 1, 1994 NARRATIVE REPORT COMPLETED BY: T. W. TIDWELL TELEPHONE: (912) 367-7781 x2878 JANUARY I 0000 Shift continued activities associated with repairing the steam leak on Reheat Steam High Load Valve IN38-F103B.
JANUARY 1 0230 Repair work on valve IN38-F103B was completed, and Shift began ascension to rated thermal power.
JANUARY 1 0508 Rated thermal power was attained. .
JANUARY 15 2320 Shift began reducing load to approximately 600 GMWe to perform Turbine Control Valve and Turbine Bypass Valve festing.
JANUARY 16 0033 Shift began ascension to rated thermal power.
JANUARY 16 0137 Rated thermal power was attained. ,
JANUARY 31 2400 Shift continued to maintain rated thermal power.
l I
i l
El-1
E L.. .
OPERATING DATA REPORT DOCKET NO.: 50-321 DATE: FEBRUARY 1, 1994 COMPLETED.BY: T. W. TIDWELL TELEPHONE: (912) 367-7781 x2878 -:
OPERATING STATUS :
- 1. UNIT NAME: E. I. HATCH - UNIT ONE
- 2. REPORT PERIOD: JANUARY 1994
- 3. LICENSED THERMAL POWER (MWt : 2436
- 4. NAMEPLATE RATING (GROSS MWe : 850
- 5. DESIGN ELECTRICAL RATING (N T MWe): 776.3
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 774
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 741
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES Maximum Dependable Capacities for 1994 are 774 MWe (Gross) and 741 MWe (Net).
Southern Company Services, Inc. determined the values using 1993 operational data.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE ,
- 11. HOURS IN REPORTING PERIOD: 744.0 744 158543 .
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 744.0 118747.4
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 744.0 744.0' 113700.6-
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0-
- 16. GROSS THERMAL ENERGY GENERATED (MWHt): 1806437 1806437 254914971
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHe): 585010 585010 81929340
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 560789 560789 77951283
- 19. UNIT SERVICE FACTOR: 100.0% 100.0% 71.7%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 71.7%
- 21. UNIT CAPACITY FACTOR USING MDC NET): 101.7% 101.7% 65.7%-
- 22. UNIT CAPACITY FACTOR USING DER NET): 97.1% 97.1% 63.1%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 0.0% 11.8%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A 25.'IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A r
i El-2 l 0
l
i
.i t
PLANT-E. I. HATCH - UNIT ONE DOCKET NO.: 50-321 DATE: FEBRUARY 1, 1994 AVERAGE DAILY POWER LEVEL COMPLETED BY: T. W. TIDWELL ,
TELEPHONE: (912) 367-7781 x2878 DAY Net MWe l i
1 .............. 719 2 .............. 754 ,
3 .............. 753 ;
4 .............. 756 5 .............. 759 !
6 .............. 757 l 7 .............. 750 8 .............. 756 9 ............... 757 -
10 .............. 758 11 .............. 756 ~
12 .............. 753 !
13 .............. 756 14 .............. 756 r 15 .............. 749 16 .............. 757 .
17 .............. 753 ,
18 .............. 756 19 .............. 754 ,
20 .............. 756 l 21 .............. 757 .
22 .............. 757 !
23 .............. 759 J 24 .............. 756 25 .............. 754 26 .............. 752 ;
27 .............. 752 28 .............. 748 ,
29 .............. 754 !
30 ........ ..... 756 31 .............. 756 !
t 6
h J
1 El-3 .i i l
I i
(-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0.: 50-321 DATE: FEBRUARY I, 1994 UNIT NAME: E. I. HATCH - UNIT ONE COMPLETED BY: T. W. TIDWELL TELEPHONE: (912) 367-7781 x2878 REPORT MONTH: JANUARY 1994 R H S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE No significant power reductions occurred this month.
f TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE i' A GREATER THAN 20%
F-FORCED A-EQUIPMENT. FAILURE (EXPLAIN) I-MANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL SCRAM DAILY POWER LEVEL FOR ,
C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION ,
F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN) j EI-4 !
l 1
k Enclosure 2 i
Plant Hatch Unit 2 Monthly Operating Report +
Januwv1994 Table of Contents
?
Pace Narrative Report E2-la Operating Data Report E2-2 Average Daily Power level E2-3 Unit Shutdowns and Power Reductions E2-4 I
~
.I i
l i
I i
l I!1A498 0 @ 005 -
I PLANT E. I. HATCH - UNIT TWO DOCKET N0: 50-366 3 DATE: FEBRUARY 1, 1994 ;
NARRATIVE REPORT COMPLETED BY: T. W. TIDWELL TELEPHONE: (912) 367-7781 x2878 JANUARY l 0000 Shift continued to maintain approximately 670 GMWe to monitor offgas activity and fuel performance.
JANUARY l 2218 ShiftbegodExercise.an Control reducing load to approximately 620 GMWe to perform a -!
JANUARY 2 0016 Shift began ascension to 85% of rated thermal power. !
JANUARY 2 0335 The unit attained 85% of rated thermal power with unit load at approximately 680 GMWe.
JANUARY 9 0114 Shift began reducing load to approximately 620 GMWe to perform a-Control Rod Exercise.
JANUARY 9 0245 Shift began ascension to 85% of rated thermal power.
JANUARY 9 0550 The unit attained 85% of rated thermal power with unit load at approximately 680 GMWe.
JANUARY 13 1252 Shift began reducing load to approximately 470 GMWe to minimize increasing offgas release rates and monitor fuel performance.
JANUARY 14 1400 Shift began reducing load to approximately 390 GMWe by. inserting ;
control rods to further minimize offgas release rates and facilitate i Flux Tilt Testing. j JANUARY 20 1143 Analysis performed on data obtained during Flux Tilt Testing did not identify any new fuel leaks. Per management decision, shift began ascension to approximately 75% of rated thermal power to monitor offgas release rates and fuel performance.
JANUARY 21 0530 The unit attained 75% of rated thermal power with unit load at approximately 600 GMWe. '
JANUARY 22 2112 Shift began reducing load to approximately 500 GMWe to Turbine Control Valve and Turbine Bypass Valve Testing. perform JANUARY 22 2230 Shift began ascension to approximately 550 GMWe to perform a Control Rod Exercise. )
JANUARY 23 0158 Shift began ascension to 75% of rated thermal power.
~ JANUARY 23 0602 The unit attained 75% of rated thermal power with unit load at approximately 600 GMWe.
E2-la q
. )
J i
PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 DATE: FEBRUARY 1, 1994 NARRATIVE REPORT COMPLETED BY: T. W. TIDWELL TELEPHONE: (912) 367-7781 x2878 JANUARY 26 1728 Shift began reducing load to approximately 550 GMWe, per management i direction to minimize increasing offgas release rates and monitor. :
fuel performance.
JANUARY 26 1752 The unit attained 70% of rated thermal power with unit load at approximately 550 GMWe.
. JANUARY 30 0130 Shift began reducing load to approximately 500 GMWe to perform a.
Control Rod Exercise.
JANUARY 30 0325 Shift began ascension to 70% of rated thermal power.
JANUARY 30 0600 The unit attained 70% of rated thermal power with unit load at approximately 550 GMWe. ,
JANUARY 31 2400 Shift continued to maintain approximately 550 GMWe to monitor offgas activity and fuel performance.
P f
k i
E2-lb t
)
OPERATING DATA REPORT DOCKET NO: 50-366-DATE: FEBRUARY 1, 1994 COMPLETED BY: T. W. TIDWELL OPERATING STATUS:
- 1. UNIT NAME: E. I. HATCH - UNIT TWO-
- 2. REPORTING PERIOD: JANUARY 1994
- 3. LICENSED THERMAL POWER MWt : 2436
- 4. NAMEPLATE RATING (GROSS (MWe : 850
- 5. DESIGN ELECTRICAL RATING N T MWe : 784
- 6. MAXIMUM DEPENDABLE CAPACI Y GROS MWe): 798
- 7. MAXIMUM DEPENDABLE CAPACITY NET MWe 765
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS):
SINCE LAST REPORT, GIVE REASONS: NO CHANGES (IlEMS 3 THROUGH Maximum Depen 7)dable Capacities for 1994 are 798 MWe (Gross) and 765 M Southern Company Services, Inc. determined the values usin 1993 operational data.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRI TIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 744 126169
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 744.0 96484.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
-14. HOURS GENERATOR ON LINE: 744.0 744.0 92970.0
~15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 1330586 1330586 204802461
- 16. GROSS THERMAL ENERGY GENERATED (MWHt)He):
- 17. GROSS ELECTRICAL ENERGY GENERATED (MW 433220 433220- 67047960
- 18. NET ELECTRICAL ENERGY GENERATED (MWHe): 411265 411265 63845956
- 19. UNIT SERVICE FACTOR: 100.0% 100.0% 73.7%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 73.7%
- 21. UNIT CAPACITY FACTOR USING MDC NET : 72.3% 72.3% 66.2%
- 22. UNIT CAPACITY FACTOR USING DER NET : 70.5% 70.5% 64.5%
- 23. UNIT FORCED OUTAGE RA E: 0.0% 0.0% 7.4%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
60 Day Refuelin Outage tentatively scheduled for March 16, 1994.
- 25. IF SHUTDOWN AT END 0 REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E2-2
~ * *
. .i 1
l PLANT E. I. HATCH - UNIT TWO DOCKET NO: 50-366 !
DATE: FEBRUARY 1, 1994 ,
AVERAGE DAILY POWER LEVEL COMPLETED BY: T. W. TIDWELL 'l
' TELEPHONE: (912) 367-7781 x2878 l JANUARY 1994 !
DAY Net MWe 1 .............. 652 2 .............. 656 3 .............. 655 658 4 ..............
5 .............. 658-6 .............. 659 7 .............. 655 8 .............. 658 9 .............. 654 -
10 .............. 655 11 .............. 657 12 .............. 654 13 .............. 554 14 . ............ 434 ;
15 ........ ..... 374 ;
16 .............. 373 ;
17 .............. 372 -
18 .............. 371 -
19 .............. 376 20 .............. 451 21 .............. 568 22 .............. 554 .
23 ............. 563 24 .............. 563 25 .............. 563 26 .............. 549 27 .............. 521 !
28 .............. 518 !
29 .............. 521 'l-30 .............. 517 31 .............. 523 I
4 9
E2-3 ,
^^
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0: 50-366 DATE: FEBRUARY 1, 1994-UNIT NAME:- E. I. HATCH - UNIT TWO COMPLETED BY: T. W. TIDWELL TELEP'ONE: (912) 367-7781 x2878 REPORT MONTH: JANUARY 1994 R H S E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE 94-001 940114 S 0.0 B 5 N/A RC FUELXX Unit load was reduced'to approximately 470 GMWe to minimize offgas release rates and facilitate Flux Tilt i Testing. Analysis performed on data obtained during Flux Tilt Testing did not identify any new leaks. Per management decision, power was increased to approximately 75% of rated thermal- power, . instead of 85%
of rated thermal power to minimize offgas release rates and monitor fuel performance.
s TYPE: REASON: METHOD: EVENTS REPORTED INVOLVE A GREATER THAN 20%
F-FORCED 'A-EQUIPMENT FAILURE (EXPLAIN) 1-HANUAL REDUCTION IN AVERAGE S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL' SCRAM DAILY POWER LEVEL FOR C-REFUELING 3-AUTOMATIC SCRAM THE PRECEDING 24 HOURS.
D-REGULATORY RESTRICTION 4-CONTINUATIONS E-0PERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9-0THER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
E2-4