ML20063G197
| ML20063G197 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/31/1994 |
| From: | Hollon M ILLINOIS POWER CO. |
| To: | |
| Shared Package | |
| ML20063G187 | List: |
| References | |
| U-602252, NUDOCS 9402150357 | |
| Download: ML20063G197 (4) | |
Text
,
, y y
to U-602252
~
Page 1 of'4' i
tt CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month January 1994 a
L None l
l l
r
.i I
r l
k
[d I
9402150357 940207 PDR ADDCK 05000461 t
R PDR f;I i
6 i
L l
Attachment'1 to U-602252 Li
[
Page 2 of 4 I
I i
o AVERAGE ~ DAILY UNIT POWER LEVEL l
DOCKET NO.
50-461 UNIT Clinton 1 DATE 01/31/94 j
COMPLETED BY M. C. Hollon-TELEPHONE (217) 935-8881 X3537 MONTH January 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 839 17 925 2
918 18 924 3
923 19 924 4
924 20 923 5
925 21 925 6
926 22 926 7
923 23 924 8
922 24 924 9
926 25 925 10 925 26 924 11 926 27 924 12 927 28 925 13 922 27 926 14 924 30 894 I'
15 922 31~
922
!c 16 922 f
h.;
}/
.s..
L!
I.\\,;
't to U-602252 Page 3 of 4 i
i OPERATINC DATA REPORT f
DOCKET NO.
50-461 UNIT Clinton 1
]
DATE _pl/31/94 COMPLETEDLBY M. C.'Hollon l
TELEPHONE (217) 935-8881 X3537 g
OPERATING STATUS 1.
REPORTING PERIOD:
January 1994 GROSS HOURS IN REPORTING PERIOD: 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 28.2.4_
]
MAX. DEPEND. CAPACITY (MDC) (MVe-Net): 930 l
i DESIGN ELECTRICAL RATING (MWe-Net): 231 3.'
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4.
REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...
744.0 744.0 38.187.6:
l l
6.
REACTOR RESERVE SHUTDOWN HOURS.........
0.0 0.0 0.0 7.
HOURS GENERATOR ON LINE................
744,0
'744.0 36.950.1
-j 8.
UNIT RESERVE SHUTDOWN HOURS..
0.0 0.0
-4.0
.j 9.
. CROSS THERMAL ENERGY GENERATED (MWH)... 2.151.865 2.151.865 97.209.200 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 713.386-713.386
-32.132.250 11.
NET ELECTRICAL ENERGY GENERATED (MWH)..
684.738 684.738' 30.550.581 12.
REACTOR SERVICE FACTOR......
100.01 100.0%.
70.4%
13.
REACTOR AVAILABILITY FACTOR............
100.0%
100.0%-
70.4%
- 14. ' UNIT SERVICE FACTOR....................
100.0%
100.0%-
68.1%'
15.
UNIT AVAILABILITY FACTOR...............
100.0%
100.0%-
68.1%
16.
UNIT CAPACITY FACTOR (Using MDC).......
99.0%
99.0%
60.6%-
17.
UNIT CAPACITY FACTOR (Using Design MWe) 98.6%
98.6%
60.4%
18.
UNIT FORCED OUTAGE RATE................
0.0%
0.0%
10.9%
l 1
19.
SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF.EACH):
'l None 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA
_.,m
,.m..
to U-602252 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461
~
UNIT Clinton 1 DATE 01/31/94 COMPLETED BY M. C. Hollon TELEPHONE J217) 935-8881 X3537 REPORT MONTH January 1994 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE
. NO.
DATE S: SCHEDULED (HOURS)
REASON (1)
REDUCING POWER (2) ACTIONS / COMMENTS None (1) Reason
'A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),
H-Other (explain)
(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)
_ _ _ _ _.. _ _ _ _... _ -. -.... -. _. -.., -, - - u.- -
a...
-u
~
. ~.
.