ML20064B306
| ML20064B306 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/30/1990 |
| From: | Nickels K WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20064B305 | List: |
| References | |
| NUDOCS 9010160083 | |
| Download: ML20064B306 (8) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
L-OPERATING DATA REPORT
'~
DOCKET NO. 50-266 DATE October 8, 1990 COMPLETED BY K. H.. Nickels TELEPHONE 414/755-2321 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD: SEPTEMBER 1990
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): _ 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 9.
POWER LEVEL.TO WHICH RESTRICTED, IF-ANY (NET MWE): NOT APPLICABLE-
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR.TO DATE CUMULATIVE
- 11. HOURS IN REPORTING" PERIOD
-720 6,551 174,455
- 12. NUMBER.OF. HOURS REACTOR WAS CRITICAL 720.0
.5,214.8 143,558.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0
- 0.0 652.7:
- 14. HOURS GENERATOR ON LINE 720.0 5,155.3 140,694.5
~15. UNIT RESERVE SHUTDOWN HOURS.
0.0 -
0.0 837.9.
- 16. GROSS' THERMAL' ENERGY GENERATED (MWH) :-
1,084,121
.7,593,071 196,061,463
- 17. GROSS ELECTRICAL ENERGY GENERATED-(MWH) 362,320 2,561,640 66,168,330.
18.-NET ELECTRICAL ENERGY-GENERATED'(MWH)~
346,222 2,445,857 63,036,548
- 19. UNIT SERVICE FACTOR-100.0
-- 7 8. 7 80.6
- 20. UNIT AVAILABILITY FACTOR 100.0
.78.7 -
81.1
- 21. UNIT CAPACITY FACTOR (USING.MDC NET)-
99.1-77.0 74.1
- 22. UNIT CAPACITY FACTOR-(USING' DER NET).
96.8-75.1 72.7
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0
-1.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS'(TYPE,-DATE, FRD DURATION.OF EACH):
'NONE
- 25. IF) SHUTDOWN AT END OF REPORT PERIOD,. ESTIMATED DATE OF STARTUP:
NOT~ SHUTDOWN e
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER. DATED SEPTEMBER 22,~.1977 9010160083 901009
~
PDR ADOCK 05000266 R
.m
--_-_a,
. #~
.. ~
.., - -~.. c _. _a m.
- u..
.u.
_,u
_g-
.?
POIST BEACII NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME.
Point Beach. Unit 1 ' '
MONTil SEPTEMBER DATE October 8.1990 -
COMPLETED BY K. H. N'miels TELEPHONE' 414/755-2321 AVERAGE AVERAGE AVERAGE-DAILY DAILY:
DAILY POWER LEVEL POWER LEVEL POWERIEVEL "-
DAY MWe NET DAY MWe NET '
DAY MWe NET 1
487 11 480 21 -
483 2
483 12 483 22 485
-3 482 13 458 23
'464' 4
488 14 489
- 24i
'486 "
' 5 486 15 -
459
~
'486 25' m.
- 6
'485 16 433~
- 26 --
-486 il. -
.7 483
' 17-
'457- ~489-
~
8 482
.-18 483 28 488 9-483
- 19
'484 29
'487 20' 483
'30 489 0
483 31 PBF-0028a
.(0190J-g.
s.4,>_
=-es
.y
.-cy-
.c g
p,y--*
++.e y n 5-w
-e-..-,--w, ysv ~
s ce e m = -,
o,
c< mwwe,.'-
n,
.,v.#
m.
3.w.
gw,--,
n.--
+
~
h_
POINT BEACH NUCLEAR PIANT
' Docket No.
50-266
^
.:m Uni 3 Name Point Beach: Unit 1 - -
- UNIT SHUTDOWNS AND POWER REDUCTIONS Date. _
October 8.1990
. ;g _
Completed By -
K. H. Nickels '
REPORT MONTH SEPTEMBER Telephone No. ' 414/755-2321 Method of
~
Shutting No.
Date Type' Duration Reason Down Licensee Sent System Component Cause and Correctne Action 2
(Ifours)
Reactor 3 Report No.
Code Code 8 d
To Present Recurrence 4
4 6
a v'
q i
l
'F: Forced
' Reason:
8Method:.
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) :
.1 - Manual
, for preparation of :
B - Maintenance or Testing' ~ ~
2 - Manual Scram data entry sheets
. C - Refueling :.
3 - Autonsatic Scram IER file (NUREG-0161) -
. D - Regulatory Restriction
- 4 - Continuation of 2 E - Operator Training &
' Previous Shutdown Ur*==ia-Exam 5 - Reduced load :
F - Adminierative :,
6 - Other (explain) -'
' Exhibit I - Same Source i 1..
. G - Operational Error (explain).
H - Other (explain).
PBF-0028b' (OW)
- i '
_ _ _ _ _ _ _ _ _ - _ _ - _ - _ - - ~ - - - - - -, - -, -. -
~ - -
- - ~
t t
o.
DOCKET Nd.
50-266-UNIT NAME Point Beach Unit 1.
DATE Cktober 8,1990 COMPLETED BY K. H. Nickels.
- TELEPilONE 414/755 2321
- Unit 1 operated at approximately 486 MWe net throughout the period with no ma,ior load reductions.
Safety related maintenance included the P 32C service water pump motor.
ay 2
=
1 J
- k
-:j l
l 3
L 1
r q
OPERATING DATA REPORT DOCKET NO. 50-301
?-
DATE October 8, 1990 COMPLETED BY
~ K. H. Nickels TELEPHONE-414/755-2321 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT. UNIT 2
. NOTES-
- 2. REPORTING PERIOD: SEPTEMBER 1990
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE}:
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF CHANGES OCCUR IN' CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 9.
POWER LEVEL TO WHICH. RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS,,(IF'ANY):.NOT APPLICABLE
.. THIS MONTH YR TO DATE.
CUMULATIVE 11.' HOURS IN REPORTING' PERIOD 720
. 6,551-159,240
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
.720.0 6,551.0 139,896.8
-13. REACTOR RESERVE SHUTDOWN HOURS 0.O
'O.O-216.7-
- 14. HOURS GENERATOR ON LINE 720.0-
' 6,551.0^
137,756.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0
.302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH).
1,068,375
.9,889,260 196,472,796
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 360,960 3,389,910
-66,715,1~D
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
.344,495 3,241,989 63,580,599
- 19. UNIT. SERVICE FACTOR
~100.0 100.0 86.5
- 20. UNIT AVAILABILITY-FACTOR-
-100.0 100.0 86.7
- 21. UNIT CAPACITY FACTOR (USING'MDC NET) 98.7 102.0
- 81. 6.-
- 22. UNIT CAPACITY FACTOR (USING DER NET)'
96.3 99.6-80.3
- 23. UNIT FORCED OUTAGE RATE O.0.
0.0 1.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS-(TYPE,'DATE, AND. DURATION OF EACH):
. Forty-two day refueling and maintenance outage scheduled to begin October-5, 1990.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD,LESTIMATED-DATE OF STARTUP:- NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 4
n
+
e.-
.-e.
., _., -,-i,.-
-e-r wl<
.,,-w-
~-m.-
-+~mv e
-w--',-+,,,,w
,e, e
~. -...
4-
.n-.
~'
-c POINT BEACH NUCLEAR PIANT '
DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL' UNIT NAMEL
' Point Beadi. Unit 2 MONTH SEPTEMBER DATE Odober 8.1990
~ COMPLETED BY-K. H. N~ckels TELEPHONE ~-
414/755-2321 AVERAGE AVERAGE' AVERAGE' -
DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL -
DAY MWe NET DAY MWe NET DAY
' MWe NET '
1 491 11 485 21 473' 2
488 12 487
. 22 471 3
485 13 492 23 471 4
492 14 494 24 467
~
5
'490 15 488
- 25..
~ 466-6 489 16
-486 26
' 464 7
465 17
'485'
~ 27
'- 468-8 486
.. 18 481
- 28 L
-456 9
492 19.
478'
~29
' 456' 10 483-20 -
'474
- 30.
- 455 31-
'w iPDF-002Sa (03-90)
, i M et
,,,.p
=-h-.,-tw-aa
,=pwn 4
,;7.irh,'Me.-
cM'9--p. Map t:
SrerA=
v{
.'"d'P-
- g.
"V'r.rrTm--pv
.-a*g"'e'
=*N***Y d "e
-~ * ' * -'O m2' TM'-+#M' '
i=1-m'--"N5*2.-
e a
POINT BEACH NUCLEAR PLA?fr Docket No.
'50-301-
~
'c
~
Unit Name -
Point Beach. Unit 2 - 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date.
Odober 8.1990 -
Completed By. ' K. H. Nickels
~
REPORT MONTH SEPTEMBER Telephooc No.
414/755-2321 Method of
- H Shutting No.
Date Type' Duration Reason 2 Down 1xensee & cat System Component
~ Cause and Correctm Action -
3 S
Olours) -
Reactor Report No.
Code
- Code
' To Prevent Recurrence
~..
i.
l I
g r
Reason:
- ' Method:
'F Fo ced 2
'F hen G Instradions u
.S: Scheduled
'A - Equipment Failure (explain)
~ 1 - Manual for preparation of -
.B Maintenance or Testing ~
12 - Manual Scram
~ data entry sheets
. C - Refueling 3 - Automatic Scram
) LER file (NUREG-0161) '
D ~- Regulatory Restriction 4 - Continuation of.
E - Operator Training &.
. Previous Shutdown :
i-
- hm*mg Fum=
f 5 - Reduced load
- F-Administrative 6 - Other (explain) -
'Fuhihet I'- Same Source G - Operational Error (explain)l
~
H - Other (explain)
N l
(N) y-,e m.
.e y
7,
.,_99 n.
.%-n
.g w
id'
.' deer'd-'g' 9
-6 pm.rpr-g'J-
.,g c
p
.,q,'w-w%*,-y.g.p'We%.-p gy.,
y
.;p.
,-_gisa w
--g.,qa y,.w g 7..
y y.
'%g e pg.rW m
'*S h@
w
'7*#'"WT
-'tdt to-e-e o
a*
ar 9 y q
4
,pi
.[
l}
' DOCKET NO
.50-301 UNIT NAME
' Point Beach Unit 2 DATE October 8,1990 COMPLETED BY K. H. Nickels TELEPHONE 414D55 2321 1
Unit 2 operated at approximately 487 MWe net until September 18 when the unit was placed in end-of core life -
~!
coastdown operation.
4 i
Safety related maintenance included installing pump casing drains and repairing oil and seal leaks on P-11 A -
l{
component _ cooling water pump.
. i
-s
-t e
h I
I
[
l-:
I