CORRECTED COPY OPERATING DATA REPORT DOCKET NO. 50-266 DATE October 8, 1990 COMPLETED BY K.

H. Nickels TELEPHONE 414/755-2321.

OPERATING STATUS

1. UNIT NAME:

POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD:

AUGUST 1990

3. LICENSED THERMAL POWER-(MWT):

1518.5

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE):

497.

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)i 509.
7. MAXIMUM DEPENDABLE CAPACITY;(NET MWE):

485.

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMB 1R 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL.TO WHICH RESTRICTED, IF ANY (NET MW3): NOT APPLICABLE
10. REASONS FOR~ RESTRICTIONS, (IF ANY):

NOT APPLI.2BLE THIS MONTH YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 173,735:
12. NUMBER'OF HOURS REACTOR WAS CRITICAL 744.0 4,494.8 142,838.5

-13. REACTOR RESERVE SHUTDOWN HOURS-0.0 0.0:

652.7

-14. HOURS GENERATOR ON LINE E742.5' 4,435.3-139,974.5.

15.' UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9

16. GROSS THERMAL ENERGY: GENERATED ~ (MWH) 11,120,491 6,508,950 194,977,342
17. GROSS ELECTRICAL ENERGY GENERATED!(MWH)

'376,440 2,201,320 65,806,010

18. NET ELECTRICAL ENERGY. GENERATED (MWH) 359,881

-2,099,635-62,690,326'

19. UNIT SERVICE FACTOR 99.8~

76.i.

80.6"

~

20. UNIT AVAILABILITY. FACTOR' 99.8 76.1 81.1'
21. UNIT CAPACITY FACTOR (USING MDC NET)

"99.7 74.2 74.0

22. UNIT CAPACITY FACTOR (USING DER NET)-

97.3.

72.5' 72.6

23. UNIT FORCED OUTAGE RATE.

0.0 0.0-1.8-

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE,lAND DURATION.0F EACH):

NONE

25. IF SHUTDOWN'AT END OF REPORT PERIOD,' ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS' CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER.22,'1977 J

9010160086 YO100Y PDR ADOCK 05000266 R

PDC

+-- :--

~ - - -. - -~

- ~.

3 1

CORRECTED COPY

.e 4

~

4 POINT BEACH NUCLEAR FIANT Docket Do.

_ 50-266 Unit Nesse PW h4 Unit 1 UNtr SIMBBOWMS A!9 F0JhER REDUCIMNS Deee -

  • - " - E 199B i

t'--, ' '-- By LW.M REPORT MONn{

AUGUST

. Teleptione No.

4-14/FM L

marshoe et summes No.

Date Type' Derence Reason 3 Dame breuses Buess i

5===

ca=y=an r===e ans h Asamts 5

l fN) mM E

Code

  • Cadc8 t

To Psamens at===--se 3

sessa6 S

U H

6 N/A ZZ DRD Load ees M per synaus amouf expossumers s=y==

Semogumet pseinemus seameniin en ename men asene ar u amium.

u 1

i r

4 i

i

.t i

1 l

i i

i

'F: Forced

'Rr==asr

' Method

  • Fmbihir G,- %

1 1

l S: hiesi A , ', =- Failuse (captain) 1 - Mammat

~

for preparasier of B - Mh or Testing 2 - M==m==1 Swans desa entry shoes C - Refueling 3 - A=da===8se Mmmm

~ IER Ele (NUEEG4161L D - Rqpalatasy Restriction 4 C h of l

E - Operseer Training &

PWessous Ladame 1inemmier Ezans E5-P M lead

.j l

. F-Adesimisarsaise 6-Odier (cupimise Wmhare I-samme source I

G - Oper= sin==I Error (explais) i H - Olber (caplain)

! GEMU)

=

= -

=