ML20064B273

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1990 for Beaver Valley Power Station Units 1 & 2
ML20064B273
Person / Time
Site: Beaver Valley
Issue date: 09/30/1990
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9010160018
Download: ML20064B273 (9)


Text

.. -.

4-.

i j

"F pt j

L A

Telephone (412) 3934000 '

Nuclear Group P.O Bos 4 Shippingport. PA 4077-0004 Oc+h 5,1990 i

l 1

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR j Unit 2 - Docket'No. 50-412, License No. NPF-73 Monthlv' Operatim Reoort i

U. S. Nuclear Regulatory h inaion' W = ant Control Desk WashirxJton, D.C.

20555 l

Gentlemen:

.In accordance with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of September, i

1990.

i Very truly yours, Vice President Nuclear Group MAW /nd Enclosures

?

cc: NRC Regional Office King of Prussia, PA l

b b'b b 9010160018 900930 PDR ADOCK 05000334 R

PDC l

\\ \\

i.

e OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE:

10/07/90:

COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393 7621 QfERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: SEPTEMBER 1990
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING-(Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860 t

7. MAX DEPENDABLE CAPACITY (Net MWe):

810

8. IF CMANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

a r

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A P

THIS MONTH YEAR TO DATE CUMULATIVE.

11. HOURS IN REPORTING PERIOD:

720.0 6551.0 126383.0

12. NO OF HRS REACTOR WAS CRITICAL:

720.0 6093.1 78231.6

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 6045.0 76512.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1851557.0 15200723.0 181280778.5 l

17. GROSS ELECT. ENERGY GEN. (MWH):

599790.0 4938620,0 58208309.0 1

18. NET ELECTRICAL ENERGY GEN. (MWH):

565700.0 4642250.0 54339400.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 92.3 62.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 92.3 62.8
21. UNIT CAPACITY FACTOR (MDC): PCT 97.0 87.5 56.0
22. UNIT CAPACITY FACTOR (DER): PCT 94.1 34.9 54.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.8

-16.5

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

r l

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

1

INIT SUIIIME NO RMR REUJCI1OE Dodet No.

50-334 Ihit Name tws unt s;.

Date Tvw 7..390 Bf ILL W1IEE!r EERRP MNIH SEPIDHR 1990 (412).r>J-/tazi j

Method of Timisee mm& i.uad.ive n n-*im Evet i

Actaat to -

2.

Data Typel (HLus)

Ibsstm2 Ibwt HEpart #

Prevert pnnerice 32 900902 S

O H~

5 M/A ZZ 77174 Ihit's output rs=trwi to 65%

to Iced foll w.

1 1

2 3

4 F-Rrosi pmcrt:

Method: -

ENhibit G-Instructicas fir S-Sciuda]ed A-+hiiW Ewihme (Explain) 1-feiriual Fx - - : lm of Data p

B-ftmizzazmx or 'Ilest 2-ftsrual Satana fT'Tamisee Evenit (IER) File N~

3-Autaustic Scran (MIE0161).

E

' a^ x-.__ Ibsh-ie+1m 4-Ct:1t'd. frtan Previcas Itr;th Dem y

c)tirurg & LiOErm Exan -

SW r+im F

ve 9-Other

. 5 EMhibit Ih Soutue.

cnal (Explain) 4

.._.m, c

-. ~.

y

.~e3

.w-

+_g..-_.+--+:-m_____

m.mEs

1

)

NMEATIVE SLPHARY OF.

'j l-M]lf1HLY OPERATING EXPERIENCE UNIT I SEPITMBER 1990 l

l September 1

'Ihe Unit operated at a naminal value 'of 100% output.

September 2 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was r*4' M to 65% to load follow.-

September 3

'Ihe Unit operated at 65% output to load follow.

September 4 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />,.the Unit's output was escalated to 100%.

September 5

'Ihe Unit operated at a runinal value of 100% output.

thrmgh September 30 r

r

w AVERNE DAILY UNIT IVWER IJNEL Docket No.

50-334 Unit' BVPS Unit 1 Date October 7. 1990-ompleted by M. A. Wirner Telephone (412) 393-7621 NJimi SEPIDIBER_1990_

f l

DAY AVERNE DAILY POWER IEVEL DAY AVERAGE DAILY ICWER IEVEL l

(We-Net)

-(We-Net)

I 1

800 17 813 2

504' 18 817 3

492 19 813 4

742 20 808 5

800 21 804 6

796 22 804 7

808 23-800 8

804 24 821 l

9 808 25 817 l

l 10 808 26 817 l-1 11 804 27 813

-4 12 800 28 808 13 800 29 808 14 800 30 813 15 813 16 817 1Nsmerrms On this format, list the average daily unit power level in MWe-Net for each daf in the reporting month. Cartpute to the nearest whole megawatt.

'l 1

OPERATING DATA REPORT DOCKET'NO.:

50-412 REPORT DATE:

10/07/90 COMPLETED BY: M.A.WINGER J

TELEPHONE:

(412) 393 7621 t

OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: SEPTEMBER 1990
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WilICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A TilIS MONTil YEAR TO DATE CUMULATIVE

11. Il0URS IN REPORTING PERIOD:

720.0 6551.0 25166.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

70.5 5793.9 21350.7

13. REACTOR RESERVE SHUTDOWN 110URS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

70.0 5786.0 21212.9

15. UNIT RESERVE SilUTDOWN 110URS:

0.0 o0. 0

_ 0.0

16. GROSS THERMAL ENERGY GEN. (MWil) :

74406.0 11976580.0 50789324.4

17. GROSS ELECT ENERGY ~CEN.'(MWH):

21300.0 3817400.0 16283500.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

15141.0 3585089.0 15341564.0

19. UNIT SERVICE FACTOR: (PERCENT) 9.7-88.3 84.3
20. UNIT AVAILABILITY FACTOR:(PERCENT) 9.7 88.3 84.3
21. UNIT CAPACITY FACTOR (MDC): PCT

_2.6 65.8 73.2

22. UNIT CAPACITY FACTOR (DER): PCT 2.5 65.5 72.9 1
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0,0 1.9 5.4 l

l-

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

l THE UNIT SHUT DOWN'ON SEPTEMBER 3.1990 FOR THE' UNIT'S SECOND REFUELING OUTAGE THE OUTAGE IS SCHEDULED TO BE COMPLETED ON NOVEMBER 13.1990.

25. IF SHUT DOWN AT END OF REPORT PERIOD,' ESTIMATED DATE OF.STARTUP: NOV 13.1990
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A

-COMMERCIAL OPERATION N/A N/A 1

l

4 INIT SUIDOtB AND IGER PEIUCI106 Dodet No.. 50-412 thit N2mue tws Urnt #2 Date We 7. 15P90.

etsi

&L W1rner RERRE MNIH SEPIDER 1990 (412) 533-/62.1 l

Mathod of LiOEfBee Ouse & utad.1NG Dwatim EWyt n i.

Artwr1 to Noe Dube 7ypel (Ib2ts)

Ibastn2 Iblan M

Itpart #

Prevust parence Ihit,cabsl at 40% cutpt to -

25 900901 S

O H

5 fyA

'ZZ wa suax.u the cutitre fuel cycle..

26 900903 S

650 C

1 IVA Ic N

h thit e N h h thit's W red *1irg nearp..

1-2 3

4 F-Ibroad W:

. Method:

Edlibit G-Irstructicrs fiar i

S-Schertilari A-+hiirmwt Failure (Dtplain) 1-Men 1 FxNn=im of Dsta al M

B-MiisEm=xxx or 'Itst 2-Mnal Scrm fcr 1see Evert (IIR) File e4wnm1irg 3-# *r=*ir' Sam (MHD0161).

D-Pruilar Idah-ir+im 4-02t'd. - fra Prsvious Ptmth I

E -' ai,uc

& T.irv=se Exam 5-prt r+iert 5

F

've 9-Other EWhibit I-sune Source.

cnal Etrat- (Explain)

(Explain)

.i

'l 7-s_..m

NARRATIVE StDNARY OF

.?.

MNIHLY OPERATING EXPERIENCE

t. WIT II SEPIDGER 1990 I

r September 1

'Ibe Unit operated at 40% output to stretch the current j

through fuel cycle.

Septenk_r 2 i

September 3 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was reduced, in preparation

'l for a unit. shutdown.

At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit was removed I

frun service for the Unit's secorxl refueling outage. At-l

[

2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> the Unit entered Mode 3.

September 4 At 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> the Unit entered Mode'4.

September 5 At 1313 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.995965e-4 months <br /> the Unit entered Mode 5.

September 6-

'Ibe Unit remained in Mode 5 to prepare to enter Mode 6.

through September 11 September 12 At 0419 hours0.00485 days <br />0.116 hours <br />6.92791e-4 weeks <br />1.594295e-4 months <br /> the Unit entered Mode 6.

I September 13

'Ihe Unit remained shutdown for the Unit's second through refueling outage.-

September 30 l

4 i

b i

l

AVERAGE IAILY INIT POWER IEVEL

,. ~...

F Docket No.

50-412 1

. Unit BVPS Unit 2 Date' Octe**r 7.1990 Otmpleted by M. A. Wirner

'Ielephone f 412)393-7621

}{ nit! SEPIE N R 199_0 IRY AVERAGE IRILY POWER IEVEL IAY AVERAGE DAILY IO4ER IEVEL (M)

( N Net) 1 274 17 0

2 269 18 O'

3 240 19 0

4 0

20 0

5 0

21 0

6.

O 22 0

7 0

23 0

8 0

24 0

9 0

25 0

1 26 0

10 0

11 0

27 0

12 0

28 0

13 0

~29 0

14 0

30 0

15 0

16 0

INSTRUCI' IONS On this fonnat, list the average daily unit power level in MWe-Net for each day l

in the reporting month. Ompute to the nearest whole megawatt.

.