ML20063G255
| ML20063G255 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/31/1994 |
| From: | Reid D, Wallin G VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BVY-94-16, VY-RCE-94-003, VY-RCE-94-3, NUDOCS 9402150375 | |
| Download: ML20063G255 (6) | |
Text
M*
Y VURMONT YANKEE
.o.
NUCLEAR POWER CORPORATION Th,
P.O. Box 157, Governor Hunt Road
//Wj' \\)
Vernon, Vermont 05354-0157
'- lj*M, /
., V, '
(802) 257-7711
--9. -)
February 10,1994 VY-RCE-94-003 BVY 94-16 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn:
Document Control Desk
Reference:
a)
License No. DPR-28 (Docket No. 50-271)
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vennont Yankee Nuclear Power Station for the month of Januarv.1994.
Very tmly yours, Vennont Yankee Nuclear Power Corp.
c
-vh h)'*
Donald A. Reid Vice President, Operations cc:
USNRC, Region I USNRC Resident Inspector, VYNPS i
{ 00 il *. 2
/
m
/ r 9402150375 940131 iJ DR ADOCK 0500 1
j k
e j
-i
?
i I
1 VERMONT YANKEE NUCLEAR POWER STATION MONTIILY STATISTICAL REPORT 94-01
^
FOR TIIE MONTII OF JANUARY 1994
' t e
i b
DP 041l~ Rev. 5 Page1 of1 I
- I w
w s
e-e-4 w
w
_ - - -i, e-
+
~ OPERATING-DATA REPORT f
DOCKET NO.50-271 l
DATE-940210 COMPLETED BY G.A.
WALLIN Ll TELEPHONE (802)257-7711' l
OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
'2.. Reporting Period:
Januarv NOTES:
- 3. Licensed Thermal Power (MWt):1593 i
- 4. Nameplate Rating (Gross MWe) : E40
- 5. Design Electrical Rating (Net MWe):
514 (oc) 504(cc)
- 6. Maximum Dependable Capacity (Gross MWe) :
535_-
- 7. Maximum Dependable Capacity (Net MWe):
524
.i last report, give reasons:
y 8.
If changes, occur in capacity ratings-(Items Number 3 through 7) sinca
}
'N/A 3
9.
Power level.to which restricted, if any(Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumulative-
~11.
Hours in Reporting Period 744.00 744.00 185568.00o
- 12. Number Of Hours Reactor was Critical 744.00 744.00' 151961.43J q
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator-On-Line-744.00'
'744.00 148859.62
- 15. Unit. Reserve Shutdown Hours 0.00
'O.00
-0.00 1
- 16. Gross Thermal Energy Generated (MWH) 1181990.00 1181990.00'221887661.50
- 17. Gross Electrical Energy Generated 401169.00 401169.00' 73920551.00
- 18. Net Electrical Energy Generated (MWH) 385670.00 385670.00 '70232694.00 i
- 19. Unit Service Factor-100.00 100.00
-79.49.
j
- 20. Unit Availability Factor 100.00-100.00-
'79.49
?
- 21. Unit Capacity Factor (Using MDC Net) 102.85 102.85 74.41-j
- 22. Unit. Capacity Factor (Using DER Net)-
100.85 100.85 72.96'
- 23. Unit Forced Outage Rate 0.00 0.00 5.15 j
- 24. Shutdowns scheduled over next'6 months (Typei Date,.and Duration of.
1l Each:
N/A 7
~.1
- 25. If shut down at end of report period,. estimated 1date of startup:N/A' l
- 26. Units In. Test Status (prior to~ commercial operation): N/A l
Forecast Achieved-INITIAL CRITICALITY ci INITIAL ELECTRICITY
-COMMERCIAL OPERATION VYDPF 0411.01
..'DP 0411 Rev. 5
'Page 1 of 1 i
=RT_No. 13.F01.19F
.}
)
t
- j
~, :-
.a
.1 m
[
AVERAGE DAILY UNIT POWER LEVEL
.4-DOCKET NO. 50-271
[
UNIT Vermont Yankee.
t DATE 940210 COMPLETED BY G.A.
WALLIN TELEPHONE (802)257-7711 MONTH Janua ry
' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
520 17.
51 2.
519 18.
521 i
3.
519 19.
519
-4.
519 20.
519
- i t
5.
519 21.
520 i
6.
519 22.
520 7.
519 23.
519 l
8.
520 24.
520 9.
490 25.
520
~
10.
519 26.
520 11.
519 27.
519 12.
519 28.
519
- i 13.
519 29.
520 l
14.
519 30.
519 15.
519 31.
519 i
V 16.
518 INSTRUCTIONS.
On this format, list the average daily unit power level in MWE-Net
{
for-each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 j
DP 0411 Rev. 5 l
Page 1 of 1 I
- RT No. 13.F01.18V
~
a a
e w
-mems e
UNIT SHUTDOWNS AND POWER REDUCTIONS i
REPORT MONTH JANUARY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 940210 COMPLETED BY G.A.
Wallin -
TELEPHONE (802)257-7711 1
2 3
4 5
t No.
Date Type Duration Reason Method of License System Component Cause and Corrective (hours)
Shutting Event Code Code Action to Prevent Down Report #
Recurrence Reactor 94-01 940109 S
0.00 H*
4 N/A RB CONROD MSIV testing, and a-Power Rod Pattern Exchange Reduction 1
F: Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of. Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License C-Refueling 3 - Automatic Scram Event Report (LER) File D-Regulatory Restriction 4 - Other (Explain)
E-Operator Training and 4
License Examination 5 Exhibit I - Same Source
- VYDPF 0411.03 F-Administrative DP 0411 Rev. 5 G-Operational Error (Explain)
Page 1 of 1
- H-(Explain) - Control Rod Pattern Exchange
?
I i
]
a DOCKET.NO. 50-271 c1*
DATE 940210 i
COMPLETED BY G.A.-WALLIN
' TELEPHONE. (802)257-7711 REPORT MONTH
'Januarv
SUMMARY
OF OPERATING EXPEEJENCES Highlights
. Vermont Yankee _ operated at 99.7% of rated thermal power for the. month.
Gross electrical generation.was 401.169 MWHe or 99.9% design electrical-f capacity.
1 i
Operating Summary
-The following is a chronological description of-plant operations including-other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating'at 99.9%.
of rated thermal power.
940109 At 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, initiated a power reduction to minimum recirculation flow to perform surveillance, and a rod pattern exchange.
' (See Unit'
' Shutdowns and Power' Reductions) 1 940109 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, initiated MSIV testing.
-940109 At 0207 hours0.0024 days <br />0.0575 hours <br />3.422619e-4 weeks <br />7.87635e-5 months <br />, completed MSIV testing.
940109 At 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br />, at 65% power initiated'a control rod pattern exchange.
940109 At 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br />, completed the control rod pattern exchange.
-940109 At 0405 hours0.00469 days <br />0.113 hours <br />6.696429e-4 weeks <br />1.541025e-4 months <br />, began a return to full power.
i'(
- I N
)
i
)
,~
At the end of the reporting period the plant was operating-at 99.9% of rated thermal' power.