Text

,

, y y

to U-602252

~

Page 1 of'4' i

tt CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month January 1994 a

L None l

l l

r

.i I

r l

k

[d I

9402150357 940207 PDR ADDCK 05000461 t

R PDR f;I i

6 i

L l

Attachment'1 to U-602252 Li

[

Page 2 of 4 I

I i

o AVERAGE ~ DAILY UNIT POWER LEVEL l

DOCKET NO.

50-461 UNIT Clinton 1 DATE 01/31/94 j

COMPLETED BY M. C. Hollon-TELEPHONE (217) 935-8881 X3537 MONTH January 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 839 17 925 2

918 18 924 3

923 19 924 4

924 20 923 5

925 21 925 6

926 22 926 7

923 23 924 8

922 24 924 9

926 25 925 10 925 26 924 11 926 27 924 12 927 28 925 13 922 27 926 14 924 30 894 I'

15 922 31~

922

!c 16 922 f

h.;

}/

.s..

L!

I.\\,;

't to U-602252 Page 3 of 4 i

i OPERATINC DATA REPORT f

DOCKET NO.

50-461 UNIT Clinton 1

]

DATE _pl/31/94 COMPLETEDLBY M. C.'Hollon l

TELEPHONE (217) 935-8881 X3537 g

OPERATING STATUS 1.

REPORTING PERIOD:

January 1994 GROSS HOURS IN REPORTING PERIOD: 744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 28.2.4_

]

MAX. DEPEND. CAPACITY (MDC) (MVe-Net): 930 l

i DESIGN ELECTRICAL RATING (MWe-Net): 231 3.'

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None 4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL...

744.0 744.0 38.187.6:

l l

6.

REACTOR RESERVE SHUTDOWN HOURS.........

0.0 0.0 0.0 7.

HOURS GENERATOR ON LINE................

744,0

'744.0 36.950.1

-j 8.

UNIT RESERVE SHUTDOWN HOURS..

0.0 0.0

-4.0

.j 9.

. CROSS THERMAL ENERGY GENERATED (MWH)... 2.151.865 2.151.865 97.209.200 10 GROSS ELECTRICAL ENERGY GENERATED (MWH) 713.386-713.386

-32.132.250 11.

NET ELECTRICAL ENERGY GENERATED (MWH)..

684.738 684.738' 30.550.581 12.

REACTOR SERVICE FACTOR......

100.01 100.0%.

70.4%

13.

REACTOR AVAILABILITY FACTOR............

100.0%

100.0%-

70.4%

14. ' UNIT SERVICE FACTOR....................

100.0%

100.0%-

68.1%'

15.

UNIT AVAILABILITY FACTOR...............

100.0%

100.0%-

68.1%

16.

UNIT CAPACITY FACTOR (Using MDC).......

99.0%

99.0%

60.6%-

17.

UNIT CAPACITY FACTOR (Using Design MWe) 98.6%

98.6%

60.4%

18.

UNIT FORCED OUTAGE RATE................

0.0%

0.0%

10.9%

l 1

19.

SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF.EACH):

'l None 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA

_.,m

,.m..

to U-602252 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461

~

UNIT Clinton 1 DATE 01/31/94 COMPLETED BY M. C. Hollon TELEPHONE J217) 935-8881 X3537 REPORT MONTH January 1994 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE

. NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2) ACTIONS / COMMENTS None (1) Reason

'A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

_ _ _ _ _.. _ _ _ _... _ -. -.... -. _. -.., -, - - u.- -

a...

-u

~

. ~.

.