Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080P968 + (13:48:30, 14 December 2024)
- ML20080P963 + (13:48:31, 14 December 2024)
- ML20080P959 + (13:48:35, 14 December 2024)
- ML20080P960 + (13:48:35, 14 December 2024)
- ML20080P957 + (13:48:36, 14 December 2024)
- ML20080P949 + (13:48:36, 14 December 2024)
- 05000361/LER-1983-113-03, /03L-0:on 830825,while in Mode 1,shiftly Surveillance on Control Element Assembly Calculator 2 Revealed That Three Auto Restarts Occurred within 12 H. Caused by Poorly Seated Disc Interface Card + (13:48:38, 14 December 2024)
- ML20080P945 + (13:48:39, 14 December 2024)
- ML20080P937 + (13:48:40, 14 December 2024)
- ML20080P942 + (13:48:40, 14 December 2024)
- ML20080P934 + (13:48:41, 14 December 2024)
- NG-95-0482, Requests That RM Herdegen & Jm Pladsen Tkae BWR Generic Fundamental Exam Section of Written Operator Licensing Exam + (13:48:41, 14 December 2024)
- 05000373/LER-1983-105-01, /01T-0:on 830914,reactor Water Level Rapidly Decreased from 50 Inches to 0 Inches Causing Group VI PCIS Initiation at 12.5 Inches During Valve Lineup.Caused by Injection Check Valve Being Stuck Open + (13:48:43, 14 December 2024)
- AECM-84-0103, Comprehensive Rept on Standby Diesel Generators - Significant Activities to Enhance & Verify Reliability + (13:48:45, 14 December 2024)
- ML20080P926 + (13:48:45, 14 December 2024)
- ML20080P924 + (13:48:46, 14 December 2024)
- 05000237/LER-1983-063-03, /03L-0:on 830830,while Performing MSIV 1090 Closure Test Procedure DOS-250-1,double Indication Occurred on MSIV 2-203-1B When Test Button Released.Caused by Ground on Limit Switch 1B.Circuit Will Be Corrected + (13:48:48, 14 December 2024)
- ML20080P921 + (13:48:49, 14 December 2024)
- ML20080P918 + (13:48:49, 14 December 2024)
- 05000282/LER-1983-021-03, /03L-0:on 830830,during Surveillance Test MV-32035,cooling Water Header Isolation Valve B Failed to Close.Caused by Failure of GE Auxiliary Switch,Part CR105X100P.Switch Replaced + (13:48:51, 14 December 2024)
- ST-HL-AE-4999, Forwards Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld + (13:48:52, 14 December 2024)
- ML20080P913 + (13:48:53, 14 December 2024)
- ML20080P909 + (13:48:53, 14 December 2024)
- ML20080P907 + (13:48:54, 14 December 2024)
- ML20080P900 + (13:48:54, 14 December 2024)
- ML20080P897 + (13:48:55, 14 December 2024)
- ML20080P889 + (13:48:56, 14 December 2024)
- ML20080P894 + (13:48:56, 14 December 2024)
- ML20080P887 + (13:48:57, 14 December 2024)
- ML20080P888 + (13:48:57, 14 December 2024)
- ML20080P882 + (13:48:58, 14 December 2024)
- 05000334/LER-1995-002, :on 950130,SR 480 Volt Bus Found Seismically Unqualified.Caused by Improper Installation of Rear Mounting Anchor of MCC-E7 During Initial Const.Installed Seismically Qualified Tie Straps + (13:48:59, 14 December 2024)
- ML20080P874 + (13:49:00, 14 December 2024)
- ML20080P872 + (13:49:01, 14 December 2024)
- ML20080P871 + (13:49:02, 14 December 2024)
- BECO-LTR-95-026, Submits FFD Program Performance Data for Period of 940701- 1231 + (13:49:03, 14 December 2024)
- ML20080P869 + (13:49:03, 14 December 2024)
- 0CAN098310, Forwards Updated Radiological Effluent Tech Specs & Offsite Dose Calculation Manual,Per 830510 Request.Implementation Date of 850101 Established + (13:49:05, 14 December 2024)
- ML20080P864 + (13:49:05, 14 December 2024)
- ML20080P858 + (13:49:06, 14 December 2024)
- ML20080P855 + (13:49:06, 14 December 2024)
- 05000362/LER-1983-106-01, /01L-0:on 830907,surveillance Testing Resulted in Unsatisfactory Float Voltage for Pilot Cells 11 & 13 & Unsatisfactory Total Battery Terminal Voltage.Caused by Personnel Error + (13:49:08, 14 December 2024)
- 05000443/LER-1994-019, :on 940124,voluntary LER for Electrical Relay Failures Occurred.Caused by Damaged Roller Bearings on Relay Coil Assembly.Replaced All Installed GE Hea Relays W/Electroswitch LOR-1 + (13:49:11, 14 December 2024)
- RA-95-0037, Forwards Summary of Description of Proposed Vehicle Control Measures & Vehicle Bomb Comparison.Encl Withheld + (13:49:11, 14 December 2024)
- 05000361/LER-1983-075-03, /03L-0:on 830828,regulating Control Element Assembly Group 6 Exceeded Time Allowed for long-term steady-state Insertion Limit.Caused by Use of Assemblies to Control Axial Shape Index Oscillations + (13:49:13, 14 December 2024)
- ML20080P848 + (13:49:14, 14 December 2024)
- ML20080P847 + (13:49:15, 14 December 2024)
- 05000361/LER-1984-004, :on 840116,train a Containment Purge Isolation Sys Spuriously Actuated.Caused by Subgroup Relay Actuation Voltage Transient on ESF Bus.No Corrective Action Planned as Minor Transients Expected in Test + (13:49:16, 14 December 2024)
- 05000361/LER-1983-120-03, /03L-0:on 830829 & 31,flow Control Valve 2FV-0318 for Iodine Removal Sys Failed to Open & Declared Inoperable.Caused by Cracked O-ring Allowing High Pressure Oil to Leak to Low Pressure Side + (13:49:18, 14 December 2024)
- ML20080P842 + (13:49:19, 14 December 2024)
- ML20080P841 + (13:49:20, 14 December 2024)
- BECO-84-029, Forwards Rev 1 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rev Corrects Error Noted on Page 13 Re Plant Response to MSIV Closure + (13:49:21, 14 December 2024)