Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-LTR-91-063, Notifies of Change in Operator or Senior Operator Status Re DB Price Who Terminated Employment on 910426 + (07:02:57, 15 December 2024)
- W3P83-2399, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept + (07:02:58, 15 December 2024)
- ML20077A712 + (07:02:58, 15 December 2024)
- ML20077A709 + (07:02:59, 15 December 2024)
- ML20077A708 + (07:02:59, 15 December 2024)
- ML20077A707 + (07:03:00, 15 December 2024)
- ML20077A703 + (07:03:07, 15 December 2024)
- ML20077A698 + (07:03:22, 15 December 2024)
- ML20077A696 + (07:03:29, 15 December 2024)
- ML20077A690 + (07:03:36, 15 December 2024)
- ML20077A684 + (07:03:37, 15 December 2024)
- ML20077A688 + (07:03:37, 15 December 2024)
- ML20077A683 + (07:03:38, 15 December 2024)
- ML20077A679 + (07:03:38, 15 December 2024)
- LIC-94-0237, Monthly Operating Rept for Oct 1994 for Fort Calhoun Station + (07:03:39, 15 December 2024)
- ML20077A677 + (07:03:39, 15 December 2024)
- ML20077A672 + (07:03:40, 15 December 2024)
- ML20077A666 + (07:03:41, 15 December 2024)
- ML20077A670 + (07:03:41, 15 December 2024)
- ML20077A664 + (07:03:42, 15 December 2024)
- ML20077A663 + (07:03:42, 15 December 2024)
- ML20077A660 + (07:03:43, 15 December 2024)
- ML20077A661 + (07:03:43, 15 December 2024)
- ML20077A659 + (07:03:44, 15 December 2024)
- ML20077A656 + (07:03:45, 15 December 2024)
- ML20077A654 + (07:03:45, 15 December 2024)
- L-83-296, Responds to NRC Re Violations Noted in IE Insp Rept 50-335/83-08.Corrective Actions:Computerized Capability of Flagging Timely Events Being Developed & Event Status Will Be Provided to Mgt + (07:03:46, 15 December 2024)
- ML20077A652 + (07:03:46, 15 December 2024)
- L-83-371, Provides Addl Info Re Violations Noted in IE Insp Rept 50-335/83-08.Corrective Actions:Codes & Insp Section Will Develop Necessary Procedures & Revs to QA Manual Prior to Next Refueling Outage in Oct 1983 + (07:03:47, 15 December 2024)
- ML20077A641 + (07:03:47, 15 December 2024)
- ML20077A637 + (07:03:48, 15 December 2024)
- ML20077A632 + (07:03:55, 15 December 2024)
- ML20077A623 + (07:04:03, 15 December 2024)
- ML20077A621 + (07:04:04, 15 December 2024)
- ML20077A620 + (07:04:04, 15 December 2024)
- BSEP-94-0401, Application for Amends to Licenses DPR-62 & DPR-71,revising TS 3/4.6.1.2 by Adopting Wording for Primary Containment Integrated Leak Rate Testing Consistent W/Requirements of BWR-4 Improved STS (NUREG-1433) + (07:04:14, 15 December 2024)
- ML20077A604 + (07:04:15, 15 December 2024)
- ST-HL-AE-4929, Forwards Relief Request RR-ENG-13 from ASME Section B&PV Code,Section XI Requirements in Order to Defer Permanent Repair of Flaw in STP Unit 2 Rmwst,Per GL 90-05 + (07:04:15, 15 December 2024)
- ML20077A599 + (07:04:23, 15 December 2024)
- ML20077A602 + (07:04:23, 15 December 2024)
- AECM-83-0026, Provides Formal Documentation of Analyses Performed Per SER Section 6.2.8 to Determine Min Design Thickness of Main Steam Line & Feedwater Line Flued Heads.Info Re Design Ability to Maintain Svc Metal Temp Also Encl + (07:04:24, 15 December 2024)
- ML20077A582 + (07:04:30, 15 December 2024)
- ML20077A570 + (07:04:37, 15 December 2024)
- ML20077A579 + (07:04:37, 15 December 2024)
- ML20077A568 + (07:04:38, 15 December 2024)
- ML20077A563 + (07:04:39, 15 December 2024)
- ML20077A559 + (07:04:40, 15 December 2024)
- ML20077A560 + (07:04:40, 15 December 2024)
- JPN-94-060, Forwards Siemens Power Corp (SPC) Nonproprietary Repts & Proprietary Rept Re Lead Fuel Assembly Installation During Reload 11/Cycle 12.SPC Proprietary Rept Withheld + (07:04:41, 15 December 2024)
- ML20077A556 + (07:04:41, 15 December 2024)
- ML20077A553 + (07:04:42, 15 December 2024)
- ML20077A550 + (07:04:43, 15 December 2024)