ML20064B339

From kanterella
Jump to navigation Jump to search
Forwards Rev to Security Plan,Deleting Addendum Describing Scope & Schedule for Security Upgrades at Intake Structure.Rev Withheld (Ref 10CFR73.21)
ML20064B339
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/04/1990
From: Mineck D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
S-90-08, S-90-8, NUDOCS 9010160175
Download: ML20064B339 (2)


Text

L-l.

Iowa Electric Light and Power Company October 4, 1990 5-90--08 4

Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation ll. S. Nuclear.Regulatevy Commission Attn: Document Control Desk Mail ' station Pl-137 Wuhington, DC 20555 sus.iect:

Duane Arnoly Energ) Center Doch t No: 50 331

09. I.icenw No:

DPb 49 Revision to DAEC Security Plan (SPC-25)i Oclet ion of Addendum Describing-Scone and Schedale for.

Security upgrades at the DAEC Intake Structure

Reference:

Lo t.t e r :

Hineck (IFLP) to NRC, Revision of DAEC Security Plan (SPC-24), dated June 18, 1990 File.

A-53

Dear Dr. Murley:

lowc Electric Light and Power Company has made changes to the Duane Arnold

~

Enorgy Center (DAEC) Security Plan pursuant to the previsions of 10 CFR S-50.54(p)

These changes are reflected in Security-Plan Change number 25 (SPC-25) and have been reviewed in accordar.ce with the requirements of 10 CFR 6 50.54(p). We have determined that 'nene of the changes decreases the safeguards ef fect.ivennss of

'ne Security Plan or the Contingency Plan.

A copy of our-evaluation ie, a t.te c hed.

SPC-25 removes the Addendum addv1 hy SPC-24 (P,ef.) which described 'the planned-upgrades to the Securit.y measures for the OAEC Intake Structure ar.d the corrpensatory menures which were tw,lemented during construction of the upgt arte s.

The Addendum is being removed because the' upgrades have been completed and con:nensatory measures were discontinued on August 31, 1990.

SPC-25 also.medt f ins the Securit > Pian to in<:1ude the intake Struct.ure Security i

upgrades.

KITACHMENT CONTAINS (AFEGUARDS INFORMATION 9010160175 901004 PDR ADOCK 0S000331 F

PDC j

n 1

u

~

7 J

J r

\\

General 001ce

  • P.O. Bo.t 351
  • Cedar Itapids, lona 32406
  • 319!398 4411 4 -

3

Doepment Control Desk S-90 '08

Page 2.

e The attachments to this letter contain information of the type described in 10 CFR S 73.21; therefore, it should be withheld from public disclosure.

Very truly yours, i

(L Daniel L. Mineck-Manager, Nuclear Division DLM/SRC/pjv+

Attachments:

1.

Description of Security Plan Change SPC. -

2.

Evaluation of Change with Respect to 10 CFR S'50.54(p)-

3.

DAEC Security Plan Change No. 25 Update Instructions cc:

S. Catron w/o L. Liu w/o L. Root w/o R. McGaugby w/o J. R. Hall (NRC-NRR) w/o A. Bert Davis (Region III) 2 copies NRC Resident Office w/o 1

Commitment Control (Ref:900081) w/o i

j l

WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED l

1 i

ATTACHMENT CONTAINS.

-l SAFCGUARD3 INFORMATION i

4 Y

'O lowa Electric Light and Power Company October 4, 1990 s-90 -08 Or. ihortas E. Murley, Director Of fice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Document Contial Desk Mail Station P1-137 Wuhington, DC 20555

Subject:

Duane Arnold Energ) Center Doch t Ho: 50 331 Op. Licen n Ho:

OPir49 Revision to DAEC Security P.lan (SPC-25): Ocletion c.f Addendum Describing. Scope and Schedale for Securit,y lipgrades at the DAEC Intake Structure

Reference:

Letter:

Hineck (IFLP) to NRC, Revision of DAEC Security P1an (SPC-?4), dated June 18, 1990 File:

A-53

Dear Dr Morley:

I w Clectric Light and Power Company has made changes to the Duane Arnold Enorgy Center (DAEC) Security Plan pursuant. to the provisions of 10 CFR 4 50.54(p)

These changes are reflected in Si,curity Plan Cha: ige number ~25 (SPC-25) arid have been reviewed in accordar.co with t.he requirements of 10 CFR $ 50.54(p). We have determined that none of the chwges decreases.the safeguards effect.tveness of uie Security Plan or the Contingency Plan.

A copy of.our evaluation is atteched.

SPC-25 removes the Addendum added by SPC-24 (P,ef.) which described t.he plannr:d upgrades to the Securit.y measures for the OtJ.C Intake Structure and the corrpensatory menures which cere implernented during construction of the-upgiades.

The Addendum is being retrovt.d because the upgrades have been completed and comiensatory pen ures $cre discontinued on August 31, 1990.

SPC-25 also modifies the Security Plan to include the intake Struct.uce Security upgrades.

ATTACMMENT CONTAINS cAFEGUARDS INFORMATION 9010160175 901004 PDR ADOCK 05000331

[ j F

PDC General Office

  • P O. Iku 35I e Cedar Rapids, lona 52406
  • 319/398 44II J

4 Document Control Desk-

, - S-9h'08

. Page 2 f

- The attachments to this -letter contain information of the type described in 10 CFR S 73.21; therefore, it should be withheld from public disclosure.

Very truly yours, l

(p.

Daniel L. Mineck Manager, Nuclear Division DLM/SRC/pjv+

Attachments:

1.

Description of Security Plan Change SPC :

2.

Evaluation of Change with-Respect to 10 CFR $ 50.54(p)

~

3.

DAEC Security Plan Change No. 25 Update Instructions-cc:. S. Catron w/o L. Liu w/o a

L. Root w/o 1

R._McGaughy w/o J. R. Hall (NRC-NRR) w/o A. Bert Davis (Region III) 2 copies NRC Resident Office w/o Commitment Control (Ref:900081) w/o-I WHEN-SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED l

l ATTACHMENT CONTAINS.-

SAFEGUARDS INFORMATION i

e

_. _ _ _ _ _