Text
Cmorg a Power Comrany
- 40) trweme s Cent.-fr F #aaf Pot:t Oma! B;.=
6 7 6 mmya ti A atsc3 3[ 'O f le ec = ne ;05 677 712' Georgia Power C. K. McCoy V(e Pres-root Nu ear y;yg y pr e; f?vc % %rh Um toc y ys!c\\rn February 11, 1994 LCV-0295 Docket Nos. 50-424 50-425 U.S.Nuc..
.egulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
V(
J ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORl Enclosed are the January 1994 monthly operating re;) orts for Vogtle Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
{
Sincerely, C. K. McCoy CKM/JLUgmb Enclosure cc: OmrgiLPower Compar!y Mr. J. B. Beasley, Jr.
Mr M. Sheibani NORMS U. S. Nuglear Reculatory Conujdqu Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle
< cr n n.-,
9402150343 940131 PDR ADOCK 05000424 R
[bN
~
slo
4 t
ENCLOSURE 1 i
t VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JANUARY 1994 TABLE OF CONTENTS NARRATIVE REPORT Page VI-l OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 i
k i
f 4
6
I r
i
.i I
NARRATIVE REPORT DOCKET NO. 50-424 I
UNIT 1 DATE:
FEBRUARY 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:'
(706) 826-4104 l
JANUARY 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
JANUARY 24 09:47 UNIT 1 BEGAN DERATE TO 97, POWER FOR MSR "B" AND *D" OUTAGE.
JANUARY 27 05:00 - UNIT 1 REl URNED TO 100% POWER.
i
' JANUARY 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
t P
+
l l
t t
t i
t (1
.t 1
'i f
V1-1 i
i i
- I f
~
.... ?
I 4
OPERATING DATA REPORT DOCKET NO. 50-424 i
DATE:
FEBRUARY 1,1994
-)
COMPLETED BY: G. L' HOOPER TELEPHONE:
(706) 826-4104
]
OPERATING STATUS j
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD
JANUARY 1994 l
~ 3. LICENSED THERMAL POWER (MWt):
3565 1
- 4. NAMEPLATE RATING (GROSS MWe):
1215 1
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169 *
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1217 *
}
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1163 *
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: ITEMS NOTED BY AN ASTERISK WERE CHANGED AS A RESULT OF UNIT PERFORMANCE TESTING COMPLETED DURING'1993, i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE l
- 11. HOURS IN REPORTING PERIOD:
744 744 58489
[
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 744.0 50619.1.
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
744.0 744.0 49616.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2639758-2639758 166360956 l
17, GROSS ELEC. ENERGY GENERATED (MWH):
913378 913378 55896340
- 18. NET ELEC. ENERGY GENERATED (MWH):
874448 874448 53115740 l
- 19. REACTOR SERVICE FACTOR 100.0 %
100.0 %
86.5 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
100.0 %
86.5%'
j
- 21. UNIT SERVICE FACTOR:
100.0 %
100.0 %
84.8 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
100.0 %
84.8 %
.l
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
101.1 %
_101.1 %
82.7%
_7
- 24. UNIT CAPACITY FACTOR (USING DER NET):
100.5 %
100.5 %
82.0%%
i
- 25. UNIT FORCED OUTAGE RATE:
. 0 0%
0.0%
5.5%
1
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURAT!ON OF EACH):
'{
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A f
k t
f V1-2 i
..i - -
-~
---e-
+
~
i
)
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
FEBRUARY 1,1994 i
COMPLETED BY: G. L. HOOPER TELEPHONE:
-(706) 826-4104 i
DAY Net MW 1.
1182
- l 2.
1180
- 3..
1178
- 4.
1180
- 5.
1180
- 6.
1180
- i 7.
1172.*
i 8.
1179 * ~
t f
9.
1177
- 10.
1181 *
- 11..
1182
- l 12.
1175
- 13.
1179
- 14.
1180 *
[
15.
1181
- 16.
1182
- 17.
1179 *
-l 18.
1181
- 19.
- 1178
- 20.
1181*
j 21.
1182
- 22.
1182
- 23.
1182
- 24.
1158 l
25.
1136 26.
1132 i
27.
1171
- 28.
1171
- 29.
1179
- 30.
1178 *
- 31.,
1181 *
'l V1-3
-M
=
--'-w T-r"*
7 e
. ~...
s j
- UNIT SHUTDOWNS AND POW $R REDUCTIONS DOCKET NO. 50-424 DATE:
FEBRUARY 1,-1994 I
UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH JANUARY 1994
- l R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED
. CODE-ACTION TO
' NO.
DATE E
(HOURS)
N D-NUMBER ME (SUBCODE)
PREVENT RECURRENCE NA NA NA-NA NA NA NA NA' NA NA~
l a
F; FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV '
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE.
l C-REFUELING 3-AUTO. SCRAM DAILY POWER LEVEL FOR l
D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION I
F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
}
H-OTHER (EXPLAIN)-
f 4
1
- I-;
~
1 V1-4 i
.j
'1
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2.
MONTHLY OPERATING REPORT FOR JANUARY 1994 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4
. NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
FEBRUARY 1,1994 l
COMPLETED BY: G L. HOOPER l
TELEPHONE:
-(706) 826-4104 l
JANUARY 01 00.00 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS.
-JANUARY 07 22:53 UNIT 2 AUTOMATIC TURBINE TRIP / REACTOR TRIP CAUSED BY SWITCHYARD BREAKER TRIP.
JANUARY 08 09:52 UNIT 2 IN MODE 2.
JANUARY 08 11:00 UNIT 2 REACTOR CRITICAL.
JANUARY 08 13:25 UNIT 2 IN MODE 1.
.l JANUARY 08 22:21 UNIT 2 GENERATOR TIED TO GRID.
JANUARY 10 03:30 UNIT 2 RETURNED TO 100% POWER.
JANUARY 19 09:40 UNIT 2 AUTOMATIC TURBINE TRIP / REACTOR TRIP CAUSED BY MOISTURE SEPARATOR REHEATER Hi-HI LEVEL.
JANUARY 19 21:37 UNIT 2 IN MODE 2.
JANUARY 19 22:46 UNIT 2 REACTOR CRITICAL.
JANUARY 20 02:20 UNIT 2 IN MODE 1.
f JANUARY 20 05:30 UNIT 2 GENERATOR TIED TO GRID.
JANUARY 21 14:00 UNIT 2 RETURNED TO 100% POWER.
JANUARY 31 23:59 UNIT 2 AT 100% POWER, NO OPERATIONAL PROBLEMS.
t F
l
.t n
e v
f i
I V2-1
- q
1.
4 L
- i y
l OPERATING DATA REPORT DOCKET NO. 50,25
't DATE:
FEBRUARY 1,-1994 COMPLETED BY: G. L.~ HOOPER.
]
TELEPHONE:
(706) 826-4104 i
e l
OPERATING STATUS I-
- 1. UNIT NAME:
, VEGP UNIT 2 j
- 2. REPORT PERIOD:
JANUARY 1994 '
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
' 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1217 *
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1163
- i l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS l
(ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: ITEMS NOTED BY AN ASTERISK l
WERE CHANGED AS A RESULT OF UNIT PERFORMANCE TESTING COMPLETED DURING 1993.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
' 10, REASONS FOR RESTRICTION, IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 744-4.233
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
717.6 717.6-36758.0 l
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 l
15.
IT RESE E SHUTDO H URS:
0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2429440 2429440 119508938 i
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
833857 833857 40515894 l
- 18. NET ELEC. ENERGY GENERATED (MWH):
797077 797077 38544554 l.
- 19. REACTOR SERVICE FACTOR 96.4 %
96.4% '-
89.1 %
- 20. REACTOR AVAILABILITY FACTOR 96.4 %
96.4 %
. 89.1 %
- 21. UNIT SERVICE FACTOR:
94.2 %
94.2% -
87.9 %
j
- 22. UNIT AVAILABILITY FACTOR:
94.2 %
- 94.2%
87.9 %
i
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
- 92.1 %
92.1 %
84.2 %
l i
~ 24. UNIT CAPACITY FACTOR (USING DER NET):
91.6 %
- 91.6%
84.3 %
- 25. UNIT FORCED OUTAGE RATE:
5.8% -
5.8%.
1.6%
l
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :
NA V2-2 g
l:
J. :
t.,
UNIT 2 AVERAGE DAILY DOCVT.T NO. 50-425 POWER LEVEL DATE:
FEBRUARY 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(700) 326-4104 j
i l'
i DAY Net MW l
1178
- l 1.
2.
1174 *
.[
3.
1174
- 4...
1177
- 5..
1179
- 6.
1177
- 7.
1063 l
8.
0 9.........
685 1174
- 10.
- 11..
1179
- 12.
1177
- i 13...
1179
- 14.
1180
- 15.
1182
- 16..
1183
- i 17........
1181
- 18....
1182
- f 19.
401 20.
423 21.
1143 4
22...
1177
- 23.
1188
- 24.
1188
- 25....
1186
- 26.
1183
- 27.
1186
- t 28.
1179
- 29..
1182
- 30..
1187?
31.
1189 *
.i
V2-3
- l
a I
t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:
FEBRUARY 1,-1994 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH JANUARY 1994 j
R M
S E
E Y
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE l
I P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
. NUMBER ME (SUBCODE)
PREVENT RECURRENCE -
l 94 1 1/7 F
23.5 A
3 2-94-1 FK 87 SEE BELOW 94-2 1/19 F
19.8 A
3 2-94-2 SM P
SEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV S: SCiiEDULED A-EQU!PMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR j
D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN) i H-OTHER (EXPLAIN)
EVENT 94-1 CAUSE: The initiating event for this reactor trip was the operation of a differential relay on a shunt reactor in the high voltage switchyard which resulted in the trip of two 500 kV air blast circuit breakers (ACB), one of which was the Unit 2 main generator ACB. After operation, the two ACBs had low air pressure indications which served as a permissive in the breaker failure protective relaying scheme. This resulted in simultaneous tripping of the back-up breakers, including the remaining Unit 2 main generator ACB. This resulted in a generator trip followed by a turbine trip and reactor trip.
CORRECTIVE ACTIONS: The shunt reactor was removed from service pending further testing and analysis. Air pressure for the ACBs was restored to normallevels and the breakers were verifieJ to operate properly. The main generator ACBs were then returned to service, allowing unit startup to commence.
i EVENT 94-2 CAUSE: The initiating cause of this event was tripping of the "B" heater drain pump (HDP). This ultimately led to water i
entering the "C" and "D" MSRs, which generated the turbine trip signal j
CORRECTIVE ACTIONS: Troubleshooting verified no abnormal condition of the HDT pump. Level controllers and -
associated level switches in the MSRs, MSDTs and HDT were inspected to ensure proper operation.
V2-4 1
i
a ENCLOSURE 3 VOGTLE ELECTRIC GENERATING Pl. ANT-UNITS 1 AND 2 CilALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425-DATE:
FEBRUARY 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 EVENT DATE TAG NO.
TYPE DESCRIPTION NO EVENTS FOR JANUARY.
L-I i