Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077B186 + (06:58:58, 15 December 2024)
- BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days + (06:58:59, 15 December 2024)
- ML20077B181 + (06:58:59, 15 December 2024)
- BSEP-83-1999, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-10 & 50-325/83-10.Corrective Actions: Administrative Instructions for Procedural Rev Being Rewritten + (06:59:00, 15 December 2024)
- ML20077B172 + (06:59:00, 15 December 2024)
- ML20077B157 + (06:59:01, 15 December 2024)
- ML20077B163 + (06:59:01, 15 December 2024)
- 0CAN078313, Provides Status & Overview of Waste Gas Sys Upgrades Per 821220 Commitment in Response to SALP Rept.Mods Include Replacing Large Amount of Carbon Steel Pipe W/Stainless Steel & Rerouting to Minimize Low Spots in Sys + (06:59:02, 15 December 2024)
- ML20077B153 + (06:59:03, 15 December 2024)
- ML20077B151 + (06:59:08, 15 December 2024)
- ML20077B140 + (06:59:22, 15 December 2024)
- ML20077B125 + (06:59:29, 15 December 2024)
- ML20077B115 + (06:59:42, 15 December 2024)
- ML20077B110 + (06:59:48, 15 December 2024)
- ML20077B093 + (06:59:49, 15 December 2024)
- 05000259/LER-1983-031-03, /03L-0:on 830614,during Performance of Instrument Checks & Observations,Nitrogen Level Transmitter LI-84-2A Found Indicating 100%.Caused by Leak in Sensing Line of Transmitter,Resulting in False High Readings + (06:59:58, 15 December 2024)
- ML20077B087 + (06:59:59, 15 December 2024)
- ML20077B062 + (07:00:00, 15 December 2024)
- 05000389/LER-1983-030-03, /03L-0:on 830610,channel D Low Component Cooling Water Reactor Coolant Pumps Spuriously Started Causing Timing to Trip.Caused by Spikes from Flow Transmitter. Transmitter Vented + (07:00:06, 15 December 2024)
- ML20077B050 + (07:00:07, 15 December 2024)
- ML20077B043 + (07:00:08, 15 December 2024)
- 05000259/LER-1983-034-03, /03L-0:on 830613,standby Gas Treatment Sys Train B Inoperable Due to Heaters Being Unavailable in Automatic. Caused by Incorrect Damper Adjustment.Damper Readjusted + (07:00:14, 15 December 2024)
- ML20077B029 + (07:00:15, 15 December 2024)
- 05000293/LER-1983-035-03, /03L-0:on 830610,three of Four Motor Operator Mounting Cap Screws Found Backed Out of Core Spray Test Valve MOV 1400-4A.Caused by Insufficient Cap Screw Torque. Screws Coated & Torqued + (07:00:21, 15 December 2024)
- ML20077A998 + (07:00:22, 15 December 2024)
- 0CAN068317, Responds to Request for Addl Info Re Violation Noted in IE Insp Rept 50-313/83-03 Concerning Failure to Follow Requirements for Changes to Refueling Shuttle Procedure. Procedure Modified to Detail Sequence Changes + (07:00:23, 15 December 2024)
- ML20077A978 + (07:00:29, 15 December 2024)
- ML20077A974 + (07:00:34, 15 December 2024)
- AECM-83-0165, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-78.Corrective Actions:Surveillance Conducted on 821125,w/independent Verification.Valves Positioned & Locked Per Instructions.Training Scheduled + (07:00:51, 15 December 2024)
- ML20077A954 + (07:00:51, 15 December 2024)
- AECM-83-0330, Submits Supplemental Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-78.Corrective Actions:Security Post Established to Conduct Insps of Control Room Cabinets Every 4 H & All Activities Logged + (07:00:52, 15 December 2024)
- ML20077A946 + (07:00:52, 15 December 2024)
- ML20077A938 + (07:00:53, 15 December 2024)
- ML20077A939 + (07:00:53, 15 December 2024)
- ML20077A919 + (07:00:54, 15 December 2024)
- ML20077A926 + (07:00:54, 15 December 2024)
- NG-94-3575, Request for TS Change (RTS-267),replacing Instrument Setpoint W/Ref to Appropriate Citation in Offsite Dose Assessment Manual & Modifying Operability Requirement & Required Action for Inoperable Offgas Vent Stack RMs + (07:00:55, 15 December 2024)
- ML20077A912 + (07:00:56, 15 December 2024)
- ML20077A900 + (07:00:56, 15 December 2024)
- ML20077A896 + (07:00:57, 15 December 2024)
- ML20077A899 + (07:00:57, 15 December 2024)
- ML20077A894 + (07:00:58, 15 December 2024)
- BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 + (07:00:59, 15 December 2024)
- ML20077A890 + (07:00:59, 15 December 2024)
- PLA-1748, Second Interim Part 21 Rept Re Inadequacies in Bechtel Design Verification of Max Circuit Lengths of Low Voltage Power & Control Cables.Initially Reported on 821215.Next Rept by 831031 + (07:01:00, 15 December 2024)
- ML20077A885 + (07:01:00, 15 December 2024)
- ML20077A863 + (07:01:10, 15 December 2024)
- ML20077A861 + (07:01:12, 15 December 2024)
- ML20077A856 + (07:01:12, 15 December 2024)
- ML20077A851 + (07:01:13, 15 December 2024)
- ML20077A839 + (07:01:27, 15 December 2024)