1 s
o CPERATINS DATA REPORT DOCKET NO 50-369 DATE Dyeeter 15. lH4 OPERATING STATUS COMPLETED SY R.A. Williaes TELEPH0hE 704-382-5346
- 1. Unit Nase: McGuire 1
- 2. Reporting feriod: Octcher 1, 1994-October 31,1994
- 3. Licensed Thereal Power (MWti:
3411
- 4. Naseplate Rating (Sross MWe):
1305*
Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1100 (Gross MWe) calculated as
- 6. Maxins Dependable Capacity (Gress MWe):
1171 1450.000 MVA x.90 power
- 7. Maxiada Dependable Capacity (Net MWe):
1129 factor per Page lii, B. If Changes Occur in Capacity Ratings (Iteas Nusber 3 Throcgi 71 Since Last NURE6-0020.
i Repert. Give Reasons:
- 9. Power Level To Which Festricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
Ihis Month Yr.-to-Date Cuaulative 1
- 11. Hours In Reporting Peried 745.0 7296.0 113232.0
- 12. N: ster Of riours Reactor Was Critical 150.3 4074.9 78895.4
- 13. Reacter Reserve Snutdcwn Hours
--0--
--0-- -
- 14. Nurs Becerator On-Line 111.2 4829.2 78048.7
- 15. Unit Reserve Shatdown Hcurs
--0--
--0--
--0--
- 16. Gross Toersal Energy Benerated (MWH) 262464 16113490 242938326
- 17. Gross Electrical Energy Generated (MWH) 89014 5464172 83426327
- 19. Net Electrical Energy Generated (MWH) 69242 5214079 79648229
- 19. Unit Service Facter 14.9 66.2 68.9
- 20. Unit Availability Factor 14.9 66.2 68.9
- 21. Unit Capacity Factor (Using MDC Net) 8.2 63.3 61.3
- 22. Da t Capacity Factor (Using DER Net) 7.9 60.6 59.6
- 23. Unit Forced Outage Rate 78,9 20.2 14.7
- 24. Shutden, Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At EM Of Report Feriod. Esticated Date of Startup:
- 26. Units in Test Status (Prict to Coseercial Operatien):
Fore ast Achieved IN!IIAL CRITICALITf INITIAL ELECTUCITY COMERCIAL OPERATION 9411250133 94131 DR ADOCK 05000569 PDR
5 0FERAIiNS DATA 6EPORI 00CrET NO 50-3e9 UNIT McGuire 1 DATE November 15. 1994 COMPLETED By R.A. Williams TELEPHONE 704-382-5346 M0hfH Octeter,1994 0f AVEEAGE DA!LY POWER LEVEL p_A1 AVERASE DAILY POWER LEVEL (MWe-Net)
(NWe-het) 1 0
17 0
~2
-0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
i 7
0 23 0
6 0
24 0
9 0
25 0
10 0
26 0
11 0
27
$9 12 0
28 300 13 0
29 824 14 0
30 1098 15 0
31
!!27 16 0
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME M w u l u t.
1 DATE 11/13/94' REPORT MONTH October 1994 COMPLETED BY x.
a.
williams TELEPHONE
(/v4)-auz-oJ46 (1)
R)
PIET-(2 (3)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
94 1 S
221.03 C
RC FUELXX END-OF-CYCLE 9 REFUELING OUTAGE 4
94-10-10 F
96.00 A
CB PUMPXX 4 DAY OUTAGE DELAY DUE TO REACTOR COOLANT PUMP SEAL "C" REPAIR SF VALVEX 13.2 DAY OUTAGE DELAY DUE TO SAFETY 5
94-10-14 F
316.73 A
INJECTION VALVES TESTING, INSPECTION AND REPAIR 6-P 94-10-28 F
B CH XXXXXX AUXILIARY FEEDWATER FLOW BALANCE (1)
(2)
(3)
(4)
F Forced Reason
- Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
. - ~.
W DOCKET: 50-369 UNIT: McGuire 1 Date:
11/15/94 NARRATIVE
SUMMARY
MONTH: October 1994 McGuire Unit 1 began the month of October in end-of-cycle 9 refueling outage. The outage has been 69.20 days and was scheduled for 52 days. The refueling outage was delayed an additional; 4 days due to reactor coolant pump seal "C" repair and 13.2 days due to safety injection valve testing, inspection and repair. The unit was placed on-line 10/27/94 at 0946. During power escalation, the unit held at approximately 29% power on 10/28/94 from 0449 to 11/28/94 at 1150 due to auxiliary feedwater flow balance. The unit returned to 100% power on 10/30/94 at 0649 and operated at or near 100% power the remainder of the month.
1 l
l i
l l
i l
1 1
Prepared by:
R. A. Williams Telephone: (704)-382-5346 l
l l
~
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire.
Unit 1 l
2.
Scheduled next refueling shutdown: December 1995 3.
Scheduled restart following refueling: January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and j
i supporting information.
6.
Important licensing considerations (new or different design or l
supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 655 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
November 15. 1994 Name of
Contact:
R.
A.
Williams Phone:
(704)-382-5346 L
l
1 r
0FERAilh5 NIA REPORI DOCKET NO 50-370 DATE Novesber 15d99L EFEeATING STATUS COMPLETED BY R,A. Williaes TELEPHONE 704-382-5346
- 1. Unit hase: McGuire2
- 2. Reporting Feriod: Octcher 1, 1974-October 31,1994
- 3. Licensed theraal Power (MWt)t 3411
- 4. Niseplate Rating (Gross Ne):
1305*
Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1180 (Gross MWel calculated as
- 6. Maxtsus Dependable Capacity (Gross Wel:
1171 1450.000 MVA x.90 power
- 7. Maxista Dependable Capacity (Net Ne):
1129 factor per Page lii, S. If Changes Dccur in Capacity Ratings (Itees Netber 3 Through 7) Since Last NURE6-0020.
Repert. Give Reasons:
- 9. Fewer level To Whtch Restricted, if Any (Net MWe):
j 10 Reason For Restrictions, If any:
i h
i
-l l
This Month fr.-to-Date Cueulative e
i i
- 11. Hours In Reporting Feriod 745.0 7296.0 93528.0 i
- 12. Naber Cf tiours Reactor 6!as Critical 745.0 7153.4 72995.4 I
- 12. Reactc Reserve Shutdown Mrs
--0--
--0--
--0--
l
- 14. b rs Benerator On-Line 745.0 7151.1 72027.3 j
4
- 15. Unit Reserve Shutacan M rs
--0--
--0--
--0--
l J
- 16. 2ross Ibersal Er.ergy Ser.erated ( NH) 2533244 24246565 236118552 j
- 17. Gross Electrical Energy Generated (NH) 873076 8392070 82H1005 j
- 15. Net Electrical Energy Generated (NH) 840764 80805B3 79046703 i
- 19. 09it Service Facter 100.0 98.0 77.0 l
D. Urit Availability Factor 100.0 98.0 77.0 j
j
- 21. Unit Capacity Factor (Using P.DC Net) 100.0 98.1 74.0
- 22. Unit Capacity Factor fusing DER Net) 95.6 93.9 71.6 5
l
- 23. Uait Forced Duta;e Rate 0.0 2.0 6.7 i
- 24. Shutdenn Scneduled Over Next 6 Mths (Type, Date, ar.d Duration of Each):
i Refueling - November 24, 1994 - 57 days
}
]
- 25. If S at town At End Of Report Period. Estimated Date of Startup:
- 26. Uu ts Ir Test Status (Prior to Coseercial Operation):
Forecast Achieved J
I INITIAL CRITICALITY INITIAL ELECTRICITY l
COMERCIAL CPERATION 1
i a
i
I
-1 0FERAllh5 LATA REPCRI DOCKET NO 50-370' UNIT McGuire 2 DATE No,eeber 15. 1994 COMPLETED Bf R.A. Williaes TELEPHONE 704-382-5346 I
MONTH Odober,1994
- (31 AVERAGE DAILY F0WER LEVEL EAl AVERABE DAILY POWEP. LEVEL (MWe-Net)
(MWe-Net)
'I 17 1132 2
1119 18 -
1134 3
!!!4 19 1135 4
1!!?
20 1135 5
1119 21 1134 6
1123 22 -
1!36
~
!!?3 23 1133 8
1124 24
-1127 9
!!E6 25 1127 10 i!25
!6 1127 11 1126 27 1132 12
!!29 2B
!!35 13 1129 27 1136 14 1!30 30 1135 15 1131 31
!!35 16
!!31 2
L
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.
50-370 UNIT NAME ra.;uuixt. z DATE 11/13/94__.
REPORT MONTH October 1994 COMPLETED BY x.
rs. w1111ams TELEPHONE
(/U4)-J52-DJ4b (1)
A) 8Ei-(2 (3)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)C (2)
(3)
(4)
Forced Reason-Method:
Exhibit G - Instructions A-Equihment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (NUREG-0161))
(LER D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
( Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
4 t
i
~
a DOCKET: 50-370 l
UNIT:
McGuire 2 i
Date:
11/15/94 2
d NARRATIVE
SUMMARY
i.
4 f
MONTH: October 1994 McGuire Unit 2 began the month of October operating at 100% full power. The unit j
operated at or near 100% full power for the entire month.
1 i
i
)
1 1
l 1
J 4
l l
Prepared by:
R. A. Williams Telephone: (704)-382-5346
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown: November 1994 3.
Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by i
Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 817 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by l
present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
November 15, 1994 l
Name of
Contact:
R.
A.
Williams Phone:
(7041-382-5346 l