Monthly Operating Rept for Apr 1991 for Vermont Yankee
ML20077A712
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/30/1991
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-91-120, NUDOCS 9105100355
Download: ML20077A712 (6)


Text

._._

i V dthiONT YANKEE NUCLEAR POWER CORPORATION

~f,

\\-

P.O. Box 157, Governor Hunt Road

  1. (

Vernon. Vermont 05354-0157 (802) 257 7711 qn

~...

May 10, 1991 VYV 91-120

)

I l

U.S. Nuclear Regulatory Commission ATTN Document control Desk i-Washington, D.C.

20555 D' ear Sir t

l Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of April, 1991.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.

[ tt< -

M#

Warren P Mur y

Senior V ce Pres e

, Operations

,cc:

1) USNRC Region I l

475 Allendale Road King of Prussia, PA 19406.

2) USNRC R6sident Inspector, VYNPS o

-DP 0411 Rev. 3

Page 1 of 1 l

'9105100355 910430 l.

PDR' ADOCK 05000271 R.

PDR

[M%

'/L_j

4 i

i l

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 91-04 FOR THE MONTH OF APRIL, 1991 DP 0411 Rev. 3 Page 1 of 1

=

i-OPERATING DATA REPORT DOCKET NO.

50-271 DATE 910510 COMPLETED BY G.A.

WALLIN TELEPHONE 18021257-7711 OPERATING STATUS 1.

Unit-Names Vermont Yankee j

3.-Reporting Period:

April NOTES:

3. Licensod Thermal Power (MWt):1593 4.LNameplate Rating (Gross MWe):

512

5. Design-Electrical Rating (Net MWe):

514(oc)'504(cc) 6.-Maximum Dependable Capacity (Gross MWe):

115

'7. Maximum-Dependable' Capacity (Net MWe):

121 8.

If changes, occur in capacity ratings (Items Number 3 through 7) since last report,_give reasons:

N/A 9.

Power level to-which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date cumulative i

11 '. Hours in Reporting Period 719.00 2879.00 161399.00

12. Number Of. Hours Reactor was Critical 562.80 2638.70 130827.33
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line:

550.95_

2599.25 127970.85 15.-Unit Reserve Shutdown. Hours.

0.00 0.00 0.00 16.' Gross'ThermalLEnergy Generated (MWH) 867786.50 4090168.00 189405471xQQ i

17.= Gross Electrical Energy-Generated 291614.00 1377923.00 631?5418.00 i

1

18. _ Net Electrical: Energy Generated (MWH) 279186.00 1221494.00 59953464.00 19.-Unit Service Factor 76.63 90.28 78.46 130. Unit Availability 1 Factor 76.63 90.28 78.46 131. Unit = Capacity Factor (Uning MDC Net)1 77.04 91.07 72.93
33. UnitLCapacity Factor (Using DER Net) 75.54 89.30 71.51 33.' Unit Forced: Outage Rate 23.37 9.72 5.61 h
34. Shutdowns scheduled:over.next 6 months (Type, Date, and Duration of Eacht-N/A-

-25. If-shut down at end of. report period, estimated date of-startup: N/A.

13 6. Units'In Test. Status (prior to commercial operation): N/A Forecast Achieved i

. INITIAL CRITICALITY-INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP;0411 Rev. 3

.Page 1 of 1-

.RT-No. 13.F01.19F

,.i+.._w

...1u.-,----,.

.o..

....... -m

~... i....-~

..-.m

.,,--.-....~~..-..,..,-,---4.....

.. J. - r v

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Vermont Yankgg DATE 910510 COMPLETED BY G.A. WALLIN TELEPHONE f802)257-7711 MONTH April DAY AVERAGE DAILY-POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

514 17.

516 2.

514 18.

516 3.

511 19, 515 4.

508 20.

515 5.

509 21.

515 6.

509 22.

516 7.*

487 23.

318 8.

510 24.

0 9.

514 25.

0 10.

515 26.

0 11.

514 27.

0 12.

515 28.

0 13, 516 29.

O 14.

515 30.

39 i

i l

15.

516 31.

16.

516

  • -23 hour day INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18V l'

~

UNIT. SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH APRIL DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 910510 COMPLETED BY G.A.

Wallin TELEPHONE (802)257-7711 1

2 3

No.

Date Type Duration Reason Method of License System Component Cause and Corrective (hours)

Shutting Event Code Code Action to Prevent a

Down Report #

4 5

Recurrence Reactor 91-05 910423 F_

168.05 B

3 91-09 ED XXXXXX Turbine trip / reactor scram due to a generator full load reject caused by switchyard battery maintenance l'

F: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions S: Scheduled A-Equipment Failure-(Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for Licensc C-Refueling 3 - Automatic Scram Event Report (LER) File D-Regulatory Restriction 4 - Other (Explain)

(NUREG 0161)

E-Operator Training and License Examination 5 Exhibit I - Same Source VYDPF 0411.03 F-Administrative I

DP 0411 Rev. 3 G-Operational Error (Explain)

- Page 1 of 1 H-(Explain) j 4

l

DOCKET No.

50-271 DATE 910510 COMPLETED BY G.A.

WALLIN TELEPHONE (802)257-7711 REPORT MONTH APRIL EEM_ MARY OF OPERATING EXPERIENCES Hiahlichts Vermont Yankee operated at.75.8% of rated thermal power for the month.

Gross electrical generation was 291.614 MWHe or 75.1% design electrical capacity.

gperatina Summary The following is a chronological description of plant operations including other portinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

910423 At 1448 hours0.0168 days <br />0.402 hours <br />0.00239 weeks <br />5.50964e-4 months <br />, switchyard battery maintenance resulted in a generator full load reject, turbine trip and subsequent reactor scram. (See Unit Shutdowns and Power Reductions) 910430 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />, the reactor was critical and a return to full power was initiated.

910430 At 1451 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.521055e-4 months <br />, the turbine-generator was phased to the grid.

At the end of the reporting period the plant was operating at liull of rated thermal power.

VYDPF 0411.04 DP 0411 Rev. 3 Page 1 of 1 RT No. 13.F01.18X

..