Forwards Monthly Operating Repts for Sept 1990 for Point Beach Nuclear Plant Units 1 & 2 & Corrected Sheets for Aug 1990
ML20064B304
Person / Time
Site: Point Beach  
Issue date: 10/09/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064B305 List:
References
CON-NRC-90-101 VPNPD-90-433, NUDOCS 9010160079
Download: ML20064B304 (1)


Text

__

' 4-p Wisconsin Electnc v

POWER COMPANY ;

231 W Mu:hoon, Ro. Box 2046. Mihacukee. WI 53201

_(414)221-2315.

VPNPD-90-433

-NRC-90-101 October 9,11990 4

U.

S. NUCLEAR REGULATORY COMMISSION Document-Control-Desk Mail Station P1-137

.l Washington, D.:C.

20555 l

-Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS.

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 4

Attached are monthly operating reports /for Units 1-and 2, Point Beach Nuclear Plant, for the calendar month of September ~

1990.

Also attached are two corrected' sheets for the' August 4 report.

The Operating Data Report for Unit 1 has-been corrected.as-

)

follows: Item 14 under "This Month" has been changed from-744.0 to 742.5; Items 19 and 20 under "This Month" have been changed J

from 100 to 99.8.

On the Unit Shutdowns and Power ReductionsL

'l sheet covering Unit 1, the " Duration (Hours)"; column has been corrected to show 1.5-hours instead-of1the O hours previously' 9

reported.

{

Very truly yours,

d. W r

C.

y

}

ce President j

Nuclear Power

~

Attachments i

Copies to R.

S.

Cullen, PSCW l

NRC Regional Administrator, Region 1III l

NRC Resident Inspector 9010160079 90100Y PDR ADOCK 05000266 i