Forwards Monthly Operating Repts for Sept 1990 for Point Beach Nuclear Plant Units 1 & 2 & Corrected Sheets for Aug 1990
ML20064B304
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/09/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064B305 List:
References
CON-NRC-90-101 VPNPD-90-433, NUDOCS 9010160079
Download: ML20064B304 (1)


Text

__

p ' 4-Wisconsin v

Electnc POWER COMPANY ;

231 W Mu:hoon, Ro. Box 2046. Mihacukee. WI 53201

_(414)221-2315 .

VPNPD-90-433

-NRC-90-101 October 9,11990 4

U. S. NUCLEAR REGULATORY COMMISSION Document-Control-Desk Mail Station P1-137 .l Washington, D.:C. 20555 l

-Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS.

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 4

Attached are monthly operating reports /for Units 1-and 2, Point Beach Nuclear Plant, for the calendar month of September ~

1990.

Also attached are two corrected' sheets for the' August 4 report.

The Operating Data Report for Unit 1 has-been corrected.as-follows: Item 14 under "This Month" has been changed from-744.0 '

)

to 742.5; Items 19 and 20 under "This Month" have been changed J from 100 to 99.8. On the Unit Shutdowns and Power ReductionsL 'l sheet covering Unit 1, the " Duration (Hours)"; column has been corrected to show 1.5-hours instead-of1the O hours previously' 9 reported.

{

Very truly yours,  ;

r d. W -

C. . y }

ce President j Nuclear Power ~

Attachments  ;

i Copies to R. S. Cullen, PSCW l NRC Regional Administrator, Region 1III l NRC Resident Inspector '

9010160079 90100Y '

PDR ADOCK 05000266 i R PDC w

n u u a , a n a, sin u w a,a y