Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080Q432 + (13:45:12, 14 December 2024)
- ML20080Q430 + (13:45:13, 14 December 2024)
- ML20080Q424 + (13:45:20, 14 December 2024)
- ML20080Q423 + (13:45:21, 14 December 2024)
- ML20080Q419 + (13:45:22, 14 December 2024)
- ML20080Q418 + (13:45:22, 14 December 2024)
- ML20080Q411 + (13:45:30, 14 December 2024)
- ML20080Q406 + (13:45:31, 14 December 2024)
- ML20080Q401 + (13:45:40, 14 December 2024)
- ML20080Q399 + (13:45:42, 14 December 2024)
- ML20080Q395 + (13:45:42, 14 December 2024)
- DCL-95-039, Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo + (13:45:43, 14 December 2024)
- ML20080Q385 + (13:45:44, 14 December 2024)
- ML20080Q389 + (13:45:44, 14 December 2024)
- ML20080Q383 + (13:45:45, 14 December 2024)
- ML20080Q374 + (13:45:46, 14 December 2024)
- ML20080Q380 + (13:45:46, 14 December 2024)
- 1CAN028404, Responds to 840125 Request for Schedule for Submittal of Addl Info on Seismic Qualification of Emergency Feedwater Sys.Info Will Be Submitted by 840316 + (13:45:47, 14 December 2024)
- AECM-84-0097, Requests Extension for Submittal of ECCS Reliability Analysis for Agastat Relay Test Intervals Until 840302,to Enable Further Resolution of Internally Generated Comments on GE Analysis + (13:45:47, 14 December 2024)
- ML20080Q358 + (13:45:55, 14 December 2024)
- ML20080Q356 + (13:45:56, 14 December 2024)
- ML20080Q349 + (13:45:56, 14 December 2024)
- ML20080Q344 + (13:45:57, 14 December 2024)
- ML20080Q342 + (13:45:58, 14 December 2024)
- ML20080Q340 + (13:45:58, 14 December 2024)
- ML20080Q339 + (13:45:59, 14 December 2024)
- ML20080Q335 + (13:46:00, 14 December 2024)
- ML20080Q330 + (13:46:00, 14 December 2024)
- ML20080Q321 + (13:46:08, 14 December 2024)
- ML20080Q318 + (13:46:08, 14 December 2024)
- B11030, Forwards Boron Dilution Analysis,Per Reg Guide 1.70 & NUREG-0880,for Failures in Chemical & Vol Control Sys,Based on Westinghouse STS Setpoints & Limits.No Design Changes Recommended or Implied.W/O Encl + (13:46:09, 14 December 2024)
- ML20080Q316 + (13:46:09, 14 December 2024)
- ML20080Q311 + (13:46:10, 14 December 2024)
- ML20080Q307 + (13:46:11, 14 December 2024)
- 05000348/LER-1983-038, Forwards LERs 83-060/03L-0,83-061/03L-0,83-037/03L-0 & 83-038/03L-0.W/o LER 83-038/03L-0 + (13:46:18, 14 December 2024)
- ML20080Q299 + (13:46:19, 14 December 2024)
- ML20080Q297 + (13:46:19, 14 December 2024)
- AECM-83-0652, Advises That Due to Uncertainty in Instrumentation Availability & Manpower Resources,Instrumentation Necessary to Meet Reg Guide 1.97 Requirements Will Be Implemented by Third Refueling Outage Per Suppl 1 to NUREG-0737 + (13:46:20, 14 December 2024)
- ML20080Q289 + (13:46:27, 14 December 2024)
- ML20080Q286 + (13:46:28, 14 December 2024)
- B11029, Forwards Probabilistic Safety Study Input Listings for Listed Computer Codes/Cases.W/O Encl + (13:46:35, 14 December 2024)
- ML20080Q280 + (13:46:36, 14 December 2024)
- ML20080Q276 + (13:46:43, 14 December 2024)
- ML20080Q273 + (13:46:44, 14 December 2024)
- ML20080Q266 + (13:46:51, 14 December 2024)
- ML20080Q263 + (13:46:52, 14 December 2024)
- ML20080Q261 + (13:46:52, 14 December 2024)
- U-602426, Ro:On 950301,plant Was Operating at Approx 75% Fire Was Reported in a turbine-driven Reactor Feed Pump Room + (13:46:53, 14 December 2024)
- 05000346/LER-1983-048-03, /03L-0:on 830901,four HPI Stop Check Valves Found Malfunctioning,In Violation of Tech Specs.Caused by Design Deficiency.Disk in HP49 Replaced w/33 Degree Seat Angle Design + (13:47:00, 14 December 2024)
- ML20080Q239 + (13:47:02, 14 December 2024)
- ML20080Q236 + (13:47:02, 14 December 2024)
- ML20080Q234 + (13:47:03, 14 December 2024)