ML20064B209
| ML20064B209 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/02/1990 |
| From: | Crawford A PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20064B210 | List: |
| References | |
| P-90301, NUDOCS 9010150244 | |
| Download: ML20064B209 (1) | |
Text
ll Il g h Public Service' ON October 2, 1990 P.O. Box 840 Fort St. Vrain Denver CO 80201 0840 Unit No. 1 P-90301 A. Clegg Crawford Vice President Nuclear Operations U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.
20555 Docket No. 50-267
SUBJECT:
Final Report on Fluctuation Testing - RT500 Gentlemen:
Amendinont 20 to the Facility Operating Licenso DPR-34 required that the results of the ilu :tuation testing program (RT-500) be submitted for NRC review.
The fluctuation testing reports for fuel Cycles 2 and 3 have been submitted in previous correspondence.
The report on the testing performed during fuel Cycle 4 is encloned as an Attachment to this letter.
With the permanent shutdown of the Fort St. Vrain Nuclear Generating Station, public Service Company of Colorado considers the submittal of the attached report to be the last and final report on the fluctuation testing program in compliance with the 11censo conditions.
Should you havo questions on this matter, ploaco contact Mr.
M.
H.
Holmes at (303)480-6960.
Very truly yours, 0
V
\\
A. Clegg Crowford Vice President Nuclear Operations ACC/JCS/js Attachment Regional Administrator, Region IV cc:
ATTH:
Mr. J. B. Baird Technical Assistant I
Division of Reactor Projects Mr. D. Garrison Site Resident Inspector Fort St. Vrain 9010150244 901002 PDR ADOCK 05000267 P
PDC Aoot'n a