Monthly Operating Rept for Jan 1994 for Clinton Power Station
ML20063G197
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/31/1994
From: Hollon M
ILLINOIS POWER CO.
To:
Shared Package
ML20063G187 List:
References
U-602252, NUDOCS 9402150357
Download: ML20063G197 (4)


Text

, . . . - .

, y ,

y Attachment 1

~

to U-602252 Page 1 of'4' ,

i tt CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES ,

Month January 1994 ,

a L

None l

l l

r

.i I

r l

k 9402150357 940207 I PDR ADDCK 05000461 [d t

R PDR f;I i

6 i

L '

l Attachment'1 -

.. to U-602252 Li

[ -

Page 2 of 4 I o i AVERAGE ~ DAILY UNIT POWER LEVEL l

DOCKET NO. 50-461  ;

UNIT Clinton 1 DATE 01/31/94 j COMPLETED BY M. C. Hollon-

TELEPHONE (217) 935-8881 X3537 MONTH January 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 839 17 925 2 918 18 924 3 923 19 924 4 924 20 923 5 925 21 925 6 926 22 926 7 923 23 924 8 922 24 924 9 926 25 925 10 925 26 924 11 926 27 924 12 927 28 925 13 922 27 926 14 924 30 894 I' 15 922 31~ 922

!c 16 922 f

h.;

}/

.. .s.. .

I .\ ,; > , L!

Attachment 1

't

, to U-602252 Page 3 of 4 i i

OPERATINC DATA REPORT '

DOCKET NO. 50-461 f

UNIT Clinton 1 ] ,

DATE _pl/31/94  ;

COMPLETEDLBY M. C.'Hollon l TELEPHONE (217) 935-8881 X3537 g OPERATING STATUS '

1. REPORTING PERIOD: January 1994 GROSS HOURS IN REPORTING PERIOD: 744 ,.
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 28.2.4_ ]

MAX. DEPEND. CAPACITY (MDC) (MVe-Net): 930 l i

DESIGN ELECTRICAL RATING (MWe-Net): 231 3 .' POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None '!

4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE -,
5. NUMBER OF HOURS REACTOR WAS CRITICAL... 744.0 744.0 38.187.6: l l
6. REACTOR RESERVE SHUTDOWN HOURS......... 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE................ 744,0 '744.0 36.950.1

-j

8. UNIT RESERVE SHUTDOWN HOURS.. ......... 0.0 0.0 -4.0 .j
9. . CROSS THERMAL ENERGY GENERATED (MWH)... 2.151.865 2.151.865 97.209.200 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 713.386- 713.386 -32.132.250
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 684.738 684.738' 30.550.581
12. REACTOR SERVICE FACTOR...... .......... 100.01 100.0%. 70.4%
13. REACTOR AVAILABILITY FACTOR............ 100.0% 100.0%- 70.4%
14. ' UNIT SERVICE FACTOR.................... 100.0% 100.0%- 68.1%'  !
15. UNIT AVAILABILITY FACTOR............... 100.0% 100.0%- 68.1%
16. UNIT CAPACITY FACTOR (Using MDC)....... 99.0% 99.0% 60.6%-
17. UNIT CAPACITY FACTOR (Using Design MWe) 98.6% 98.6% 60.4% l
18. UNIT FORCED OUTAGE RATE................ 0.0% 0.0% 10.9%

l l

1

19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF.EACH): 'l None ,
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA  !

. _.,m . - .. .., ,.m.. .- ,

Attachment 1

  • Page 4 of 4 .

UNIT SHUTDOWNS AND POWER REDUCTIONS ~

DOCKET NO. 50-461 UNIT Clinton 1 DATE 01/31/94 COMPLETED BY M. C. Hollon REPORT MONTH January 1994 TELEPHONE J217) 935-8881 X3537 '

METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ,

. NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS None (1) Reason

'A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain), <

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

_ _ _ _ _ . . _ _ _ _ . . . _ - . - . . . . - . _ . - . . , -, - - u .- - a... . . . - -u . - _ . - - . . . . _ . . . - _ - _ - - . _ _ ~ _ _ . ~ . _ . . - . . . . _ _ _ . . . . . . _ - . _ . _ .