Advises That Mods to RHR & Safety Injection Sys Being Rescheduled for Spring of 1992,per Response to NRC Bulletin 88-004 & Generic Ltr 89-04 Re Min Flow Testing Capabilities for Rhr,Safety Injection & Containment Spray Pumps
ML20064B365
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/02/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-042, CON-NRC-90-42 GL-89-04, GL-89-4, IEB-88-004, IEB-88-4, VPNPD-90-429, NUDOCS 9010160253
Download: ML20064B365 (2)


Text

-

  1. I

?,,

b N~

Electnc-

\\

POWER COMPARF l'

ll

- 231 W Mchgon. Ro. Box 2046. Mdwovkee. WI $3201 (414)221-2M

.]

]

.l'l VPNPD 42 9 NRC 042

{

q

-October 2, 1990-N i.i j

Document Control Desk U S Nuclear Regulatory Commission Mail Station P1-137 Washington,.DC-20555 Gentlemen:-

Dockets 50-266 and 50-301 NRC: Bulletin'88-04 and Generic Letter'89-04 j

Minimum Flow Testina CaDabilities for-RHR.

SI and Containment Soray-Pumos' Point Beach Nuclear Plant.' Units'1 and :t,

<e 1

In a response to.NRC Bulletin.88-04,~" Potential Safety-Related-

]y 1

Pump Loss,". dated June' 28, 1988, iWisconsin Electric l committed to:

modify the Residual' Heat Removal (RHR)? system and the Safetyc Q

Injection (SI) system'at our1 Point: Beach Nuclear Plant in order.

/i to provide the capability to performLthefrequiredEinservice:

testing of the pumps in these, systems!atiflow"ratessequalito'or 1

greater.than-the minimum-flows ~now recommendedLbyEtheLpump;.

. i.

1 manufacturers.

In that tletter ' we. proposedi a Lschedule L to" have -

i these' modifications completedEduringithe units'1refuelingtoutages-1 in 1991..

The NRC in a letter dated'May~ 26,"1989,-acknowledged =

1 this proposed: corrective action and schedule.<

In a separate letter dated March'2, 1990, which'respondednto 1

Generic Letter 89-04, " Guidance onLDeveloping;Acceptablei j

s

' Inservice Testing Programs," Wisconsin: Electric" committed /to'make-physical modifications to the containment spray systemsiforthothq Units 11and 2.which would allow spray. pump full-flow:testingJoniai routine basis during plant'~operationsiand'therefore satisfy thei inserviceLtesting recommendations of the generic letter. SThese:

i u.

spray system modifications.were during each unit'sf1991.refuelinalsoascheduled?tolbefinstalledL g: outage.

a m.

I l

l m

vo101602b3 YOlOU2 PDR ADOCK 05000266 a

g PDC q

s v

3 m v J 'd

. A 3ll A/E!!) WllIsc0f5N1 UkVL9[ C0!]S/WkN

)

j

,=

...>l+

NRC-Document Control Desk 4

October 2,- 1990 Page 2 In completing the detailed engineering and investigating the 3

' availability.of qualified valves and components to provide these modifications, we have determined that our schedule to1 install these' modifications.during the 1991 Unit.1 refueling. outage 1

cannot 1xt satisfied.

The primary difficulty involves the lead.

time-necessary to-procure the safety-related valves.needed for

)

these piping changes.

Our detailed engineering and design of these modifications was also delayed by other staff commitments.

We expect to have-the material available to do the Unit 2 modifications in the fall of 1991 as scheduled;'however, this letter is to inform you that we are rescheduling these.

i modifications for Point Beach Unit 1 to'the spring 1992 refueling outage.

Please contact us if you have any' questions.concerning this

- 1 change to our proposed schedule or regarding our. proposed modifications as discussed in the referenced letters.

Very truly yours, 47^f.

fhifg/

I C. W.

Fay 4

Vice President d

. Nuclear Power Subscribedandsworntogeforeme this TE day of

/Q ejde n ;

1990.

\\h O%%c) O kk

)U

/

I M w y mn k ka.

Notary Public, State of-Wisconsin My Commission expires

@ 28-77 Copy to: Resident Inspector NRC Regional Administrator. Region III 1

l e

l-l 4

l 1

-s 4

4 e+

a

=

m

<a-,~

-,we e

e+-,e 3

em-e_e,ee.m

, +

r++

w w

e-aE=

w

-