ML20064B273
| ML20064B273 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/30/1990 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9010160018 | |
| Download: ML20064B273 (9) | |
Text
.. -.
4-.
i j
"F pt j
L A
Telephone (412) 3934000 '
Nuclear Group P.O Bos 4 Shippingport. PA 4077-0004 Oc+h 5,1990 i
l 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR j Unit 2 - Docket'No. 50-412, License No. NPF-73 Monthlv' Operatim Reoort i
U. S. Nuclear Regulatory h inaion' W = ant Control Desk WashirxJton, D.C.
20555 l
Gentlemen:
.In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of September, i
1990.
i Very truly yours, Vice President Nuclear Group MAW /nd Enclosures
?
cc: NRC Regional Office King of Prussia, PA l
b b'b b 9010160018 900930 PDR ADOCK 05000334 R
PDC l
\\ \\
i.
e OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
10/07/90:
COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 QfERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING-(Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860 t
- 7. MAX DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CMANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
a r
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A P
THIS MONTH YEAR TO DATE CUMULATIVE.
- 11. HOURS IN REPORTING PERIOD:
720.0 6551.0 126383.0
- 12. NO OF HRS REACTOR WAS CRITICAL:
720.0 6093.1 78231.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 6045.0 76512.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1851557.0 15200723.0 181280778.5 l
- 17. GROSS ELECT. ENERGY GEN. (MWH):
599790.0 4938620,0 58208309.0 1
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
565700.0 4642250.0 54339400.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 92.3 62.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 92.3 62.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.1 34.9 54.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.8
-16.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
r l
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
1
INIT SUIIIME NO RMR REUJCI1OE Dodet No.
50-334 Ihit Name tws unt s;.
Date Tvw 7..390 Bf ILL W1IEE!r EERRP MNIH SEPIDHR 1990 (412).r>J-/tazi j
Method of Timisee mm& i.uad.ive n n-*im Evet i
Actaat to -
2.
Data Typel (HLus)
Ibsstm2 Ibwt HEpart #
Prevert pnnerice 32 900902 S
O H~
5 M/A ZZ 77174 Ihit's output rs=trwi to 65%
to Iced foll w.
1 1
2 3
4 F-Rrosi pmcrt:
Method: -
ENhibit G-Instructicas fir S-Sciuda]ed A-+hiiW Ewihme (Explain) 1-feiriual Fx - - : lm of Data p
B-ftmizzazmx or 'Ilest 2-ftsrual Satana fT'Tamisee Evenit (IER) File N~
3-Autaustic Scran (MIE0161).
E
' a^ x-.__ Ibsh-ie+1m 4-Ct:1t'd. frtan Previcas Itr;th Dem y
c)tirurg & LiOErm Exan -
SW r+im F
ve 9-Other
. 5 EMhibit Ih Soutue.
cnal (Explain) 4
.._.m, c
-. ~.
y
.~e3
.w-
+_g..-_.+--+:-m_____
m.mEs
1
)
NMEATIVE SLPHARY OF.
'j l-M]lf1HLY OPERATING EXPERIENCE UNIT I SEPITMBER 1990 l
l September 1
'Ihe Unit operated at a naminal value 'of 100% output.
September 2 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the Unit's output was r*4' M to 65% to load follow.-
September 3
'Ihe Unit operated at 65% output to load follow.
September 4 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />,.the Unit's output was escalated to 100%.
September 5
'Ihe Unit operated at a runinal value of 100% output.
thrmgh September 30 r
r
w AVERNE DAILY UNIT IVWER IJNEL Docket No.
50-334 Unit' BVPS Unit 1 Date October 7. 1990-ompleted by M. A. Wirner Telephone (412) 393-7621 NJimi SEPIDIBER_1990_
f l
DAY AVERNE DAILY POWER IEVEL DAY AVERAGE DAILY ICWER IEVEL l
(We-Net)
-(We-Net)
I 1
800 17 813 2
504' 18 817 3
492 19 813 4
742 20 808 5
800 21 804 6
796 22 804 7
808 23-800 8
804 24 821 l
9 808 25 817 l
l 10 808 26 817 l-1 11 804 27 813
-4 12 800 28 808 13 800 29 808 14 800 30 813 15 813 16 817 1Nsmerrms On this format, list the average daily unit power level in MWe-Net for each daf in the reporting month. Cartpute to the nearest whole megawatt.
'l 1
OPERATING DATA REPORT DOCKET'NO.:
50-412 REPORT DATE:
10/07/90 COMPLETED BY: M.A.WINGER J
TELEPHONE:
(412) 393 7621 t
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WilICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A TilIS MONTil YEAR TO DATE CUMULATIVE
- 11. Il0URS IN REPORTING PERIOD:
720.0 6551.0 25166.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
70.5 5793.9 21350.7
- 13. REACTOR RESERVE SHUTDOWN 110URS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
70.0 5786.0 21212.9
- 15. UNIT RESERVE SilUTDOWN 110URS:
0.0 o0. 0
_ 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWil) :
74406.0 11976580.0 50789324.4
- 17. GROSS ELECT ENERGY ~CEN.'(MWH):
21300.0 3817400.0 16283500.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
15141.0 3585089.0 15341564.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 9.7-88.3 84.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 9.7 88.3 84.3
_2.6 65.8 73.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 2.5 65.5 72.9 1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0,0 1.9 5.4 l
l-
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
l THE UNIT SHUT DOWN'ON SEPTEMBER 3.1990 FOR THE' UNIT'S SECOND REFUELING OUTAGE THE OUTAGE IS SCHEDULED TO BE COMPLETED ON NOVEMBER 13.1990.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD,' ESTIMATED DATE OF.STARTUP: NOV 13.1990
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A
-COMMERCIAL OPERATION N/A N/A 1
l
4 INIT SUIDOtB AND IGER PEIUCI106 Dodet No.. 50-412 thit N2mue tws Urnt #2 Date We 7. 15P90.
etsi
&L W1rner RERRE MNIH SEPIDER 1990 (412) 533-/62.1 l
Mathod of LiOEfBee Ouse & utad.1NG Dwatim EWyt n i.
Artwr1 to Noe Dube 7ypel (Ib2ts)
Ibastn2 Iblan M
Itpart #
Prevust parence Ihit,cabsl at 40% cutpt to -
25 900901 S
O H
5 fyA
'ZZ wa suax.u the cutitre fuel cycle..
26 900903 S
650 C
1 IVA Ic N
h thit e N h h thit's W red *1irg nearp..
1-2 3
4 F-Ibroad W:
. Method:
Edlibit G-Irstructicrs fiar i
S-Schertilari A-+hiirmwt Failure (Dtplain) 1-Men 1 FxNn=im of Dsta al M
B-MiisEm=xxx or 'Itst 2-Mnal Scrm fcr 1see Evert (IIR) File e4wnm1irg 3-# *r=*ir' Sam (MHD0161).
D-Pruilar Idah-ir+im 4-02t'd. - fra Prsvious Ptmth I
E -' ai,uc
& T.irv=se Exam 5-prt r+iert 5
F
've 9-Other EWhibit I-sune Source.
cnal Etrat- (Explain)
(Explain)
.i
'l 7-s_..m
NARRATIVE StDNARY OF
.?.
MNIHLY OPERATING EXPERIENCE
- t. WIT II SEPIDGER 1990 I
r September 1
'Ibe Unit operated at 40% output to stretch the current j
through fuel cycle.
Septenk_r 2 i
September 3 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was reduced, in preparation
'l for a unit. shutdown.
At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit was removed I
frun service for the Unit's secorxl refueling outage. At-l
[
2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> the Unit entered Mode 3.
September 4 At 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> the Unit entered Mode'4.
September 5 At 1313 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.995965e-4 months <br /> the Unit entered Mode 5.
September 6-
'Ibe Unit remained in Mode 5 to prepare to enter Mode 6.
through September 11 September 12 At 0419 hours0.00485 days <br />0.116 hours <br />6.92791e-4 weeks <br />1.594295e-4 months <br /> the Unit entered Mode 6.
I September 13
'Ihe Unit remained shutdown for the Unit's second through refueling outage.-
September 30 l
4 i
b i
l
AVERAGE IAILY INIT POWER IEVEL
,. ~...
F Docket No.
50-412 1
. Unit BVPS Unit 2 Date' Octe**r 7.1990 Otmpleted by M. A. Wirner
'Ielephone f 412)393-7621
}{ nit! SEPIE N R 199_0 IRY AVERAGE IRILY POWER IEVEL IAY AVERAGE DAILY IO4ER IEVEL (M)
( N Net) 1 274 17 0
2 269 18 O'
3 240 19 0
4 0
20 0
5 0
21 0
6.
O 22 0
7 0
23 0
8 0
24 0
9 0
25 0
1 26 0
10 0
11 0
27 0
12 0
28 0
13 0
~29 0
14 0
30 0
15 0
16 0
INSTRUCI' IONS On this fonnat, list the average daily unit power level in MWe-Net for each day l
in the reporting month. Ompute to the nearest whole megawatt.
.