ML20064B209

From kanterella
Jump to navigation Jump to search
Forwards Fort St Vrain Cycle 4 RT-500L Test Rept, on Fluctuation Testing,Per Amend 28 to License DPR-34.Util Considers Encl to Be Last Rept on Fluctuation Testing Program Due to Permanent Shutdown of Facility
ML20064B209
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/02/1990
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064B210 List:
References
P-90301, NUDOCS 9010150244
Download: ML20064B209 (1)


Text

ll Il g h Public Service' October 2, 1990 ON P.O. Box 840 Fort St. Vrain Denver CO 80201 0840 Unit No. 1 P-90301 A. Clegg Crawford Vice President Nuclear Operations U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Docket No. 50-267

SUBJECT:

Final Report on Fluctuation Testing - RT500 Gentlemen:

Amendinont 20 to the Facility Operating Licenso DPR-34 required that the results of the ilu :tuation testing program (RT-500) be submitted for NRC review. The fluctuation testing reports for fuel Cycles 2 and 3 have been submitted in previous correspondence. The report on the testing performed during fuel Cycle 4 is encloned as an Attachment to this letter.

With the permanent shutdown of the Fort St. Vrain Nuclear Generating Station, public Service Company of Colorado considers the submittal of the attached report to be the last and final report on the fluctuation testing program in compliance with the conditions. 11censo Should you havo questions on this matter, ploaco contact Mr. M. H.

Holmes at (303)480-6960.

Very truly yours, 0

V \

A. Clegg Crowford Vice President Nuclear Operations ACC/JCS/js Attachment cc: Regional Administrator, Region IV ATTH: Mr. J. B. Baird Technical Assistant I Division of Reactor Projects Mr. D. Garrison Site Resident Inspector Fort St. Vrain 9010150244 901002 PDR ADOCK 05000267 P PDC Aoot

'n a