Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1090-05, Provides Plan & Schedule for Environ Qualification of Electrical Equipment in Intermediate Bldg at Facility. Vendor Qualification Packages Will Be Revised to Reflect Newly Installed Equipment & Addl Analyses on Existing Ones + (02:10:19, 17 December 2024)
- BECO-90-113, Informs of Termination of Senior Reactor Operator,El Cobb on 900901,per 10CFR50.74 + (02:10:19, 17 December 2024)
- BECO-90-120, Monthly Operating Rept for Sept 1990 for Pilgrim Nuclear Power Station + (02:10:20, 17 December 2024)
- ML20064B378 + (02:10:21, 17 December 2024)
- ML20064B373 + (02:10:22, 17 December 2024)
- ML20064B371 + (02:10:24, 17 December 2024)
- ML20064B365 + (02:10:25, 17 December 2024)
- ML20064B361 + (02:10:26, 17 December 2024)
- ML20064B356 + (02:10:27, 17 December 2024)
- ML20064B345 + (02:10:28, 17 December 2024)
- ML20064B342 + (02:10:30, 17 December 2024)
- ML20064B343 + (02:10:30, 17 December 2024)
- BVY-90-097, Submits Feedwater Check Valve Evaluation,In Response to Flaws Observed in Stellite Wear Pads During 1989 Outage + (02:10:31, 17 December 2024)
- ML20064B339 + (02:10:31, 17 December 2024)
- PY-CEI-NRR-1240, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21) + (02:10:32, 17 December 2024)
- RBG-33772, Monthly Operating Rept for Sept 1990 for River Bend Station Unit 1 + (02:10:33, 17 December 2024)
- ML20064B337 + (02:10:33, 17 December 2024)
- ML20064B321 + (02:10:34, 17 December 2024)
- ML20064B319 + (02:10:38, 17 December 2024)
- ML20064B318 + (02:10:39, 17 December 2024)
- ML20064B317 + (02:10:39, 17 December 2024)
- 05000440/LER-1990-024, :on 900909,determined That Failure to Properly Control Surveillance Testing Resulted in Suppression Pool Instrumentation Being Out of Svc.Caused by Procedural Deficiency.Licensed Operators Trained to Lessons Learned + (02:10:41, 17 December 2024)
- ML20064B308 + (02:10:42, 17 December 2024)
- ML20064B307 + (02:10:43, 17 December 2024)
- ML20064B306 + (02:10:44, 17 December 2024)
- ML20064B304 + (02:10:44, 17 December 2024)
- ML20064B303 + (02:10:45, 17 December 2024)
- ST-HL-AE-3594, Monthly Operating Repts for Sept 1990 for South Texas Project Electric Generating Station Units 1 & 2 + (02:10:45, 17 December 2024)
- RBG-33677, Application for Amend to License NPF-47,revising Tech Specs Re Approval Requirements for Procedures & Programs + (02:10:46, 17 December 2024)
- ML20064B295 + (02:10:46, 17 December 2024)
- 05000423/LER-1990-028, :on 900904,control Bldg Isolation Signal Initiated by Train B Control Bldg Inlet Ventilation Radiation Monitor Due to Equipment Failure.Failed Train Detector Repaired + (02:10:48, 17 December 2024)
- ML20064B285 + (02:10:52, 17 December 2024)
- AECM-90-0182, Submits Info Re Alternate DHR Sys,Per 900924 Amend 70 to License NPF-29,covering Outage Scheduling Process + (02:10:56, 17 December 2024)
- 3F1090-10, Monthly Operating Rept for Sept 1990 for Crystal River Unit 3 + (02:10:57, 17 December 2024)
- 05000293/LER-1990-013, :on 900902,unplanned Manual Reactor Scram Initiated W/Reactor Power at 60%.Fuse Blew in Feedwater Control Circuit Power Supply Causing Feedwater Regulating Valves to Lockup.Trip Linkage Repaired + (02:10:59, 17 December 2024)
- JAFP-90-0737, Monthly Operating Rept for Sept 1990 for Ja Fitzpatrick Nuclear Power Plant + (02:11:00, 17 December 2024)
- ML20064B274 + (02:11:00, 17 December 2024)
- ML20064B273 + (02:11:01, 17 December 2024)
- 05000412/LER-1990-010-01, :on 900904:letdown Isolation Occurred Due to Low Pressurizer Water Level.Caused by Interaction of Control Sys Dump Operation Combined W/Effects of Hydraulic Coupling of Rcs.Pressurizer Level Restored + (02:11:06, 17 December 2024)
- RBG-33675, Responds to Violations Noted in Insp Rept 50-458/90-15. Corrective Actions:Emergency Directors & Recovery Managers Scheduled to Attend Training Prior to 910301 + (02:11:07, 17 December 2024)
- ML20064B263 + (02:11:08, 17 December 2024)
- ML20064B259 + (02:11:08, 17 December 2024)
- 05000424/LER-1990-018-01, :on 900907,discovered That Surveillance Required by Tech Spec 4.0.5 & ASME Section XI Inadequately Performed.Caused by Procedure Inadequacy.Procedure Corrected & Operability of Check Valve Reverified + (02:11:10, 17 December 2024)
- PY-CEI-NRR-1238, Forwards LERs 90-021 & 90-024 for Perry Nuclear Power Plant + (02:11:11, 17 December 2024)
- ML20064B217 + (02:11:12, 17 December 2024)
- ML20064B246 + (02:11:12, 17 December 2024)
- ML20064B214 + (02:11:13, 17 December 2024)
- ML20064B216 + (02:11:13, 17 December 2024)
- ML20064B211 + (02:11:14, 17 December 2024)
- ML20064B209 + (02:11:15, 17 December 2024)
- ML20064B208 + (02:11:16, 17 December 2024)
- ML20064B205 + (02:11:18, 17 December 2024)