ML20064B365
| ML20064B365 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/02/1990 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-042, CON-NRC-90-42 GL-89-04, GL-89-4, IEB-88-004, IEB-88-4, VPNPD-90-429, NUDOCS 9010160253 | |
| Download: ML20064B365 (2) | |
Text
-
- I
?,,
b N~
Electnc-
\\
POWER COMPARF l'
ll
- 231 W Mchgon. Ro. Box 2046. Mdwovkee. WI $3201 (414)221-2M
.]
]
.l'l VPNPD 42 9 NRC 042
{
q
-October 2, 1990-N i.i j
Document Control Desk U S Nuclear Regulatory Commission Mail Station P1-137 Washington,.DC-20555 Gentlemen:-
Dockets 50-266 and 50-301 NRC: Bulletin'88-04 and Generic Letter'89-04 j
Minimum Flow Testina CaDabilities for-RHR.
SI and Containment Soray-Pumos' Point Beach Nuclear Plant.' Units'1 and :t,
<e 1
In a response to.NRC Bulletin.88-04,~" Potential Safety-Related-
]y 1
Pump Loss,". dated June' 28, 1988, iWisconsin Electric l committed to:
modify the Residual' Heat Removal (RHR)? system and the Safetyc Q
Injection (SI) system'at our1 Point: Beach Nuclear Plant in order.
/i to provide the capability to performLthefrequiredEinservice:
testing of the pumps in these, systems!atiflow"ratessequalito'or 1
greater.than-the minimum-flows ~now recommendedLbyEtheLpump;.
. i.
- 1 manufacturers.
In that tletter ' we. proposedi a Lschedule L to" have -
i these' modifications completedEduringithe units'1refuelingtoutages-1 in 1991..
The NRC in a letter dated'May~ 26,"1989,-acknowledged =
1 this proposed: corrective action and schedule.<
In a separate letter dated March'2, 1990, which'respondednto 1
Generic Letter 89-04, " Guidance onLDeveloping;Acceptablei j
s
' Inservice Testing Programs," Wisconsin: Electric" committed /to'make-physical modifications to the containment spray systemsiforthothq Units 11and 2.which would allow spray. pump full-flow:testingJoniai routine basis during plant'~operationsiand'therefore satisfy thei inserviceLtesting recommendations of the generic letter. SThese:
i u.
spray system modifications.were during each unit'sf1991.refuelinalsoascheduled?tolbefinstalledL g: outage.
a m.
I l
l m
vo101602b3 YOlOU2 PDR ADOCK 05000266 a
g PDC q
s v
3 m v J 'd
. A 3ll A/E!!) WllIsc0f5N1 UkVL9[ C0!]S/WkN
)
j
,=
...>l+
NRC-Document Control Desk 4
October 2,- 1990 Page 2 In completing the detailed engineering and investigating the 3
' availability.of qualified valves and components to provide these modifications, we have determined that our schedule to1 install these' modifications.during the 1991 Unit.1 refueling. outage 1
cannot 1xt satisfied.
The primary difficulty involves the lead.
time-necessary to-procure the safety-related valves.needed for
- )
these piping changes.
Our detailed engineering and design of these modifications was also delayed by other staff commitments.
We expect to have-the material available to do the Unit 2 modifications in the fall of 1991 as scheduled;'however, this letter is to inform you that we are rescheduling these.
i modifications for Point Beach Unit 1 to'the spring 1992 refueling outage.
Please contact us if you have any' questions.concerning this
- 1 change to our proposed schedule or regarding our. proposed modifications as discussed in the referenced letters.
Very truly yours, 47^f.
fhifg/
I C. W.
Fay 4
Vice President d
. Nuclear Power Subscribedandsworntogeforeme this TE day of
/Q ejde n ;
1990.
\\h O%%c) O kk
)U
/
I M w y mn k ka.
Notary Public, State of-Wisconsin My Commission expires
@ 28-77 Copy to: Resident Inspector NRC Regional Administrator. Region III 1
l e
l-l 4
l 1
-s 4
4 e+
a
=
m
<a-,~
-,we e
e+-,e 3
em-e_e,ee.m
, +
r++
w w
e-aE=
w
-