UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20S55
Dear Mr. Denton:
ULNRC-671 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 QUARTERLY PROGRESS UPDATE
Reference:
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant.
Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.
Sincerely, DS/ls cc:
C. J. Dougherty E. K. Dille
\\
8310120069 831003 PDR ADOCK 05000483 1 0 R
O PPat Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388
Dear Mr. Schwencer:
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.
Table 7.6-5
- This table has been revised to include the APRM Upscale Thermal Trip.
1 These revisions will be incorporated into the next amendment to the FSAR.
Very truly s,
b) u#
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc:
R. L. Perch NBC y
1 i
i l
8310120067 831006 PDR ADOCK 05000388 A
.